# Sec. 2243. Federal Energy Regulatory Commission personnel safety

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/2243)

## Summary

Lets FERC authorize its employees to perform law enforcement duties to protect the Chairman and Commissioners. ([p. 363, line 3 to p. 363, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=363))

## Key points

- Protective detail authority for FERC commissioners ([p. 363, line 3 to p. 363, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=363))

## Selected statutory quotes

> to perform law enforcement duties as needed to ensure the safety of the Chairman and Commissioners of the Federal Energy Regulatory Commission

[p. 363, line 5 to p. 363, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=363)

Security for FERC commissioners.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

New.

### EPRA 2024 (reported S. 4753)

Carried over from EPRA 2024 (sec. 804).

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 363, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=363) (indent level 0)

The Federal Energy Regulatory Commission may authorize employees of the Federal Energy Regulatory Commission to perform law enforcement duties as needed to ensure the safety of the Chairman and Commissioners of the Federal Energy Regulatory Commission in the performance of the official duties of the Chairman and Commissioners, respectively.

