---
id: 2026-01-comfyui-manager-unprotected-config-channel-cve-2025-67303-exposed-servers-fixed-3-38
title: "ComfyUI-Manager before 3.38: an unauthenticated caller can change its configuration (CVE-2025-67303), and exposed ComfyUI servers were targeted"
date_disclosed: 2026-01-05
last_updated: 2026-11-16
severity: high
status: patched
ecosystems: [comfyui, comfyui-manager, pypi, python, image-generation, self-hosted-ai]
tools_affected: ["ComfyUI-Manager before 3.38", "ComfyUI before 0.3.76 (the vendor advisory lists both packages)", "any ComfyUI server reachable from the internet without authentication"]
tags: [cve, comfyui, comfyui-manager, unauthenticated, exposed-instances, custom-nodes, censys, self-hosted-ai, backfill]
---

## TL;DR
ComfyUI-Manager, the extension most ComfyUI installs use to add custom nodes, let an unauthenticated network caller change its configuration data (CVE-2025-67303, CVSS 7.5). Upgrade ComfyUI-Manager to 3.39.2 or later on the 3.x line, or 4.0.5 or later, and ComfyUI to 0.3.76 or later. Version 3.38 fixes this id and is still affected by a second advisory. In April 2026 Censys reported a campaign against internet-exposed ComfyUI servers, and a Cloud Security Alliance note links it to this flaw. If your server was reachable from the internet on an older version, rebuild it and rotate its credentials.

## What happened

The vendor advisory GHSA-95pq-hr8p-f5g7, "Unprotected Alternate Channel in ComfyUI-Manager (CWE-420)", was published on 2026-01-11. It lists `comfyui-manager` before 3.38 and `comfyui` before 0.3.76 as affected, with a score of 7.5 (`CVSS:3.1/AV:N/AC:L/PR:N/UI:N/S:U/C:N/I:H/A:N`).

The CVE record, from MITRE and dated 2026-01-05, has no title, and its vendor, product and version fields all read "n/a". A scanner that reads only the record has no range to match. The record's 7.5 score comes from CISA. The versions come from the vendor advisory.

**The campaign.** The Hacker News reported on 2026-04-07 that Censys had found a campaign against exposed ComfyUI servers, and quoted a count of "more than 1,000 publicly-accessible ComfyUI instances". Its account is that the campaign runs code on unauthenticated servers through custom nodes already installed, and uses ComfyUI-Manager to install a node package when none of its target nodes is present. The article names no CVE. A Cloud Security Alliance research note of 2026-04-08 is the source that ties the campaign to CVE-2025-67303, and it gives the fix as ComfyUI-Manager 3.38 with ComfyUI 0.3.76 or later. Both are accounts of Censys's research. The count is of exposed servers, not of compromised ones.

The Hacker News names four community node packages the campaign looked for or installed: `Vova75Rus/ComfyUI-Shell-Executor`, `filliptm/ComfyUI_Fill-Nodes`, `seanlynch/srl-nodes` and `ruiqutech/ComfyUI-RuiquNodes`. It calls `ComfyUI-Shell-Executor` a malicious package created by the attacker. The Cloud Security Alliance note, which names the four owners only, says the other three are legitimate nodes not designed for malicious purposes. Not checked: the four repositories.

**A second advisory.** GHSA-562r-8445-54r2 (CVE-2026-22777, high, 2026-01-10) is a CRLF injection in the configuration handler, fixed in 3.39.2 and 4.0.5.

**Versions on PyPI.** `comfyui-manager` on PyPI has 36 releases, all on the 4.x line, from 4.0 (2025-04-10) to 4.4 (2026-11-15). No 3.x version was published there, so 3.38 exists only as a git tag. The vendor advisory for CVE-2025-67303 gives no range for the 4.x line. The second advisory does: 4.0.0 through 4.0.4 are affected and 4.0.5 (2026-01-08) is fixed. The repository has tags and no GitHub releases.

## Am I affected?

```bash
pip show comfyui-manager 2>/dev/null | grep -E '^(Name|Version)'
```

- A git install under `custom_nodes`: affected before 3.38, or with ComfyUI before 0.3.76. Read the version in the Manager's own menu.
- A pip install: take 4.0.5 or later. The advisory for CVE-2025-67303 does not say which 4.x versions it covers.
- Remove `ComfyUI-Shell-Executor` if it is present.
- Check `custom_nodes` for any package you did not install.
- Exposed: any server whose port was reachable from the internet.

## If you are affected

- Upgrade both packages. For the second advisory use 3.39.2 or later on the 3.x line, or 4.0.5 or later.
- If the server was exposed on an affected version, remove unknown custom nodes, then rebuild the machine and rotate every credential on it. See [rotating cloud credentials](../playbooks/rotating-cloud-credentials.md).

## Prevention

- Do not expose ComfyUI to the internet. Bind it to the local machine and use an authenticated tunnel.
- Treat custom nodes as code you are installing. See the [package vetting checklist](../prevention/package-vetting-checklist.md).

## Sources
- [ComfyUI-Manager security advisories tab](https://github.com/Comfy-Org/ComfyUI-Manager/security/advisories), read through the GitHub API on 2026-11-16: GHSA-95pq-hr8p-f5g7 and GHSA-562r-8445-54r2 with ranges, patched versions, scores and dates.
- [CVE Services: CVE-2025-67303](https://cveawg.mitre.org/api/cve/CVE-2025-67303), fetched 2026-11-16: MITRE, dated 2026-01-05, "n/a" product and version fields, CISA's 7.5, two references into the ComfyUI-Manager repository.
- [The Hacker News: over 1,000 exposed ComfyUI instances](https://thehackernews.com/2026/04/over-1000-exposed-comfyui-instances.html), fetched 2026-11-16: dated 2026-04-07, Censys as the researcher, the count as quoted, the four package names. It states no versions.
- [Cloud Security Alliance research note, 2026-04-08](https://labs.cloudsecurityalliance.org/research/csa-research-note-ai-workload-exposure-cryptomining-20260408/), fetched 2026-11-16: Censys ARC as the researcher, the link to CVE-2025-67303, the two fixed versions, the count.
- PyPI `comfyui-manager`, queried 2026-11-16: 36 releases, 4.0 to 4.4, with 4.0.5 dated 2026-01-08.
- Git tags `3.38`, `3.39.2` and `4.0.5` in the ComfyUI-Manager repository and ComfyUI `v0.3.76` (2025-12-02), read through the GitHub API on 2026-11-16.
- Not opened: Censys's own post. Not checked: the four named repositories.
