---
id: 2026-03-nvidia-bionemo-framework-deserialization-cve-2026-24164-24165-fixed-by-commit-v3-0-0
title: "NVIDIA BioNeMo Framework: two deserialization CVEs (CVE-2026-24164, 8.8) fixed by commit, first tagged in v3.0.0"
date_disclosed: 2026-03-31
last_updated: 2026-11-16
severity: high
status: patched
ecosystems: [nvidia, bionemo, python, ai-for-science, biology, ml-frameworks]
tools_affected: ["NVIDIA BioNeMo Framework checkouts that do not include commits f2c2b14 and e5e58c8", "BioNeMo Framework v2.7 and v2.7.1 (tags that do not contain the fix commits)", "any pipeline or agent that loads model or dataset files from others with the framework"]
tags: [cve, nvidia, bionemo, deserialization, pickle, ai-for-science, drug-discovery, fix-by-commit, backfill]
---

## TL;DR
NVIDIA's BioNeMo Framework, used for protein and molecule models, has two flaws in how it loads serialized data. CVE-2026-24164 is scored 8.8 and CVE-2026-24165 is scored 7.8, both by NVIDIA, and both can lead to code execution when a user loads crafted data. NVIDIA gives the fix as two commits, not a version. The first tagged release that contains both is v3.0.0 (2026-06-24). Use v3.0.0 or later, or a checkout of `main`, and load only model and dataset files from sources you trust.

## What happened

NVIDIA's bulletin 5808, "Security Bulletin: NVIDIA BioNeMo Framework - March 2026", is dated 2026-03-31.

| CVE | NVIDIA score | Vector | Affected | Fix |
|---|---|---|---|---|
| CVE-2026-24164 | 8.8 | `AV:N/AC:L/PR:N/UI:R/S:U/C:H/I:H/A:H` | all versions that do not include commit f2c2b14 | any branch that includes f2c2b14 |
| CVE-2026-24165 | 7.8 | `AV:L/AC:L/PR:N/UI:R/S:U/C:H/I:H/A:H` | all versions that do not include commit e5e58c8 | any branch that includes e5e58c8 |

Both are classed as deserialization of untrusted data (CWE-502). The bulletin's summary line says to update to commit e5e58c8 or later, while the CVE-2026-24164 row names f2c2b14. You need both.

**Mapping the commits to releases.** The repository `NVIDIA/bionemo-framework` now resolves to `NVIDIA-BioNeMo/bionemo-recipes`. Commit f2c2b14 is dated 2026-01-20 and e5e58c8 is dated 2026-01-22. The GitHub compare API shows both are in tag `v3.0.0` (published 2026-06-24) and are not in `v2.7` or `v2.7.1`. Between January and June no tagged release contained them, so a user who installed the newest release during that time was unpatched for five months after the commits landed.

A scanner cannot match on these records. The affected field is a sentence about a commit, not a version range.

## Am I affected?

```bash
git -C /path/to/bionemo merge-base --is-ancestor f2c2b14 HEAD && echo "has f2c2b14"
git -C /path/to/bionemo merge-base --is-ancestor e5e58c8 HEAD && echo "has e5e58c8"
```

- A source checkout is affected unless both lines print.
- Tags v2.7 and v2.7.1 do not contain these two commits. Not checked: whether a backport exists under another commit.
- Containers and downstream packages that bundle the framework were not checked for this file.

## If you are affected

- Move to v3.0.0 or later, or to a checkout that contains both commits.
- If an affected install loaded checkpoints or datasets from an untrusted source, treat the machine as you would after running untrusted code. See [if your local AI agent was exploited](../playbooks/if-your-local-ai-agent-was-exploited.md).
- None of the sources below reports exploitation.

## Prevention

- Treat a model checkpoint or a pickled dataset as code. Load only files you produced or that come from a source you trust.
- Run training and inference jobs for downloaded models with no credentials in the environment. See [agent sandboxing](../prevention/agent-sandboxing.md) and [credential hygiene](../prevention/credential-hygiene.md).

## Sources
- [NVIDIA product-security mirror, bulletin 5808](https://github.com/NVIDIA/product-security/tree/main/2026/5808), read through the GitHub API on 2026-11-16: title, date, both CVE rows, the summary line, credits to Thomas Keefer, Dan Aridor and CheN.
- [CVE Services: CVE-2026-24164](https://cveawg.mitre.org/api/cve/CVE-2026-24164), fetched 2026-11-16: NVIDIA CNA, published 2026-03-31, the affected sentence, 8.8 and the vector.
- Repository `NVIDIA-BioNeMo/bionemo-recipes`, read through the GitHub API on 2026-11-16: the two commit dates, the compare results against `v3.0.0`, `v2.7.1` and `v2.7`, and the release date of `v3.0.0`.
- Not opened: NVIDIA's support-site page for the bulletin, which blocks fetches, and the CVE record for CVE-2026-24165.
