---
id: 2026-10-nvidia-isaac-lab-eval-injection-cve-2026-65141-fixed-3-0
title: "NVIDIA Isaac Lab 2.3.2 and earlier: untrusted input reaches dynamic code evaluation (CVE-2026-65141), fixed in 3.0.0"
date_disclosed: 2026-10-13
last_updated: 2026-11-16
severity: high
status: patched
ecosystems: [nvidia, isaac-lab, isaac-sim, pypi, python, robotics, simulation]
tools_affected: ["NVIDIA Isaac Lab 0.0 through 2.3.2", "isaaclab on PyPI before 3.0.0", "robot-learning projects and agents that load task configurations or assets from others"]
tags: [cve, nvidia, isaac-lab, isaac-sim, eval-injection, robotics, simulation, physics-simulation, backfill]
---

## TL;DR
NVIDIA Isaac Lab, the robot-learning framework built on Isaac Sim, evaluates untrusted input as code in versions 0.0 through 2.3.2 (CVE-2026-65141, CVSS 7.8, scored by NVIDIA). A user has to load crafted input, and the result is code execution as that user. Upgrade to 3.0.0, which reached PyPI on 2026-10-19, six days after the bulletin. Until then the fix existed only in beta tags.

## What happened

NVIDIA's bulletin 5902, "Security Bulletin: NVIDIA Isaac Lab - October 2026", is dated 2026-10-13 and holds this one CVE. It classes the flaw as eval injection (CWE-95), with the vector `AV:L/AC:L/PR:N/UI:R/S:U/C:H/I:H/A:H`. The bulletin and the CVE record give the same affected range, 0.0 through 2.3.2. Neither describes which input reaches the evaluation.

**Fixed version.** The bulletin's table says "3.0-beta2" and its text says to install the latest version. The CVE record names no fixed version.

| Release | Date | On PyPI as `isaaclab` |
|---|---|---|
| v2.3.2, last affected | 2026-02-02 | yes |
| v3.0.0-beta2, the bulletin's fix | 2026-06-17 | no beta version was listed |
| v3.0.0-beta2.patch1 | 2026-07-02 | no beta version was listed |
| v3.0.0 | 2026-10-20 on GitHub, 2026-10-19 on PyPI | yes |

On the day of the bulletin, the newest version `pip` would install was 2.3.2.post1, a repackaging of the last affected release. This file did not check that the `v3.0.0-beta2` tag contains the fix. The bulletin is the source for that.

## Am I affected?

```bash
pip show isaaclab 2>/dev/null | grep -E '^(Name|Version)'
```

- Affected: 2.3.2 and earlier. The bulletin does not mention `2.3.2.post1`. Treat it as affected, because it was uploaded eight months before the bulletin.
- A source checkout is affected unless it is at `v3.0.0-beta2` or later.

## If you are affected

- Upgrade to 3.0.0. Version 3 is a major release, so check your tasks and extensions against it.
- If an affected install loaded task files, configurations or assets from an untrusted source, treat the machine as you would after running untrusted code. See [if your local AI agent was exploited](../playbooks/if-your-local-ai-agent-was-exploited.md).
- None of the sources below reports exploitation.

## Prevention

- Load simulation tasks, configurations and assets only from sources you trust.
- Run simulation and training jobs with no cloud credentials in the environment. See [agent sandboxing](../prevention/agent-sandboxing.md).

## Sources
- [NVIDIA product-security mirror, bulletin 5902](https://github.com/NVIDIA/product-security/tree/main/2026/5902), read through the GitHub API on 2026-11-16: title, date, the one CVE, the range, "3.0-beta2", credit to Renan Malafatti.
- [CVE Services: CVE-2026-65141](https://cveawg.mitre.org/api/cve/CVE-2026-65141), fetched 2026-11-16: NVIDIA CNA, published 2026-10-13, product Isaac Lab, version "0.0-2.3.2", 7.8 and the vector, no fixed version.
- Isaac Lab releases (`isaac-sim/IsaacLab`), read through the GitHub API on 2026-11-16: the tags and dates above.
- PyPI `isaaclab`, queried 2026-11-16: 2.3.2 on 2026-02-02, 2.3.2.post1 on 2026-02-11, 3.0.0 on 2026-10-19, no pre-release versions listed.
- Not checked: the contents of the `v3.0.0-beta2` tag.
