---
id: 2026-10-openusd-crate-file-double-free-cve-2026-92211-usdview-usdedit-os-system-fixed-26-11
title: "OpenUSD before 26.11: a crafted USDC or USDZ file can run code (CVE-2026-92211), and usdview and usdedit pass file text or names to os.system"
date_disclosed: 2026-10-26
last_updated: 2026-11-16
severity: high
status: patched
ecosystems: [pypi, python, openusd, usd-core, 3d-modeling, digital-twins, file-parsing]
tools_affected: ["OpenUSD 26.08 and earlier (Pixar's advisory range)", "usd-core on PyPI before 26.11", "usdview and usdedit in OpenUSD 26.08 and earlier", "any pipeline, digital-twin tool or coding agent that opens a .usdc or .usdz file it did not create"]
tags: [cve, openusd, usd-core, pixar, zdi, double-free, file-parsing, digital-twins, omniverse, agent-opened-file, scanner-gap, backfill]
---

## TL;DR
OpenUSD 26.08 and earlier has a double free in the code that reads binary USD files (`.usdc`, and `.usdz` packages that hold them). A crafted file can run code in the process that opens it (CVE-2026-92211, CVSS 7.8, found by Trend Micro's Zero Day Initiative). Pixar's advisory says it is fixed in 26.11. On PyPI that is `usd-core` 26.11, uploaded 2026-10-21. Two more Pixar advisories dated 2026-10-30, with no CVE, cover `usdview` and `usdedit` passing text from a file or a file name to `os.system`. Upgrade `usd-core` to 26.11 and open only USD files you created or trust. A scanner that reads the GitHub Advisory Database will not flag an old `usd-core`, because that database had no row for this CVE on 2026-11-16. Check Pixar's repository advisory tab instead.

## What happened

**CVE-2026-92211.** ZDI's advisory ZDI-26-791 says the flaw is in the parsing of USDC and USDZ files and results from not checking that an object exists before freeing it. The vector is local with user interaction (`AV:L/AC:L/PR:N/UI:R/S:U/C:H/I:H/A:H`). ZDI's timeline: reported to Pixar on 2026-04-15, coordinated public release on 2026-10-26. The CVE record was published by ZDI on 2026-11-03.

**Three statements of the affected range. They do not agree.**

| Source | Versions named | Fixed |
|---|---|---|
| CVE record (ZDI CNA) | `v26.03` only | not stated; references commit 7c62a43 |
| Pixar advisory GHSA-75r4-2rhh-hrxw (repository tab, 2026-10-30) | `<= 26.08` | `>= 26.11` |
| ZDI report quoted in Pixar's advisory | tested on `usd-core` 26.3, OpenUSD 26.03 and a 26.05 pre-release | |

Use Pixar's range. PyPI writes the releases as 26.3, 26.5 and 26.8, and Pixar writes 26.03, 26.05 and 26.08. They are the same releases. The fix commit, "sdf: Fix crate file loading code to reject obsolete versions early", is dated 2026-09-28, after the 26.05 and 26.08 releases. PyPI shows `usd-core` 26.5 uploaded 2026-04-24, 26.8 on 2026-07-20 and 26.11 on 2026-10-21. A scanner that reads only the CVE record's `v26.03` would call 26.5 and 26.8 clean. Pixar's advisory says they are affected.

**Two more advisories, 2026-10-30, High, no CVE.**

- GHSA-qgc5-vc49-x7jw: two `usdview` context menu items call `os.system` on identifiers taken from an opened layer's content. Pixar's text says a command embedded in the identifier may run when the user selects the menu item.
- GHSA-5hf7-7jmm-gqcf: `usdedit` puts the file name the user supplies into `os.system` calls.

Both list affected `<= 26.08` and patched `>= 26.11`, fixed by commit 05f0191.

**Version labels.** PyPI's newest `usd-core` is 26.11. The newest GitHub release is tagged `v26.11.1`, published 2026-10-21. Both are inside Pixar's patched range of 26.11 and later.

**Earlier rows.** The GitHub Advisory Database lists two older `usd-core` advisories: GHSA-58p5-r2f6-g2cj (fixed 25.8) and GHSA-grjp-54v3-c442 (fixed 25.11). Pixar's repository tab held 13 published advisories on 2026-11-16.

**Why this matters for agent users.** OpenUSD is the scene format under NVIDIA Omniverse and most digital-twin pipelines. An agent told to convert, inspect or import a `.usdz` it downloaded opens the file for you, so "local, user interaction required" describes an ordinary agent task.

## Am I affected?

```bash
pip show usd-core 2>/dev/null | grep -E '^(Name|Version)'
```

- Affected by CVE-2026-92211: `usd-core` before 26.11, and source builds of OpenUSD 26.08 and earlier.
- The `usdview` and `usdedit` advisories apply to source and full builds only. Pixar's `usdedit` advisory says `usd-core` is unaffected because it does not include the tools.
- Applications that bundle their own OpenUSD (DCC tools, viewers, converters) carry the bundled version, not the one `pip` shows. Not checked: any application that bundles OpenUSD. Read that vendor's release notes.
- You are exposed when the process opens a `.usdc` or `.usdz` file from someone else. The advisory names only `.usdc` and `.usdz`. It does not say whether `.usda` files are safe, and the `usdview` and `usdedit` bugs do not depend on the file type.

## If you are affected

- Upgrade `usd-core` to 26.11, or build OpenUSD 26.11 or later.
- Do not run `usdview` or `usdedit` from 26.08 or earlier on files or file names from someone else.
- If an affected build opened USD files from an untrusted source, treat the machine as you would after running untrusted code. See [if your local AI agent was exploited](../playbooks/if-your-local-ai-agent-was-exploited.md).
- None of the sources below reports exploitation in the wild.

## Prevention

- Pin `usd-core` with hashes and check it against Pixar's repository advisory tab, because the advisory database row can be missing. See the [package vetting checklist](../prevention/package-vetting-checklist.md).
- Treat scene and asset files as untrusted input: `.usd`, `.usdc`, `.usdz`, `.blend`, glTF with external references.
- Run converters and agent-driven asset imports in a directory and environment with no credentials. See [agent sandboxing](../prevention/agent-sandboxing.md).

## Sources
- [ZDI-26-791](https://www.zerodayinitiative.com/advisories/ZDI-26-791/), fetched 2026-11-16: CVE-2026-92211, 7.8 and the vector, USDC and USDZ parsing, the two timeline dates, credit Brandon Evans, link to commit 7c62a43.
- [CVE Services: CVE-2026-92211](https://cveawg.mitre.org/api/cve/CVE-2026-92211), fetched 2026-11-16: ZDI CNA, published 2026-11-03, affected `v26.03`, CVSS 3.0 7.8, two references.
- Pixar repository advisory GHSA-75r4-2rhh-hrxw, read through the GitHub API (`repos/PixarAnimationStudios/OpenUSD/security-advisories`) on 2026-11-16: published 2026-10-30, CVE-2026-92211, High 7.8, affected `<= 26.08`, patched `>= 26.11`, the versions ZDI tested. The advisory body links a proof-of-concept file, which this file does not link.
- Pixar repository advisories GHSA-qgc5-vc49-x7jw and GHSA-5hf7-7jmm-gqcf, same API call, 2026-11-16: published 2026-10-30, High, no CVE, the `os.system` descriptions, commit 05f0191, "fix available in USD 26.11 and onwards".
- [OpenUSD commit 7c62a43](https://github.com/PixarAnimationStudios/OpenUSD/commit/7c62a43d8823dd4e1ef8c49fc1d72729e1ce6e36), read through the GitHub API on 2026-11-16: dated 2026-09-28, the commit message, `pxr/usd/sdf/crateFile.cpp` and a malformed-file test.
- [OpenUSD security advisories tab](https://github.com/PixarAnimationStudios/OpenUSD/security/advisories), the page the API call above reads: 13 published advisories on 2026-11-16.
- PyPI `usd-core`, queried 2026-11-16: 26.3 on 2026-02-24, 26.5 on 2026-04-24, 26.8 on 2026-07-20, 26.11 on 2026-10-21.
- GitHub Advisory Database, queried 2026-11-16 through the API: no row for CVE-2026-92211; two rows for `usd-core` (GHSA-58p5-r2f6-g2cj, GHSA-grjp-54v3-c442).
- GitHub compare API, 2026-11-16: commit 7c62a43 is an ancestor of tag `v26.11.1`.
- Not checked: the contents of the `usd-core` 26.11 wheel (Pixar's advisory is the source for "patched in 26.11"), and any application that bundles OpenUSD.
