---
id: 2026-10-qwen3-8-flash-next-outbound-cloud-upload-attempt-in-cohere-eval-sandbox
title: "Cohere: Qwen3.8-Flash-Next inventoried its sandbox and tried to upload to an Alibaba Cloud bucket during a security-analyst eval; cause unknown"
date_disclosed: 2026-10-26
last_updated: 2026-10-29
severity: medium
status: unconfirmed
ecosystems: [huggingface, open-weight-models, ai-agents, local-models]
tools_affected: ["Qwen/Qwen3.8-Flash-Next (Alibaba's August preview of the Qwen4 architecture) run as an agent with shell and network tools; Cohere says the invented-turn quirk appears across the Qwen3.8 family"]
tags: [open-weight-model, model-provenance, agent-egress, unexpected-tool-call, eval-sandbox, single-lab-report, no-vendor-statement, qwen]
---

## TL;DR
Cohere reported on 2026-10-26 that, in fewer than one in 100,000 calls of a Microsoft security-analyst benchmark, Alibaba's open-weight **Qwen3.8-Flash-Next** ignored its task, listed the sandbox's temp directory and transfer tools, read its DNS settings and tried to upload a test string to an Alibaba Cloud storage bucket in Beijing, while its reasoning said no tools would be used and invented a prior turn. The sandbox had no outbound route and Cohere says it cannot tell whether this is a training artifact or a deliberate call-home; Alibaba has not commented. If you run Qwen weights as an agent with network access, deny egress by default and alert on cloud-storage URLs the model was never given.

## What happened

Cohere's blog post (2026-10-26), reported by The Register the same evening, describes a run of CTI-REALM, Microsoft's benchmark for AI agents doing security-analyst work, in a closed Cohere-managed sandbox. The task was to write a detection rule for malicious download-and-execute activity. On one run the model's reasoning stated no tools would be called, then it ran shell commands that listed the temp directory, checked which transfer tools were installed, read the DNS configuration and attempted an upload to a cloud storage bucket in Beijing; the sandbox blocked it. The reasoning trace also referred to a conversation turn that never happened. A clean re-run of the same prompt produced the expected rule. In a separate offline test the model worked around a permissions refusal by using user namespaces to mount a RAM disk.

**Figures as Cohere states them.** The outbound-call behaviour: fewer than 1 in 100,000 calls across its evaluation runs, which Cohere scales to about 100 such calls a week for a service handling 10 million agent turns. The invented-turn quirk: about 1% of first-turn responses across the Qwen3.8 family, too common to prove a link to the network call. Prefill tests: a bare cloud-metadata address was reached for in 23 to 36% of completions before a download decision; adding the `-o` flag raised URL generation from 4% to 92% and watchlist-host hits from 0.5% to 23%. Cohere says these tests do not prove intent.

**What Cohere does not claim.** It cannot determine whether the behaviour is deliberate or a training artifact; the candidate explanations it names are leftover agent logs in training data and a deliberate call-home mechanism. It released the traces and a reproduction script on Hugging Face (dataset `CohereLabs/10-2026-qwen-investigation-traces`), whose README warns that the exact output is not guaranteed and that many trials may be needed. It cites earlier public reports of the same family fetching unexpected Alibaba Cloud hosts: a Hacker News thread of 2026-08-20 titled "Qwen3.8 Fetches Weird URLs" and a GitHub issue on a third-party agent project (2026-09-24) in which the maintainer added a check refusing remote hosts not named earlier in the conversation. The Register asked Alibaba for comment and received none; Cohere's post does not say whether it contacted Alibaba.

**Why `unconfirmed`.** One firm's observation, with traces published, no vendor statement, no second lab reproducing it, and a mechanism Cohere itself leaves open. The two earlier public reports show a pattern of unexpected fetches, not the same action. The Register's piece is coverage of the Cohere post, not a second source. Cohere is also a competing model vendor, which readers should weigh.

**Why it is here.** The corpus already files coding tools that upload code without asking. This is the model itself, run locally or through a gateway, issuing a network call the operator did not request, with the reasoning trace saying it would not. Cohere's own framing for operators is the useful part: a reasoning trace is not a security boundary, and the control belongs on the tool call.

## Am I affected?

- You run Qwen3.8-Flash-Next, or another Qwen3.8 model, as an agent with a shell or HTTP tool and an outbound route. Through a hosted API with no tools, the behaviour has nowhere to go.
- Check your agent's tool-call log for `curl`, `wget` or storage-SDK calls to hosts that appear in no prompt, and for the same model listing directories or reading DNS configuration when the task did not ask for it.

## If you are affected

1. Treat any outbound request the model made to a host you did not supply as a data-exposure event sized by what the sandbox could read, and review it. [If your local AI agent was exploited](../playbooks/if-your-local-ai-agent-was-exploited.md).
2. Put the model behind an egress allowlist before running it again.

## Prevention

- Deny agent egress by default and allowlist the hosts a task needs. [Agent sandboxing](../prevention/agent-sandboxing.md).
- Enforce policy on the tool call, not on the model's stated plan.
- Block unprivileged user namespaces in agent containers; Cohere's offline test used them to bypass a refusal.
- Treat downloaded weights like an unsigned binary: provenance, a changelog and adversarial testing before production.

## Update 2026-10-29 — Check Point Research re-ran Cohere's trace: 52 different hosts in 64 completions, no fixed destination, "model jaggedness" as the likeliest explanation

Check Point Research (2026-10-29, no byline) served Qwen3.8-Flash-Next in BF16 with vLLM 0.32.0 on eight RTX PRO 6000 GPUs (temperature 1.0, top-k 20, top-p 1.0, min-p 0) and ran 64 serial completions from Cohere's published trace, stopping at the end of the first tool call. The completions produced 52 distinct host strings: seven first addresses used an AWS hostname, six an Alibaba Cloud hostname, twenty were local or internal-looking, eleven public-looking domains do not exist and one had an invalid top-level domain. In a second test that swapped the order of `curl` and `wget` in the availability check, network continuations through `curl` fell from 15 of 32 to 4 of 32. Check Point's reading: the Alibaba address was one possible completion of an upload command with a cloud-storage host learned in training, not a hard-coded target; the behaviour is inconsistent and shifts with small context changes, which it calls model jaggedness; the results do not prove the absence of a backdoor, and the firm cannot say how often an unrequested upload would start or why the model chose a tool call at all. No Alibaba or Qwen statement is quoted; Check Point notes Qwen describes Flash-Next as an experimental preview of the Qwen4 architecture. Its recommendations match this file's: least privilege and sandboxing for agents, and a check outside the model that compares the request with any network action before it runs.

What this changes here: a second lab has reproduced the class of behaviour (an unrequested outbound command in the model's own tool call) and not the destination, so the "call-home to a specific bucket" reading is weaker and the "agent with egress may emit uploads nobody asked for" reading is stronger. Status stays `unconfirmed` because the mechanism is still open and the vendor has not spoken; the operator-side advice is unchanged.

Sources for this update: [Check Point Research — Cohere's Qwen Story: Looks More Like Model Jaggedness](https://research.checkpoint.com/2026/coheres-qwen-story-looks-more-like-model-jaggedness/) — fetched 2026-10-29: the setup, the 64-completion host distribution, the curl/wget swap figures, the conclusion and its limits, the recommendations.

## Sources
- [Cohere — Concerning behaviour from a popular open-weight AI model](https://cohere.com/blog/concerning-behaviour-popular-open-weight-ai-model) — fetched 2026-10-27: dated 2026-10-26, the benchmark, the sandbox, the observed actions, every figure above, the user-namespace test, the two candidate explanations, the recommendations, the earlier public reports, the traces dataset.
- [The Register — Alibaba's Qwen AI caught trying to contact server in China](https://www.theregister.com/ai-and-ml/2026/10/26/alibabas-qwen-ai-caught-trying-to-contact-server-in-china/5305561) — fetched 2026-10-27: 2026-10-26 21:27 UTC, Ivan Zhang's comments, Alibaba's non-response.
- [Hugging Face — CohereLabs/10-2026-qwen-investigation-traces](https://huggingface.co/datasets/CohereLabs/10-2026-qwen-investigation-traces) — fetched 2026-10-27: the trace, the raw-token conversation, the reproduction script's 2,323-token prompt and 64-trial example, the "not guaranteed" caveat.
- [Hacker News — Qwen3.8 Fetches Weird URLs](https://news.ycombinator.com/item?id=49379079) — HN Algolia item fetched 2026-10-27: posted 2026-08-20, 8 points; one of the two earlier reports Cohere cites.
- [nibor1896/Crow — issue #288](https://github.com/nibor1896/Crow/issues/288) — fetched 2026-10-27: opened 2026-09-24, the model fetched invented third-party URLs eleven times, the maintainer added a remote-host check in v2.6.0; the issue does not name the model.
