---
id: 2026-11-arize-phoenix-cve-2026-53998-unauthenticated-format-string-secret-read-fixed-15-7-0
title: "Arize Phoenix 13.0.0 to before 15.7.0: unauthenticated read of server environment and PHOENIX_SECRET (CVE-2026-53998, CVSS 10.0); fixed in 15.7.0"
date_disclosed: 2026-11-09
last_updated: 2026-11-18
severity: critical
status: patched
ecosystems: [pypi, llm-observability, self-hosted]
tools_affected: ["arize-phoenix (PyPI) 13.0.0 to before 15.7.0", "self-hosted Phoenix servers that store LLM provider keys"]
tags: [cve, llm-observability, information-disclosure, format-string, unauthenticated, secret-exposure, silent-window]
---

## TL;DR
[Arize Phoenix](https://github.com/Arize-ai/phoenix/security/advisories/GHSA-gfv3-m769-5xm3) versions 13.0.0 to before 15.7.0 let anyone who can reach the server read its environment variables through the `applyChatTemplate` GraphQL query. The endpoint needs no login on a default install. The environment includes `PHOENIX_SECRET`, which signs session tokens and protects stored provider keys. Upgrade to 15.7.0 or later, then change `PHOENIX_SECRET` and every key the server held. The fix reached PyPI on 2026-05-13, six months before the CVE record of 2026-11-16.

## What happened

The [CNA record](https://cveawg.mitre.org/api/cve/CVE-2026-53998), published by GitHub on 2026-11-16, says the `applyChatTemplate` query passed an attacker-controlled F-string template to the server's formatter. A crafted field could walk Python object internals and return process environment variables and module state.

The record says: "The endpoint is unauthenticated on default installations, and any account can reach it when authentication is enabled." It adds that exposure of `PHOENIX_SECRET` "can allow administrative session-token forgery and decryption of credentials protected by keys derived from that secret."

The vendor advisory text, read through [OSV](https://api.osv.dev/v1/vulns/GHSA-gfv3-m769-5xm3), says the secret protects stored "LLM API keys, OAuth tokens". It includes a proof of concept. This file does not reproduce it.

## Dates and versions

| Fact | Value | Source |
|---|---|---|
| Vendor advisory published | 2026-11-09 | vendor page, read 2026-11-18 |
| CNA record published | 2026-11-16 | CVE Services |
| Advisory database row | 2026-11-17 | OSV `published` |
| Score | 10.0, `CVSS:3.1/AV:N/AC:L/PR:N/UI:N/S:C/C:H/I:H/A:L` | vendor page and CNA record (GitHub), read 2026-11-18 |
| Affected | `>= 13.0.0, < 15.7.0` | CNA record. The vendor page prints `>= 13.0.0` and patched `v15.7.0` |
| First 13.x release on PyPI | 13.0.2, 2026-02-13 | PyPI. No 13.0.0 is listed |
| Fixed release on PyPI | 15.7.0, 2026-05-13 | PyPI |
| Newest release on PyPI | 21.0.0, 2026-10-30 | PyPI, read 2026-11-18 |

The advisory text names 14.8.0 as the "latest confirmed vulnerable release". The CNA range runs to 15.7.0. Treat every release from 13.0.0 up to 15.7.0 as affected.

Scanners keyed on CVE ids began to flag this on 2026-11-16 or 11-17. A server that ran an affected version between February and its upgrade was exposed for that whole period with no advisory.

## Am I affected?

```bash
pip show arize-phoenix 2>/dev/null | grep -i '^version'
pip freeze 2>/dev/null | grep -i '^arize-phoenix'
grep -rnE 'arize-phoenix' requirements*.txt pyproject.toml uv.lock poetry.lock 2>/dev/null
```

A version from 13.0.0 up to, but not including, 15.7.0 is affected. For a container deployment, check the image tag against the same range.

Exposure depends on who can reach the server. A Phoenix server on the public internet, or on a shared network, with an affected version should be treated as read.

## If you are affected

- Upgrade to 15.7.0 or later. The newest release when read was 21.0.0.
- Set a new `PHOENIX_SECRET`. The old value lets a holder forge administrator sessions after the upgrade.
- Rotate every LLM provider key and OAuth token stored in Phoenix, and every secret in the server's environment.
- Review provider usage for the period the affected version ran.
- See [rotating cloud credentials](../playbooks/rotating-cloud-credentials.md).

## Prevention

- Do not expose an observability server to the internet. Put it behind a private network or an authenticating proxy.
- Turn authentication on. The default install has none.
- Keep provider keys out of the process environment of tools that do not need them. See [credential hygiene](../prevention/credential-hygiene.md).

## Sources

- [Arize-ai/phoenix GHSA-gfv3-m769-5xm3](https://github.com/Arize-ai/phoenix/security/advisories/GHSA-gfv3-m769-5xm3): vendor advisory, published 2026-11-09, read 2026-11-18. Reporter credited as OmarXtream.
- [CVE-2026-53998 CNA record](https://cveawg.mitre.org/api/cve/CVE-2026-53998): GitHub CNA, 2026-11-16.
- [OSV copy of the advisory](https://api.osv.dev/v1/vulns/GHSA-gfv3-m769-5xm3): full text and the PyPI range.
- [arize-phoenix on PyPI](https://pypi.org/project/arize-phoenix/): release dates, read 2026-11-18.
- Not opened: the fix pull request and commit that the record references.
