---
id: 2026-11-browser-use-allowed-domains-bypass-cve-2026-136452-cve-2026-136453-engine-replaced-1-0-0
title: "browser-use below 1.0.0: crafted URLs get past allowed_domains and IP blocking (CVE-2026-136452, CVE-2026-136453); 1.0.0 replaces the engine"
date_disclosed: 2026-11-24
last_updated: 2026-11-25
severity: high
status: patched
ecosystems: [pypi, browser-use, ai-agents, browser-agents]
tools_affected: ["`browser-use` (PyPI) below 1.0.0 with `allowed_domains`, `prohibited_domains` or `block_ip_addresses` set"]
tags: [cve, vulncheck, browser-agent, allowlist-bypass, ssrf, url-parsing, prompt-injection, data-exfiltration, patched]
---

## TL;DR

VulnCheck published two records on 2026-11-24 for `browser-use` below 1.0.0. A crafted URL in an LLM-controlled navigation reaches a host outside `allowed_domains` ([CVE-2026-136453](https://cveawg.mitre.org/api/cve/CVE-2026-136453)), or loopback, private or other external hosts ([CVE-2026-136452](https://cveawg.mitre.org/api/cve/CVE-2026-136452)). Secrets placed in the URL go with the request. Upgrade to 1.0.0 or later, which PyPI has carried since 2026-11-10.

## What happened

| CVE | CNA score (4.0 / 3.1) | What the record says |
|---|---|---|
| CVE-2026-136453 | 7.1 / 6.5 | `SecurityWatchdog` compares the raw URL string with `startswith()`. A URL with the allowed domain in the userinfo part or as a prefix of an attacker domain passes the check. |
| CVE-2026-136452 | 5.3 / 6.1 | A backslash before the allowed host makes Python's `urllib.parse` and Chromium read different hostnames. The checks for `allowed_domains`, `prohibited_domains` and `block_ip_addresses` pass and the browser requests another host. |

Both records say the attacker influences "an LLM-controlled" navigation, and CVE-2026-136452 names prompt injection as the route. Both list `browser-use` below 1.0.0 as affected.

The records reference one pull request, [browser-use #6314](https://github.com/browser-use/browser-use/pull/6314), "browser-use 1.0: REPL engine replaces the 0.x engine (first version)". It merged on 2026-11-09. Its description does not name these bugs. It says the 0.x code was deleted, "old agent, DOM service, watchdogs, tools registry, old providers", and that an "attach-mode domain sweep covers tabs used within one cell". No vendor text says the 1.x engine was tested against these URLs.

There is no vendor advisory for either id. The [vendor tab](https://github.com/browser-use/browser-use/security/advisories) showed one advisory on 2026-11-25, GHSA-x39x-9qw5-ghrf from 2025-05-04, an earlier bypass of `allowed_domains` through the username part of a URL.

PyPI shows 1.0.0 uploaded 2026-11-10 and 1.0.8 as the newest release on 2026-11-22.

## Am I affected?

```bash
pip show browser-use | grep -i '^version'
grep -rn "allowed_domains\|prohibited_domains\|block_ip_addresses" --include=*.py . | head
```

- Below 1.0.0 and the agent opens pages or reads content an outsider can write: affected.
- You are most exposed if you rely on `allowed_domains` to keep credentials or session data on named sites.

## If you are affected

1. Upgrade to 1.0.0 or later. The release replaces the 0.x engine, so test your scripts before deploying.
2. If you cannot upgrade, enforce the allowlist outside the library with an egress proxy or firewall on the browser's host.
3. If the agent handled secrets while browsing untrusted pages on an affected version, rotate them. See [if your local AI agent was exploited](../playbooks/if-your-local-ai-agent-was-exploited.md).

## Prevention

- Treat a library allowlist as one layer. Block loopback, private ranges and cloud metadata at the network. See [agent sandboxing](../prevention/agent-sandboxing.md).
- Keep secrets out of URLs the agent builds.

## Sources

One CNA, no vendor advisory.

- [CVE-2026-136453](https://cveawg.mitre.org/api/cve/CVE-2026-136453) and [CVE-2026-136452](https://cveawg.mitre.org/api/cve/CVE-2026-136452), CNA VulnCheck, published 2026-11-24. Descriptions, scores, range, references.
- [browser-use pull request #6314](https://github.com/browser-use/browser-use/pull/6314), merged 2026-11-09, read 2026-11-25 through a summarizing fetch. Title, state and the quoted description lines.
- [browser-use advisory tab](https://github.com/browser-use/browser-use/security/advisories), read 2026-11-25. One advisory, from 2025.
- PyPI simple API for `browser-use`, read 2026-11-25. Upload dates.
- Not opened: the VulnCheck advisory pages and the commit the records reference.
