---
id: 2026-11-mcp-agent-cve-records-november-27-bagel-crypto-apis-whodb-pydantic-deep-siyuan
title: "MCP and agent CVE records 2026-11-26 to 11-27: Bagel, Crypto APIs MCP servers, bigcommerce-api-mcp, WhoDB, Pydantic Deep, SiYuan and four more"
date_disclosed: 2026-11-27
last_updated: 2026-11-28
severity: high
status: patched
ecosystems: [mcp, pypi, npm, docker, desktop]
tools_affected: ["bagel-mcp below 2.5.5", "@cryptoapis-io/mcp-* below 0.4.0, 0.5.0 or 0.2.0 depending on the package", "bigcommerce-api-mcp 1.0.0", "WhoDB 0.88.0 to below 0.132.0", "mcp-video-analyzer 0.2.0 to below 0.10.1", "pydantic-deep 0.2.18 to below 0.4.0", "SiYuan 3.7.0 to below 3.8.11", "Typebot 2.14.0 to below 3.19.0", "Wazuh-MCP-Server before commit 2bbfe12", "@sylphx/pdf-reader-mcp 2.4.1 to below 3.0.15, 3.0.16, and 3.1.2 to below 3.2.0"]
tags: [cve-batch, mcp, missing-authentication, ssrf, prompt-injection, sql-execution, argument-injection, xss, vulncheck]
---

## TL;DR

VulnCheck published eleven CVE records for ten MCP servers and agent apps on 2026-11-26 and 2026-11-27. The fixes read on PyPI, npm and Docker Hub were uploaded between 2026-07-23 and 2026-11-26. [CVE-2026-138028](https://cveawg.mitre.org/api/cve/CVE-2026-138028) says injected text can make Bagel's MCP server run commands, fixed in `bagel-mcp` 2.5.5. Three records cover servers that answered tool calls with no authentication when exposed over HTTP. Upgrade each package to the version in the table, or to the fix commit for Wazuh-MCP-Server.

## What happened

| Product, package | Id | Score, provider | Affected | Fix, registry date |
|---|---|---|---|---|
| Bagel, PyPI `bagel-mcp` | CVE-2026-138027 | 7.7 CVSS 4.0 and 7.5 CVSS 3.1, VulnCheck | before 2.5.5 | 2.5.5, PyPI 2026-11-15 |
| Bagel, PyPI `bagel-mcp` | CVE-2026-138028 | 7.7 CVSS 4.0 and 7.5 CVSS 3.1, VulnCheck | before 2.5.5 | 2.5.5, PyPI 2026-11-15 |
| bigcommerce-api-mcp | CVE-2026-138034 | 8.7 CVSS 4.0 and 7.5 CVSS 3.1, VulnCheck | 1.0.0 | 1.0.1 per the vendor advisory. Not an npm package. |
| Pydantic Deep, PyPI `pydantic-deep` | CVE-2026-137953 | 8.8 CVSS 4.0 and 8.6 CVSS 3.1, VulnCheck. Vendor page 7.5. | 0.2.18 to before 0.4.0 | 0.4.0, PyPI 2026-11-26 |
| SiYuan | CVE-2026-137469 | 7.7 CVSS 4.0 and 7.5 CVSS 3.1, VulnCheck | 3.7.0 to before 3.8.11 | 3.8.11 per the vendor advisory |
| Typebot | CVE-2026-138031 | 7.6 CVSS 4.0 and 6.8 CVSS 3.1, VulnCheck | 2.14.0 to before 3.19.0 | 3.19.0, Docker Hub tag 2026-09-14 |
| mcp-video-analyzer, npm | CVE-2026-138033 | 7.0 CVSS 4.0 and 6.1 CVSS 3.1, VulnCheck | 0.2.0 to before 0.10.1 | 0.10.1, npm 2026-09-05 |
| Crypto APIs MCP servers, npm `@cryptoapis-io/mcp-*` | CVE-2026-138026 | 6.9 CVSS 4.0 and 7.3 CVSS 3.1, VulnCheck | 14 packages, see below | 0.4.0, 0.5.0 or 0.2.0, npm 2026-09-24 |
| WhoDB, npm `whodb` and `@clidey/whodb-cli` | CVE-2026-138032 | 6.0 CVSS 4.0 and 5.3 CVSS 3.1, VulnCheck | 0.88.0 to before 0.132.0 | 0.132.0, npm 2026-09-29 |
| Wazuh-MCP-Server | CVE-2026-138029 | 5.3 CVSS 4.0 and 4.7 CVSS 3.1, VulnCheck | before commit 2bbfe12 | the commit. The record names no release. |
| pdf-reader-mcp, npm `@sylphx/pdf-reader-mcp` | CVE-2026-138030 | 2.3 CVSS 4.0 and 3.4 CVSS 3.1, VulnCheck | 2.4.1 to before 3.0.15, 3.0.16, 3.1.2 to before 3.2.0 | 3.2.0, npm 2026-07-23 |

All scores were read from the CVE records on 2026-11-28. Vendor pages were opened for Bagel, bigcommerce-api-mcp, Pydantic Deep and SiYuan. The other six products are described from their CVE records only.

### Bagel

Bagel is an MCP server for robotics logs. [CVE-2026-138027](https://cveawg.mitre.org/api/cve/CVE-2026-138027) says its `query_messages` tool, annotated read-only, runs DuckDB SQL with no sandbox. The record says an attacker who injects text into recorded logs or topics can read and write files and make server-side requests. [CVE-2026-138028](https://cveawg.mitre.org/api/cve/CVE-2026-138028) says the `run_pipeline` tool passes rsync options that run commands as the Bagel server process.

The [vendor advisory](https://github.com/Extelligence-ai/bagel/security/advisories/GHSA-gx2g-3pch-43q5) covers both flaws. It was published on 2026-11-15, is labelled Critical with no score, and printed "No known CVE" when read on 2026-11-28. VulnCheck scores both records 7.7 with high attack complexity and user interaction. This file uses `high` because both paths need injected text to reach the model first.

### Servers with no authentication over HTTP

- **bigcommerce-api-mcp 1.0.0.** [CVE-2026-138034](https://cveawg.mitre.org/api/cve/CVE-2026-138034) says the `/sse` and `/messages` routes skipped the authentication check. A remote caller could read product, order and customer records with the operator's BigCommerce API key. The [vendor advisory](https://github.com/isaacgounton/bigcommerce-api-mcp/security/advisories/GHSA-q9p3-23c9-686x), published 2026-10-02, limits this to SSE mode on deployments that set `MCP_AUTH_TOKEN`. It says the server bound to all interfaces by default and that the exposed tools were read-only. The npm registry has no package named `bigcommerce-api-mcp`. The 1.0.1 release tag in the repository was not opened.
- **Crypto APIs MCP servers.** [CVE-2026-138026](https://cveawg.mitre.org/api/cve/CVE-2026-138026) lists 14 `@cryptoapis-io/mcp-*` packages. Started with Streamable HTTP transport and `--api-key`, the server binds `0.0.0.0` and exposes `/mcp` with no authentication. The record says callers can spend paid credits, read account data, redirect event subscriptions and delete HD wallet xPubs. Fixed versions are 0.5.0 for `mcp-blockchain-events`, `mcp-blockchain-fees`, `mcp-broadcast` and `mcp-prepare-transactions`, 0.2.0 for `mcp-aml`, and 0.4.0 for the other nine. npm shows the fixed versions of the seven packages queried uploaded on 2026-09-24.
- **Pydantic Deep.** [CVE-2026-137953](https://cveawg.mitre.org/api/cve/CVE-2026-137953) says the bundled DeepResearch FastAPI app exposes HTTP routes and a `/ws/chat` WebSocket with no authentication. Callers can list sessions, read event logs and workspace files, drive the agent and delete sessions. The record describes a server "bound to all interfaces". The [vendor advisory](https://github.com/vstorm-co/pydantic-deepagents/security/advisories/GHSA-26gv-pq4g-6m85), published 2026-11-26, says the app binds to loopback by default and scopes the flaw to network-accessible deployments. It scores 7.5 with confidentiality impact only. The vendor page says to set `DEEPRESEARCH_PASSWORD` to require authentication.

### SiYuan

[CVE-2026-137469](https://cveawg.mitre.org/api/cve/CVE-2026-137469) says the AI agent chat panel writes assistant replies into the page without sanitising HTML. The record says an attacker who influences a model reply, through indirect prompt injection or a configured model endpoint, can run OS commands in desktop local-kernel mode. The [vendor advisory](https://github.com/siyuan-note/siyuan/security/advisories/GHSA-3rvg-qxwg-f3c6) was published on 2026-11-11. It says remote-kernel mode applies a Content-Security-Policy and that local mode is the exposed configuration. It also says a saved session renders the markup again each time it is opened.

### SSRF and write-guard bypasses

- **mcp-video-analyzer.** [CVE-2026-138033](https://cveawg.mitre.org/api/cve/CVE-2026-138033) says any `http(s)` URL ending in a video extension was fetched, including loopback, private and cloud metadata addresses. The record says prompt injection can trigger it through tools such as `get_frames`.
- **WhoDB.** [CVE-2026-138032](https://cveawg.mitre.org/api/cve/CVE-2026-138032) says the MCP `whodb_query` tool ran file-writing SQL without approval, in confirmation and read-only modes. The record names PostgreSQL `lo_export` and MySQL `SELECT INTO OUTFILE`. The Docker Hub tag `clidey/whodb:0.132.0` was pushed on 2026-09-29.
- **Wazuh-MCP-Server.** [CVE-2026-138029](https://cveawg.mitre.org/api/cve/CVE-2026-138029) says the `blueteam_check_webshell` tool accepted hostnames that resolve to internal addresses. The record's range is a pair of commit hashes.
- **pdf-reader-mcp.** [CVE-2026-138030](https://cveawg.mitre.org/api/cve/CVE-2026-138030) says the PDF URL loader checked the resolved address and did not pin it for the fetch. The record lists 3.0.16 as affected on its own. npm also has 3.0.17, 3.0.18, 3.1.0 and 3.1.1, which the record does not list. npm's `latest` was 8.5.19 on 2026-11-28.
- **Typebot.** [CVE-2026-138031](https://cveawg.mitre.org/api/cve/CVE-2026-138031) says an authenticated bot author could reference another workspace's legacy webhook. The record says the author could read its URL, headers and body, or overwrite its URL.

## Am I affected?

```bash
pip show bagel-mcp pydantic-deep 2>/dev/null | grep -E '^(Name|Version)'
npm ls -g --depth=0 2>/dev/null | grep -E 'mcp-video-analyzer|@cryptoapis-io/mcp-|whodb|@sylphx/pdf-reader-mcp'
grep -rE 'bagel-mcp|mcp-video-analyzer|@cryptoapis-io/mcp-|whodb|pdf-reader-mcp|bigcommerce-api-mcp' \
  ~/.claude.json ~/.cursor/mcp.json .mcp.json 2>/dev/null
```

Compare each version with the table. For the three unauthenticated servers, check whether the process listens on a non-loopback address. SiYuan shows its version in the About dialog. Typebot self-hosters can read the image tag of the builder and viewer containers.

## If you are affected

- Upgrade to the fixed version in the table. For Wazuh-MCP-Server, update the checkout to commit 2bbfe12 or later.
- If a Crypto APIs or bigcommerce-api-mcp server was reachable from another host, rotate the API key it held. Review the provider account for calls you did not make.
- If a Pydantic Deep DeepResearch app was reachable from another host, treat its session logs and workspace files as read. Set `DEEPRESEARCH_PASSWORD` after upgrading.
- If Bagel processed logs or topics from a source you do not control, follow [if your local AI agent was exploited](../playbooks/if-your-local-ai-agent-was-exploited.md).

## Prevention

- Bind MCP servers to loopback and put authentication in front of any HTTP transport. See [MCP hygiene](../prevention/mcp-hygiene.md).
- A tool annotated read-only is a label set by the server author. Run database and file tools under an OS account that cannot write outside the data they need. See [agent sandboxing](../prevention/agent-sandboxing.md).

## Sources

- CVE Services records, read 2026-11-28: [CVE-2026-138026](https://cveawg.mitre.org/api/cve/CVE-2026-138026), [CVE-2026-138027](https://cveawg.mitre.org/api/cve/CVE-2026-138027), [CVE-2026-138028](https://cveawg.mitre.org/api/cve/CVE-2026-138028), [CVE-2026-138029](https://cveawg.mitre.org/api/cve/CVE-2026-138029), [CVE-2026-138030](https://cveawg.mitre.org/api/cve/CVE-2026-138030), [CVE-2026-138031](https://cveawg.mitre.org/api/cve/CVE-2026-138031), [CVE-2026-138032](https://cveawg.mitre.org/api/cve/CVE-2026-138032), [CVE-2026-138033](https://cveawg.mitre.org/api/cve/CVE-2026-138033), [CVE-2026-138034](https://cveawg.mitre.org/api/cve/CVE-2026-138034), [CVE-2026-137953](https://cveawg.mitre.org/api/cve/CVE-2026-137953), [CVE-2026-137469](https://cveawg.mitre.org/api/cve/CVE-2026-137469). Descriptions, ranges, scores and references.
- [Bagel vendor advisory GHSA-gx2g-3pch-43q5](https://github.com/Extelligence-ai/bagel/security/advisories/GHSA-gx2g-3pch-43q5), read 2026-11-28 through a summarizing fetch. Date, label, package, range.
- [bigcommerce-api-mcp vendor advisory GHSA-q9p3-23c9-686x](https://github.com/isaacgounton/bigcommerce-api-mcp/security/advisories/GHSA-q9p3-23c9-686x), read 2026-11-28 through a summarizing fetch. Date, SSE and token conditions, default bind, fix.
- [Pydantic Deep vendor advisory GHSA-26gv-pq4g-6m85](https://github.com/vstorm-co/pydantic-deepagents/security/advisories/GHSA-26gv-pq4g-6m85), read 2026-11-28 through a summarizing fetch. Date, score, loopback default, password setting.
- [SiYuan vendor advisory GHSA-3rvg-qxwg-f3c6](https://github.com/siyuan-note/siyuan/security/advisories/GHSA-3rvg-qxwg-f3c6), read 2026-11-28 through a summarizing fetch. Date, range, kernel modes.
- [GitHub Advisory Database, `mcp` listing](https://github.com/advisories?query=mcp+sort%3Apublished-desc) and [`agent` listing](https://github.com/advisories?query=agent+sort%3Apublished-desc), read 2026-11-28. The rows that led to the records.
- Registries, queried 2026-11-28: PyPI simple index for `bagel-mcp` and `pydantic-deep`, npm `time` for `mcp-video-analyzer`, `@sylphx/pdf-reader-mcp`, `whodb`, `@clidey/whodb-cli` and seven `@cryptoapis-io/mcp-*` packages, Docker Hub tags for `baptistearno/typebot-builder` and `clidey/whodb`.
- Not opened: the vendor advisories for Crypto APIs, WhoDB, Wazuh-MCP-Server, pdf-reader-mcp, Typebot and mcp-video-analyzer, and every repository release page.
