---
id: 2026-11-mcp-server-advisories-november-19-20-jupyter-todoist-k8s-sqlite-obsidian-codewhale-fixed-earlier
title: "Twelve MCP server and coding-agent advisories published 2026-11-19 and 11-20: Jupyter MCP Server, Todoist MCP, k8s-mcp-server and seven more; fixes shipped June to October"
date_disclosed: 2026-11-19
last_updated: 2026-11-22
severity: high
status: patched
ecosystems: [mcp, npm, pypi, go, jupyter, kubernetes, coding-agents]
tools_affected: ["jupyter-mcp-server before 1.0.3", "@doist/todoist-mcp before 10.3.3", "k8s-mcp-server before 1.1.0", "StacklokLabs sqlite-mcp before 0.1.2", "obsidian-sync-mcp before 0.5.7", "Gortex before 0.55.0", "axon-mcp 0.1.0 (no fixed release)", "@apireno/domshell before 2.0.8", "safari-mcp before 2.22.15", "codewhale 0.8.67 and earlier"]
tags: [mcp, dns-rebinding, missing-authentication, sql-injection, path-traversal, backfill, ghsa, coding-agents]
---

## TL;DR

The [GitHub Advisory Database](https://github.com/advisories?query=mcp+sort%3Apublished-desc) published twelve advisories for ten MCP servers and coding agents on 2026-11-19 and 2026-11-20. Nine of the ten products shipped the fix between 2026-06-24 and 2026-10-19, so a current install is already fixed. `axon-mcp` has no fixed release on PyPI. Two are rated critical: a website can drive a local Jupyter MCP Server or Todoist MCP server in HTTP mode. Check installed versions against the table.

## What happened

The database rows are dated 2026-11-19 and 2026-11-20. The vendor advisory pages were not opened, so the vendor publication dates are not known. Fix dates come from the registries, read 2026-11-20.

| Product (package) | Id | Rating | Affected | Fixed, registry date | Condition in the record |
|---|---|---|---|---|---|
| Jupyter MCP Server (PyPI `jupyter-mcp-server`) | [CVE-2026-77359](https://cveawg.mitre.org/api/cve/CVE-2026-77359) | 9.3, GitHub CNA, CVSS 4.0 | before 1.0.3 | 1.0.3, 2026-07-11 | standalone `streamable-http` mode. A website the user visits can repoint the server's Jupyter backend through DNS rebinding |
| Jupyter MCP Server | [CVE-2026-77318](https://api.osv.dev/v1/vulns/GHSA-24pw-rf5p-mgp7) | High | before 1.0.3 | 1.0.3, 2026-07-11 | same mode. The management routes do not check `MCP_TOKEN` |
| Todoist MCP (npm `@doist/todoist-mcp`) | [CVE-2026-76807](https://cveawg.mitre.org/api/cve/CVE-2026-76807) | 9.3, GitHub CNA, CVSS 3.1 | before 10.3.3 | 10.3.3, 2026-06-24 | the optional `todoist-mcp-http` server. A website can call tools with the server's Todoist API key |
| k8s-mcp-server (Go `github.com/reza-gholizade/k8s-mcp-server`) | [CVE-2026-130007](https://api.osv.dev/v1/vulns/GHSA-m932-63jc-4jqq) | High | before 1.1.0 | 1.1.0, 2026-08-31 | default SSE transport has no authentication. Anyone who reaches the port runs Kubernetes tools |
| sqlite-mcp (Go `github.com/StacklokLabs/sqlite-mcp`) | [CVE-2026-130008](https://api.osv.dev/v1/vulns/GHSA-q433-mp6c-8v4f) | High | before 0.1.2 | 0.1.2, 2026-10-19 | read-only mode, the default, can be bypassed to write |
| obsidian-sync-mcp (npm) | [CVE-2026-77283](https://api.osv.dev/v1/vulns/GHSA-mx6p-3fg7-v6pj) | High | before 0.5.7 | 0.5.7, 2026-07-10 | no-auth mode, run without `MCP_AUTH_TOKEN`. A website can reach the vault |
| Gortex (Go `github.com/zzet/gortex`) | [CVE-2026-62964](https://api.osv.dev/v1/vulns/GHSA-w42c-h7hr-f67p) | High | before 0.55.0 | 0.55.0, 2026-06-27 | write tools accept paths outside the indexed repository |
| Axon (PyPI `axon-mcp`) | [CVE-2026-76818](https://api.osv.dev/v1/vulns/GHSA-r7wg-f7r2-8wf7) | High | 0.1.0 | none on PyPI | downloads and runs a helper binary with no integrity check |
| DOMShell (npm `@apireno/domshell`) | [CVE-2026-75518](https://api.osv.dev/v1/vulns/GHSA-vg83-hcp4-5qcc) | Moderate | before 2.0.8 | 2.0.8, 2026-07-08 | a read-tier tool can change page state without `--allow-write` |
| Safari MCP (npm `safari-mcp`) | [GHSA-4rj4-rcrq-gr92](https://api.osv.dev/v1/vulns/GHSA-4rj4-rcrq-gr92), no CVE | Moderate | before 2.22.15 | 2.22.15, 2026-10-10 | a tool argument can run JavaScript in the page |
| CodeWhale (npm `codewhale`, crates.io `codewhale-tui`) | [CVE-2026-83816](https://api.osv.dev/v1/vulns/GHSA-3mgh-93r5-r7jf) | High | 0.8.67 and earlier | 0.9.0, npm 2026-07-16 | the shell tool auto-approves some search commands that can run programs |
| CodeWhale | [CVE-2026-83817](https://api.osv.dev/v1/vulns/GHSA-8hp3-xxrg-v9c8) | High | 0.8.67 and earlier | 0.9.0, npm 2026-07-16 | automations default to `auto_approve` true |

Notes on single rows:

- **Axon.** PyPI lists one version, 0.1.0, uploaded 2026-06-16. The record marks it last affected and references three repository commits. No release carries them as of 2026-11-20.
- **Jupyter MCP Server.** PyPI's newest version is 2.2.6.
- **Newest versions when read:** `@doist/todoist-mcp` 14.0.5, `obsidian-sync-mcp` 0.12.1, `@apireno/domshell` 2.0.11, `safari-mcp` 2.24.1, `codewhale` 0.10.2, Gortex v0.64.11, k8s-mcp-server v1.1.0, sqlite-mcp v0.1.2.
- The crates.io version of `codewhale-tui` was not checked.

This file rates the batch `high`. Both critical scores apply to an optional HTTP mode, and both fixes shipped more than four months before the database rows.

Earlier CodeWhale advisories are in [the August agent-framework batch](2026-08-agent-framework-mcp-cve-batch.md).

## Update 2026-11-22: AWS Document Loader MCP Server, CVE-2026-130901

[AWS bulletin 2026-195-AWS](https://aws.amazon.com/security/security-bulletins/2026-195-aws/) of 2026-11-20 covers `awslabs.document-loader-mcp-server` 1.0.10 through 1.0.20. When `DOCUMENT_BASE_DIR` is unset or empty and CI or test environment variables are present, the base directory restriction is not enforced. Someone who can influence the documents the client processes could read supported files outside the directory, and in 1.0.12 through 1.0.20 write PNG slide images elsewhere. Version 1.0.21 fixes it. PyPI's newest was 1.0.27 when read on 2026-11-22. AWS's workaround is to set `DOCUMENT_BASE_DIR` to the documents directory, and not to `/`.

## Am I affected?

```bash
pip show jupyter-mcp-server axon-mcp 2>/dev/null | grep -E '^(Name|Version)'
npm ls -g @doist/todoist-mcp obsidian-sync-mcp @apireno/domshell safari-mcp codewhale
```

- Compare each version with the table.
- Go servers: check the version of the binary or the image tag you deployed.
- Check your MCP client configuration for these servers started over HTTP or SSE instead of stdio.

## If you are affected

1. Upgrade to the fixed version or newer and restart the server.
2. Remove `axon-mcp` until a fixed release exists.
3. If k8s-mcp-server ran on a reachable port without authentication, review cluster audit logs and rotate the credentials it used. See [if your local AI agent was exploited](../playbooks/if-your-local-ai-agent-was-exploited.md).
4. If a Jupyter, Todoist or Obsidian server ran in HTTP mode on an old version, review recent changes to notebooks, tasks or notes.

## Prevention

- Run local MCP servers over stdio. Use HTTP only with a token and Host and Origin checks.
- Pin MCP servers and update them on a schedule. See [MCP hygiene](../prevention/mcp-hygiene.md).

## Sources

- [GitHub Advisory Database, `mcp` listing by publication](https://github.com/advisories?query=mcp+sort%3Apublished-desc) and [`agent` listing](https://github.com/advisories?query=agent+sort%3Apublished-desc), read 2026-11-20: the rows and their dates.
- OSV copies of the twelve advisories, linked per row, read 2026-11-20: ranges, fixed versions, descriptions.
- [CVE-2026-77359](https://cveawg.mitre.org/api/cve/CVE-2026-77359) and [CVE-2026-76807](https://cveawg.mitre.org/api/cve/CVE-2026-76807), CVE Services records: the two 9.3 scores and their conditions.
- Registry reads on 2026-11-20: `npm view <package> time`, `pypi.org/pypi/<package>/<version>/json`, `proxy.golang.org/<module>/@latest`.
- [AWS bulletin 2026-195-AWS](https://aws.amazon.com/security/security-bulletins/2026-195-aws/), 2026-11-20, read 2026-11-22, and `pip index versions awslabs.document-loader-mcp-server` the same day.
- Not opened: the ten vendor advisory pages, crates.io.
