---
id: 2026-11-nginx-http2-heap-overflow-cve-2026-123007-unauthenticated-code-execution-fixed-1-31-9-1-30-7
title: "NGINX HTTP/2 heap overflow allows unauthenticated code execution (CVE-2026-123007); four more critical flaws; fixed in 1.31.9 and 1.30.7"
date_disclosed: 2026-11-18
last_updated: 2026-11-19
severity: critical
status: patched
ecosystems: [nginx, self-hosted, docker, web-server]
tools_affected: ["NGINX Open Source 1.9.5 through 1.31.8", "NGINX Plus 37.x before 37.3.0.1 and 37.0.8.1, and R33 onward", "self-hosted apps, gateways and agent dashboards served through NGINX with HTTP/2"]
tags: [cve, nginx, http2, http3, memory-corruption, unauthenticated, rce, reverse-proxy, public-poc]
---

## TL;DR
[NGINX's advisory list](https://nginx.org/en/security_advisories.html) says every open-source release from 1.9.5 through 1.31.8 has a memory corruption bug in HTTP/2 flow control (CVE-2026-123007). [F5's CNA record](https://cveawg.mitre.org/api/cve/CVE-2026-123007) says an attacker with no login can crash a worker, and can run code where ASLR is off or bypassed. Wiz and Rapid7 say they bypassed ASLR. Upgrade to 1.31.9 or 1.30.7 and restart NGINX. Four more flaws scored 9.2 are fixed in the same releases.

## What happened

F5 published the releases and five CNA records on 2026-11-18. Each record scores 9.2 (CVSS 4.0) and 8.1 (CVSS 3.1), and each says code execution needs ASLR to be disabled or bypassed.

| CVE | Needs | Vulnerable (nginx.org) | nginx.org severity |
|---|---|---|---|
| [CVE-2026-123007](https://cveawg.mitre.org/api/cve/CVE-2026-123007) | HTTP/2 on | 1.9.5 to 1.31.8 | major |
| [CVE-2026-123633](https://cveawg.mitre.org/api/cve/CVE-2026-123633) | HTTP/2 on, requests proxied to a backend, worker low on `worker_connections` | 1.19.7 to 1.31.8 | medium |
| [CVE-2026-123634](https://cveawg.mitre.org/api/cve/CVE-2026-123634) | a proxied server name built from variables, plus an SSI or mirror subrequest that resolves the same name | 0.6.18 to 1.31.8 | medium |
| [CVE-2026-121810](https://cveawg.mitre.org/api/cve/CVE-2026-121810) | HTTP/3 on | 1.25.0 to 1.31.8 | medium |
| [CVE-2026-113425](https://cveawg.mitre.org/api/cve/CVE-2026-113425) | NGINX used as a mail proxy | 0.5.33 to 1.31.8 | major |

Notes on the table:

- nginx.org lists ten advisories fixed in 1.31.9. The other five are not scored 9.2 by F5 in the sources read.
- The CNA record for CVE-2026-121810 prints the first affected version as `1.25.09`. nginx.org prints 1.25.0.
- For NGINX Plus the records list 37.1.0 before 37.3.0.1, 37.0.0 before 37.0.8.1, and R33 onward with no fixed build. The record for CVE-2026-123633 names 37.2.0.1 and 37.0.7.1 as its fixed builds.

[Wiz](https://www.wiz.io/blog/nginx-http2-rce-vulnerabilities) says it ran code through CVE-2026-123007 on NGINX "serving ordinary static files, without a backend application or third-party modules". Wiz credits Ikotas Labs, Metnir, Rapid7 and Xint with independent reports.

[SecurityWeek](https://www.securityweek.com/f5-patches-critical-nginx2root-flaws-as-poc-exploits-go-public/) reports that Rapid7 published proof-of-concept code. Rapid7 says its method sends about 128 GB of HTTP/2 data and fails on slow links. [The Hacker News](https://thehackernews.com/2026/11/10-year-old-nginx-http2-flaw-lets.html) reports that code runs as the worker process. It says Xint reached root on the host through a separate Linux kernel SCTP bug, including from a Docker container.

No source read reports an attack. CISA's KEV feed did not list any of the five ids when read on 2026-11-19.

## Am I affected?

- Run `nginx -v`. Any open-source version from 1.9.5 through 1.31.8 is affected by CVE-2026-123007 when HTTP/2 is on.
- HTTP/2 is on where a `listen` directive includes `http2` or where `http2 on` is set.
- The Hacker News gives a check: `openssl s_client` with `-alpn h2` against the server prints `ALPN protocol: h2` when it accepts HTTP/2. Behind a CDN, test the NGINX origin.
- A distribution package can carry the fix under an older version string. The Hacker News says Ubuntu and Debian had not shipped fixed packages on 2026-11-18. Compare the full package version with the distribution's advisory.
- Check container images too. The Hacker News says the official Docker images had 1.31.9 and 1.30.7 tags on 2026-11-18.

## If you are affected

1. Upgrade to 1.31.9 (mainline) or 1.30.7 (stable). Rebuild images that bundle NGINX.
2. Restart NGINX fully. The Hacker News notes that a reload leaves the old executable running.
3. If you cannot upgrade yet, turn off HTTP/2. On 1.25.1 and later set `http2 off;` and remove `http2` from `listen` directives. This covers CVE-2026-123007 and CVE-2026-123633 only.
4. NGINX Plus R33 to R36 have no fixed build in the records. Move to a fixed 37.x build.
5. For a server you think was reached, see [if your web app was compromised](../playbooks/if-your-webapp-was-compromised.md) and rotate the secrets on that host.

## Prevention

- Pin the NGINX version in images and rebuild on security releases. A base image tag from October still carries these bugs.
- Do not run the proxy on the same host as provider keys when a separate host or container is possible. See [credential hygiene](../prevention/credential-hygiene.md).

## Sources

- [nginx.org security advisories](https://nginx.org/en/security_advisories.html), read 2026-11-19: the ten rows fixed in 1.31.9, ranges and the project's own severity labels.
- [CVE-2026-123007](https://cveawg.mitre.org/api/cve/CVE-2026-123007), [CVE-2026-123633](https://cveawg.mitre.org/api/cve/CVE-2026-123633), [CVE-2026-123634](https://cveawg.mitre.org/api/cve/CVE-2026-123634), [CVE-2026-121810](https://cveawg.mitre.org/api/cve/CVE-2026-121810), [CVE-2026-113425](https://cveawg.mitre.org/api/cve/CVE-2026-113425): F5 CNA records, published 2026-11-18, read 2026-11-19. Scores and vectors are F5's.
- [Wiz: Unauthenticated Remote Code Execution in NGINX](https://www.wiz.io/blog/nginx-http2-rce-vulnerabilities), 2026-11-18: timeline, credits, the static-file test.
- [The Hacker News: 10-Year-Old NGINX HTTP/2 Flaw](https://thehackernews.com/2026/11/10-year-old-nginx-http2-flaw-lets.html), 2026-11-18: checks, workarounds, distribution and Docker status.
- [SecurityWeek: F5 Patches Critical NGINX2Root Flaws as PoC Exploits Go Public](https://www.securityweek.com/f5-patches-critical-nginx2root-flaws-as-poc-exploits-go-public/), read 2026-11-19: Rapid7's limits.
- Not opened: F5's K articles, the Rapid7, Xint and CIRCL pages, and the Ubuntu and Debian trackers.
