---
id: 2026-11-php-november-19-security-release-eight-cves-fpm-request-smuggling-session-code-execution-fixed-8-5-13
title: "PHP 8.5.13, 8.4.28, 8.3.37 and 8.2.36 fix 17 issues, seven CVEs scored 9.2: PHP-FPM request smuggling, session and use-after-free code execution"
date_disclosed: 2026-11-19
last_updated: 2026-11-20
severity: critical
status: patched
ecosystems: [php, self-hosted, web-server, docker]
tools_affected: ["PHP 8.5 before 8.5.13", "PHP 8.4 before 8.4.28", "PHP 8.3 before 8.3.37", "PHP 8.2 before 8.2.36", "PHP-FPM behind nginx, Apache or HAProxy with backend connection reuse"]
tags: [cve, php, php-fpm, request-smuggling, session, use-after-free, unauthenticated, rce, security-release]
---

## TL;DR
[PHP released 8.5.13, 8.4.28, 8.3.37 and 8.2.36](https://www.php.net/archive/2026.php) on 2026-11-19 as security releases. AWS counts 17 fixed issues. Nine have CVE records read for this file, seven scored 9.2. [CVE-2026-129289](https://cveawg.mitre.org/api/cve/CVE-2026-129289) lets an unauthenticated request forge a second PHP-FPM request when the front end reuses backend connections, which is not the nginx or Apache default. Upgrade and restart PHP.

## What happened

All eight records in this table were published on 2026-11-19 by the PHP Group. Scores are CVSS 4.0 and are the PHP Group's.

| CVE | Title on the record | Affected lines | Score |
|---|---|---|---|
| [CVE-2026-129289](https://cveawg.mitre.org/api/cve/CVE-2026-129289) | PHP-FPM request smuggling through an unread HTTP request body | 8.2, 8.3, 8.4, 8.5 | 9.2 |
| [CVE-2026-115560](https://cveawg.mitre.org/api/cve/CVE-2026-115560) | Session serializer mismatch can lead to remote code execution | 8.2, 8.3, 8.4, 8.5 | 9.2 |
| [CVE-2026-126714](https://cveawg.mitre.org/api/cve/CVE-2026-126714) | Partially overwritten session files can lead to remote code execution | 8.2, 8.3, 8.4, 8.5 | 9.2 |
| [CVE-2026-129496](https://cveawg.mitre.org/api/cve/CVE-2026-129496) | Timezone cache use-after-free can lead to remote code execution | 8.2, 8.3, 8.4, 8.5 | 9.2 |
| [CVE-2026-129481](https://cveawg.mitre.org/api/cve/CVE-2026-129481) | Use-after-free after interrupted session shutdown | 8.3, 8.4, 8.5 | 9.2 |
| [CVE-2026-129182](https://cveawg.mitre.org/api/cve/CVE-2026-129182) | Use-after-free via repopulation of last_fatal_error_backtrace global after shutdown | 8.5 | 9.2 |
| [CVE-2026-129474](https://cveawg.mitre.org/api/cve/CVE-2026-129474) | Use-after-free in magic method backtraces can lead to remote code execution | 8.5 | 9.2 |
| [CVE-2026-129291](https://cveawg.mitre.org/api/cve/CVE-2026-129291) | PHP-FPM epoll use-after-free can lead to local privilege escalation | 8.2.7 onward, 8.3, 8.4, 8.5 | 8.8 |

The fixed versions on every record are 8.2.36, 8.3.37, 8.4.28 and 8.5.13 for the lines it lists.

Conditions the records and [The Hacker News](https://thehackernews.com/2026/11/php-fixes-7-critical-flaws-including.html) state:

- **CVE-2026-129289.** The application opens `php://input` without reading it to the end, and the front end reuses backend connections. The record gives nginx with `fastcgi_keep_conn on` and Apache mod_proxy_fcgi with `enablereuse=on` as examples.
- **CVE-2026-115560.** Session upload progress is enabled, and the same session is later read with a different serializer. Code execution needs a gadget chain in the reading application.
- **CVE-2026-126714.** The Hacker News says it needs influence over session data, an interrupted write and a gadget chain. It affects applications with file-based sessions. Depthfirst named it phpAfterShell.
- **CVE-2026-129291.** Local. It needs code already running in an FPM worker.

No source read reports an attack. This is the second PHP security release in a month. The October one is in [the PHP2Shell advisory](2026-10-php2shell-cve-2026-109618-109619-unauthenticated-rce-embargo-break-pre-disclosure-exploitation.md).

## Am I affected?

- Run `php -v` on every host and in every container image, including PHP bundled inside other software.
- Any 8.2, 8.3, 8.4 or 8.5 release below the fixed versions is affected by at least four of the ids.
- For the request smuggling bug, search the proxy configuration for `fastcgi_keep_conn on` or `enablereuse=on`.
- The records list no line older than 8.2. No source read says whether older lines are affected.

## If you are affected

1. Upgrade to 8.5.13, 8.4.28, 8.3.37 or 8.2.36 and restart PHP-FPM or the web server.
2. If you cannot upgrade yet, The Hacker News relays one step: turn off session upload progress. CVE-2026-129289 needs backend connection reuse, so leave that off in the proxy.
3. A distribution package can carry the fix under an older version string. Check its changelog for the CVE ids.
4. For a server you think was reached, see [if your web app was compromised](../playbooks/if-your-webapp-was-compromised.md).

## Prevention

- Rebuild PHP base images on every security release. The project pre-announces them on [php.net](https://www.php.net/archive/2026.php).
- Keep one application per session store. Two applications that share a store with different serializers create the condition for CVE-2026-115560.

## Update 2026-11-20: a ninth CVE record, CVE-2026-128064, sends `HTTPS://` and `FTPS://` URLs in plaintext; AWS counts 17 issues and says PHP 8.1 is affected and unfixed

The PHP Group published [CVE-2026-128064](https://cveawg.mitre.org/api/cve/CVE-2026-128064) on 2026-11-19, scored 8.2 on CVSS 4.0. This file listed eight records on 2026-11-19.

The record says the HTTP and FTP stream wrappers accept a URL scheme in any letter case and enable TLS only when the scheme has a lowercase "s" at a fixed position. A URL written `HTTPS://` or `FTPS://`, passed to `file_get_contents()`, `fopen()` or another stream function, or received as a redirect target, goes over unencrypted HTTP or FTP. An attacker who can observe the traffic reads the credentials, request bodies and files in it.

[The php-src advisory](https://github.com/php/php-src/security/advisories/GHSA-f6gg-rchx-xw8j) lists the same fixed versions as the rest of the batch: 8.5.13, 8.4.28, 8.3.37 and 8.2.36.

What to check: search application code and configuration for URLs with an upper-case scheme, and for server-side fetches of URLs a user or a remote server supplies. Rotate any credential such a request carried over an untrusted network.

[AWS bulletin 2026-190](https://aws.amazon.com/security/security-bulletins/2026-190-aws/) says the four releases "address 17 issues" and names seven CVE ids. This file has read nine CVE records, so some fixed issues have no record read here. The bulletin also says PHP 8.1 and earlier are end of life, get no fix, and are affected by some of the issues, including CVE-2026-129289. On PHP 8.1 or earlier, move to a supported branch.

## Sources

- [php.net news archive, 2026](https://www.php.net/archive/2026.php), read 2026-11-19: the four releases, each dated 19 Nov 2026 and labelled a security release.
- [CVE-2026-129289](https://cveawg.mitre.org/api/cve/CVE-2026-129289), [CVE-2026-115560](https://cveawg.mitre.org/api/cve/CVE-2026-115560), [CVE-2026-126714](https://cveawg.mitre.org/api/cve/CVE-2026-126714), [CVE-2026-129496](https://cveawg.mitre.org/api/cve/CVE-2026-129496), [CVE-2026-129481](https://cveawg.mitre.org/api/cve/CVE-2026-129481), [CVE-2026-129182](https://cveawg.mitre.org/api/cve/CVE-2026-129182), [CVE-2026-129474](https://cveawg.mitre.org/api/cve/CVE-2026-129474), [CVE-2026-129291](https://cveawg.mitre.org/api/cve/CVE-2026-129291): PHP Group CNA records, read 2026-11-19.
- [The Hacker News: PHP Fixes 7 Critical Flaws](https://thehackernews.com/2026/11/php-fixes-7-critical-flaws-including.html), 2026-11-19: conditions, Depthfirst's name for CVE-2026-126714, the interim step.
- Not opened: the eight php-src advisory pages the records reference, the per-version changelogs, and Depthfirst's post.
- [CVE-2026-128064, CVE Services record (PHP Group)](https://cveawg.mitre.org/api/cve/CVE-2026-128064) and [GHSA-f6gg-rchx-xw8j](https://github.com/php/php-src/security/advisories/GHSA-f6gg-rchx-xw8j), read 2026-11-20: the ninth CVE, its score and fixed versions.
- [AWS security bulletin 2026-190](https://aws.amazon.com/security/security-bulletins/2026-190-aws/), 2026-11-19: the count of 17 issues, the PHP 8.1 statement.
