---
id: 2026-11-pomerium-mcp-token-endpoint-skips-client-secret-check-cve-2026-135300-fixed-0-34-0
title: "Pomerium 0.30.0 to below 0.34.0: MCP token endpoint skips the secret check for client_secret_basic clients (CVE-2026-135300); fixed in 0.34.0"
date_disclosed: 2026-11-23
last_updated: 2026-11-24
severity: high
status: patched
ecosystems: [go, mcp, identity-proxy, oauth]
tools_affected: ["Pomerium 0.30.0 to below 0.34.0", "MCP servers published through Pomerium's MCP token endpoint", "MCP clients registered with `client_secret_basic`"]
tags: [cve, mcp, oauth, authentication-bypass, identity-proxy, pomerium, patched, silent-fix]
---

## TL;DR

Pomerium 0.30.0 to below 0.34.0 does not check the client secret at its MCP token endpoint for `client_secret_basic` clients, per [CVE-2026-135300](https://cveawg.mitre.org/api/cve/CVE-2026-135300). An attacker who already holds a victim's intercepted authorization code or refresh token can redeem it with any secret and get the victim's access tokens. Fixed in 0.34.0, tagged 2026-11-04. The upgrade is a breaking change for some MCP clients.

## What happened

The record names Pomerium's MCP token endpoint.

VulnCheck published the record on 2026-11-23 and credits Theodoros Lampropoulos. The record's public date is 2026-09-18. It scores the flaw 9.1 on CVSS 4.0, `AV:N/AC:H/AT:P/PR:N/UI:N/VC:H/VI:H/VA:N/SC:N/SI:N/SA:N`. This file rates it `high`. The record's own description requires an intercepted code or token first, and its vector marks attack complexity high.

The [v0.34.0 release notes](https://github.com/pomerium/pomerium/releases/tag/v0.34.0) list the fix under breaking changes as "mcp: verify the client secret for client_secret_basic" (pull request 6787). The notes carry no CVE or advisory id. The Go module proxy dates v0.34.0 at 2026-11-04 and lists v0.34.1 as the newest version on 2026-11-24.

## Am I affected?

- You run Pomerium 0.30.0 to below 0.34.0 and route MCP clients through it.
- The record names clients that authenticate with `client_secret_basic`.
- The endpoint is `/.pomerium/mcp/token`.

Check the version of the binary or the image tag you deploy.

## If you are affected

1. Upgrade to 0.34.0 or later.
2. Test MCP clients after the upgrade. The release notes say clients with no `token_endpoint_auth_method` set now receive `invalid_client` unless they send their secret.
3. If authorization codes or refresh tokens could have leaked through logs, a proxy or a shared machine, revoke the sessions and have users sign in again. This step is this file's advice.

## Prevention

- Keep authorization codes and refresh tokens out of logs and URLs that other systems store.
- See [MCP hygiene](../prevention/mcp-hygiene.md) and [credential hygiene](../prevention/credential-hygiene.md).

## Sources

- [CVE-2026-135300](https://cveawg.mitre.org/api/cve/CVE-2026-135300): CNA VulnCheck, published 2026-11-23. Description, range, score and vector, references.
- [VulnCheck advisory](https://www.vulncheck.com/advisories/pomerium-0.30.0-before-0.34.0-missing-client-secret-verification-via-mcp-token-endpoint), read 2026-11-24: credit, fixed version.
- [Pomerium v0.34.0 release notes](https://github.com/pomerium/pomerium/releases/tag/v0.34.0), read 2026-11-24: the breaking-change entry and the client behaviour after upgrade.
- `proxy.golang.org` for `github.com/pomerium/pomerium`, read 2026-11-24: v0.34.0 time and the version list.
- Not opened: pull request 6787, the fix commit and Pomerium's own advisory tab. OSV has a record under the CVE id and none under the database row's GHSA id on 2026-11-24.
