# mcp-remote: evidence review

> Checked 2026-10-02; standards section and licence text added 2026-10-03. Public evidence supporting the [advisory correction and severity review](../advisories/2026-09-mcp-remote-oauth-discovery-ssrf-cve-batch.md).

## Mapping correction

[Issue #114](https://github.com/pranava0x0/vibe-coding-security/issues/114) correctly identified a mapping error: CVE-2026-51995 references F-02, not F-10. The decisive field is `containers.cna.references` in the CVE record. The other four mappings also match their finding-specific references.

The original sweep introduced the error on 2026-09-25. The old F-10 research score and CISA's F-02 score both read 7.5, but that does **not** establish how the mistake happened. The failure we can establish is that the table did not follow the cited reference. NVD, GitHub and OSV repeat the same upstream record; agreement among those copies is not independent verification.

## Registry evidence

Snapshots below preserve the responses fetched on 2026-10-02. These are public source records, not proof that every upstream claim is correct. Live endpoints: [CVE Services](https://cveawg.mitre.org/api/cve/CVE-2026-51995), [NVD](https://services.nvd.nist.gov/rest/json/cves/2.0?cveId=CVE-2026-51995), [OSV](https://api.osv.dev/v1/vulns/CVE-2026-51995). Substitute the CVE ID to retrieve a sibling record.

| CVE | Finding | Saved CVE record | Saved NVD response | Saved OSV response |
|---|---|---|---|---|
| CVE-2026-51994 | F-01 | [CVE](cve-evidence/CVE-2026-51994.cve.json) | [NVD](cve-evidence/CVE-2026-51994.nvd.json) | [OSV](cve-evidence/CVE-2026-51994.osv.json) |
| CVE-2026-51995 | F-02 | [CVE](cve-evidence/CVE-2026-51995.cve.json) | [NVD](cve-evidence/CVE-2026-51995.nvd.json) | [OSV](cve-evidence/CVE-2026-51995.osv.json) |
| CVE-2026-51996 | F-04 | [CVE](cve-evidence/CVE-2026-51996.cve.json) | [NVD](cve-evidence/CVE-2026-51996.nvd.json) | [OSV](cve-evidence/CVE-2026-51996.osv.json) |
| CVE-2026-51997 | F-08 | [CVE](cve-evidence/CVE-2026-51997.cve.json) | [NVD](cve-evidence/CVE-2026-51997.nvd.json) | [OSV](cve-evidence/CVE-2026-51997.osv.json) |
| CVE-2026-52001 | F-11 | [CVE](cve-evidence/CVE-2026-52001.cve.json) | [NVD](cve-evidence/CVE-2026-52001.nvd.json) | [OSV](cve-evidence/CVE-2026-52001.osv.json) |

Exact fields to inspect:

- Mapping: CVE `containers.cna.references[].url`.
- Attribution and score: CVE `containers.adp[].providerMetadata`, `title`, and `metrics[].cvssV3_1` (score, severity and full vector). MITRE supplied no CNA metrics in these records.
- NVD status: `vulnerabilities[0].cve.vulnStatus` is `Deferred`; the four `metrics.cvssMetricV31[]` entries identify CISA's provider UUID and type `Secondary`.
- OSV conflict: `affected[].ranges[].database_specific.extracted_events[]` marks 0.1.38 as fixed, with source `DESCRIPTION`. The corresponding CVE descriptions include 0.1.38 in the affected range. None of those inferred boundaries establishes a vendor fix.

## Impact and severity

The [advisory's dated score table](../advisories/2026-09-mcp-remote-oauth-discovery-ssrf-cve-batch.md#severity-review-2026-10-02) reproduces CISA-ADP's 9.1, 7.5, 9.8 and 8.8 scores with their vectors; F-11 has none. The site keeps **high / unconfirmed**, an editorial rating distinct from the external CVSS scores. The trade-off is a headline below two Critical scores, with the disagreement visible rather than silently resolved.

The versioned researcher pages support narrower claims:

| Finding | Source and locator | Evidence limit |
|---|---|---|
| F-01 | [Research, Security impact / Evidence](https://github.com/playb0t/mcp-remote-oauth-security/blob/v1.0.1/advisories/F-01-resource-metadata-ssrf.md) | Local canary received requests; no response exfiltration demonstrated. |
| F-02 | [Research, Security impact / Evidence](https://github.com/playb0t/mcp-remote-oauth-security/blob/v1.0.1/advisories/F-02-authorization-server-ssrf.md) | Blind probing demonstrated; no response exfiltration. |
| F-04 | [Research, Correction and limitations](https://github.com/playb0t/mcp-remote-oauth-security/blob/v1.0.1/advisories/F-04-md5-token-isolation.md) | No token namespace takeover or real-token access demonstrated; weak-hash hardening does not itself prove code execution. Research starts at 0.0.14; CVE starts at 0.1.16. |
| F-08 | [Research, Evidence and limitations](https://github.com/playb0t/mcp-remote-oauth-security/blob/v1.0.1/advisories/F-08-browser-url-validation.md) | Source/dependency review; no internal service contacted. Browser and destination controls affect impact. |
| F-10 | [Research, Evidence and limitations](https://github.com/playb0t/mcp-remote-oauth-security/blob/v1.0.1/advisories/F-10-redirect-validation-bypass.md) | Separate redirect-following finding, source review only; no CVE in this batch. |
| F-11 | [Research, Current positive controls](https://github.com/playb0t/mcp-remote-oauth-security/blob/v1.0.1/advisories/F-11-sse-token-origin-scope.md) | SDK origin validation and redirect credential stripping refute the originally claimed forwarding path in the reviewed dependencies. Research starts at 0.0.18; CVE starts at 0.1.18. |

These limits do not establish that stronger impact is impossible, nor reject or formally dispute a CVE. They establish what the cited research demonstrates. New vendor confirmation, a reproducible stronger impact, or changed records should trigger another review. No exploit was run for this review.

## Standards and guidance consulted

Each item was read on the date shown. They support the editorial decisions above; none is a statement about this package.

- [FIRST, CVSS v3.1 Specification, §1.2](https://www.first.org/cvss/v3-1/specification-document) (2026-10-03): the vector string should always be displayed with the score, and publishers are expected to provide both. This is why the score table carries vectors.
- [CISA Vulnrichment README](https://github.com/cisagov/vulnrichment) (2026-10-02): CISA's enrichment sits in its own ADP container, is added only where the CNA supplied none, and never overwrites the CNA's data. This is why the scores are attributed to CISA-ADP rather than to MITRE or NVD.
- [NIST, NVD operations update (2026-04-15)](https://www.nist.gov/news-events/news/2026/04/nist-updates-nvd-operations-address-record-cve-growth) (2026-10-02): NVD now schedules enrichment only for KEV, federal-use and critical-software CVEs; everything else is lowest priority. This is what "Deferred" means for these five records.
- [Model Context Protocol, Security Best Practices (2026-07-28), SSRF section](https://modelcontextprotocol.io/specification/2026-07-28/basic/security_best_practices) (2026-10-02): names the `resource_metadata` URL, the `authorization_servers` list and the authorization-server endpoints as attacker-controlled, lists redirect chains as a separate pattern, and says clients SHOULD block private ranges and validate redirect targets. This is why F-01, F-02 and F-10 are distinct rows.
- [RFC 9728 §7.7](https://www.rfc-editor.org/rfc/rfc9728.html#section-7.7) (2026-10-02): a client fetching authorization-server metadata on a resource server's say-so is an SSRF risk, and clients SHOULD take precautions such as blocking internal address ranges. This is F-02's mechanism as the standard describes it; the paragraph does not address redirects.
- [PortSwigger Web Security Academy, Blind SSRF](https://portswigger.net/web-security/ssrf/blind) (2026-10-03): blind SSRF is a request the application can be made to send whose response is not returned to the attacker, with typically lower impact than full SSRF. This is the sense in which the F-01 and F-02 rows say "blind".
- [NVD developers, Start Here](https://nvd.nist.gov/developers/start-here) (2026-10-02): five requests per rolling 30-second window without an API key, with a recommendation to pause between requests. This is why `--live` spaces its calls.
- [CVE Program Terms of Use](https://www.cve.org/Legal/TermsOfUse) and the [SPDX record of that licence, cve-tou](https://github.com/spdx/license-list-data/blob/main/text/cve-tou.txt) (2026-10-03): copies of CVE records must carry MITRE's copyright designation and the licence. This is why the notice below reproduces it.

## Source data and terms

The files under `cve-evidence/` are saved copies of public registry API responses, retrieved on 2026-10-02 and re-indented for readability; their content is otherwise unchanged. They are third-party material. The CC0 dedication that covers the rest of this site does not apply to them. The same notice is saved beside the files as [NOTICE.txt](cve-evidence/NOTICE.txt).

- **CVE Records** (from `cveawg.mitre.org`): Copyright © 1999-2026, The MITRE Corporation. Use is subject to the [CVE Program Terms of Use](https://www.cve.org/Legal/TermsOfUse), which permit copying and redistribution provided MITRE's copyright designation and that licence accompany each copy. The licence text is reproduced below.
- **NVD API responses** (from `services.nvd.nist.gov`): This product uses the NVD API but is not endorsed or certified by the NVD.
- **OSV API responses** (from `api.osv.dev`): OSV.dev's automated conversions of NVD/CVE data. OSV's documentation states no separate licence for these records, so the CVE and NVD terms above are shown with them as well.

The licence text, reproduced as those terms require:

> CVE Usage: MITRE hereby grants you a perpetual, worldwide, non-exclusive, no-charge, royalty-free, irrevocable copyright license to reproduce, prepare derivative works of, publicly display, publicly perform, sublicense, and distribute Common Vulnerabilities and Exposures (CVE®). Any copy you make for such purposes is authorized provided that you reproduce MITRE's copyright designation and this license in any such copy.
>
> DISCLAIMERS
>
> ALL DOCUMENTS AND THE INFORMATION CONTAINED THEREIN PROVIDED BY MITRE ARE PROVIDED ON AN "AS IS" BASIS AND THE CONTRIBUTOR, THE ORGANIZATION HE/SHE REPRESENTS OR IS SPONSORED BY (IF ANY), THE MITRE CORPORATION, ITS BOARD OF TRUSTEES, OFFICERS, AGENTS, AND EMPLOYEES, DISCLAIM ALL WARRANTIES, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO ANY WARRANTY THAT THE USE OF THE INFORMATION THEREIN WILL NOT INFRINGE ANY RIGHTS OR ANY IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE.

## Validation and limits

`python tools/validate_cve_evidence.py` checks every ID-first `F-<number>` finding table in the corpus against a required evidence manifest. It rejects missing snapshots, wrong record IDs, unpublished CVEs, ambiguous finding references, moved or missing CVEs, stale score tables, and unreviewed inclusive-end/fixed-version conflicts. The build validator and pytest run this offline.

`python tools/validate_cve_evidence.py --live` re-fetches only fixed registry endpoints and fails on changed records or network errors. Requests are spaced two seconds apart, which keeps consecutive NVD calls about six seconds apart; NVD allows five unauthenticated requests per rolling 30 seconds. It never follows researcher URLs, redirects, or instructions inside fetched data. `--refresh` explicitly replaces snapshots after all requests for a bundle succeed; it does not rewrite advisory prose or choose severity. Review the diff, then use `--scores <advisory-id>` to print the updated score block.

Coverage is intentionally bounded: other advisory formats still require manual primary-source review. Snapshot checks detect disagreement with captured evidence, not false statements inside that evidence. Live checks detect record changes, not every possible vendor release. The version check recognizes inclusive `through X` text versus an OSV `fixed` boundary; it is not a general version-range parser. Reference URLs with no unique finding require manual resolution, not score matching.

Private session transcripts, reporter profiling, unverified literature summaries, and workflow deliberations are not published here. The original local research file remains ignored. Only rechecked public evidence and the resulting editorial decisions are included.
