EL26-67-000 · 2026-07-15 · Relentless Energy Systems LLC

RR-5D-LCFVR-GPI-ResilientResonance-Graph-Table.pdf

Read the parent filing

Read topic-matched comments in EL26-67

Responses and related views

No section-specific public response is linked for this document.

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword. This transcription includes OCR of scanned material; consult the original for exact wording.

Page 1

page range

5D-LCFVR tuned to GPI - Resilient Resonance Global Parameters: Nominal Inductance = 71.56 H (Dynamic JA-Core Model), Source = 60 Hz, 123.74V RMS 1.40 1.01 0.99996 PF 1.38 1.00 RMS Current Ratio @ Load 1.36 1.34 1.35728x GR 0.98 Power Factor (PF) @ Source 1.32 - 0.96 1.30 -20% - RMS Current Ratio @…
Read this passage