EL26-67: the filed comments

These passages match a topic and a request or argument in the same sentence. A filing can quote another party. Read its page before attributing a position.

Connecting load and generation

Individual No Affiliation

EL26-67-000 · 2026-07-09

PJM Should Address Maximum Net Withdrawal as Part of Any Framework for Generation Serving Electrically Proximate or Large Co-Located Load. PDF p. 3

Cost allocation

MAVEN SOLUTIONS

EL26-67-000 · 2026-07-08

The Commission's five reform categories, addressed with the specific reforms recommended in Section VII, would materially strengthen PJM's tariff posture on cost causation, transparency, co-location governance, transmission service class design, and generation study reciprocity. PDF p. 13

MAVEN SOLUTIONS

EL26-67-000 · 2026-07-08

The Commission's five reform categories, addressed with the specific reforms recommended in Section VII, would materially strengthen PJM's tariff posture on cost causation, transparency, co-location governance, transmission service class design, and generation study reciprocity. PDF p. 13

Global Capacity Alliance

EL26-67-000 · 2026-07-08

Doing so ensures that the integration of large, flexible loads supports grid visibility, protects regional ratepayers, and unlocks privately funded reliability infrastructure. PDF p. 3

Reliability and curtailment

Global Capacity Alliance

EL26-67-000 · 2026-07-08

Should RTOs wish to pursue FTM-Netting, stakeholder engagement can focus on 3 key areas: • Scarcity Yield & Coordinated Curtailment: Standardizing the technical parameters and response time for a facility to execute a controlled curtailment to onsite backup generation. PDF p. 3

NATIONAL CONGRESS OF AMERICAN INDIANS

EL26-67-000 · 2026-10-26

●​ Grid reliability and impact assessment: The FERC must require rigorous, independent, and conflict-free assessments of how these facilities impact regional resource adequacy and transmission congestion, ensuring transparent economic analysis of the true costs required to support their operations. PDF p. 2