EL26-67-000 · 2026-07-28 · Wabash Valley Power Association, Inc.

Wabash Valley Power Association, Inc. submits Request for Issuance of an Errata to the 06/18/2026 Order Instituting Proceedings Under Section 206 of the Federal Power Act

Read topic-matched comments in EL26-67

Topics in the text: Connecting load and generation

Responses and related views

No section-specific public response is linked for this document.

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text · Topic match: Connecting load and generation

REQUEST FOR ISSUANCE OF AN ERRATA To the Commission: On June 18, 2026, the Commission issued its “Order Instituting Proceeding Under Section 206 of the Federal Power Act” in this above captioned proceeding.1 In its Order, the Commission found that PJM Interconnection, L.L.C.’s (“PJM”) existing Open…
Read this passage Filed comments: Connecting load and generation

CERTIFICATE OF SERVICE

printed heading

Fetty
Read this passage