ER27-484-000 · 2026-11-13 · Electric Power Supply Association
EPSA supports ISO-NE’s request for a 24-day comment period
PDF page 1
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
)
.,
)
ISO New England, Inc, et al.
)
Docket No. ER27-484-000
)
)
ANSWER OF THE ELECTRIC POWER SUPPLY ASSOCIATION
IN SUPPORT OF ISO-NE REQUEST FOR EXTENDED COMMENT PERIOD
Pursuant to the November 13, 2026 filing1 from ISO New England, Inc. (“ISO-NE” or “the ISO”), the New England Power Pool Participants Committee, the Participating Transmission Owners Administrative Committee, on behalf of the Participating Transmission Owners (“PTOs”) and a number of PTOs2 in the above-captioned docket, the Electric Power Supply Association (“EPSA”)3 respectfully submits this answer in support of the ISO-NE’s request for a short extension of the comment period on the ISO’s proposed Tariff revisions related to the integration of large loads to its
1 ISO New England, Inc. et al., Revisions Related to the Integration of Large Loads to the Transmission System, Docket No. ER27-484-000 (November 13, 2026). 2 These PTOs include: Central Maine Power Company; Connecticut Transmission Municipal Electric Energy Cooperative; Eversource Energy Service Company on behalf of The Connecticut Light and Power Company, Public Service Company of New Hampshire and NSTAR Electric Company; Fitchburg Gas and Electric Light Company; Green Mountain Power Corporation; The Narragansett Electric Company d/b/a Rhode Island Energy; New England Power Company d/b/a National Grid; New Hampshire Transmission, LLC; The United Illuminating Company; Unitil Energy Systems, Inc.; Vermont Electric Cooperative, Inc.; Vermont Transco LLC; and Versant Power.3 EPSA is the national trade association representing competitive power suppliers in the U.S. EPSA members provide reliable and competitively priced electricity from environmentally responsible facilities using a diverse mix of fuels and technologies. EPSA seeks to bring the benefits of competition to all power customers. This pleading represents the position of EPSA as an organization but not necessarily the views of any particular member with respect to any issue. EPSA filed a doc-less motion to intervene in this proceeding on November 13, 2026.
PDF page 2
2
transmission system. EPSA respectfully requests that the Commission extend the deadline for submitting comments to December 7, 2026, as requested by ISO-NE.
I. ANSWER
As noted by the ISO, given the breadth of this filing with Tariff Revisions, as well as the upcoming holiday, an extension of the comment period in the instant docket to 24 days, or until December 7, 2026, would help to ensure that interested parties have ample time to review and develop comments on the filing, particularly multiple member organizations like trade associations and NGOs (“Non-Governmental Organizations”).4 EPSA therefore agrees with ISO-NE and respectfully requests that the Commission grant this request. The short extension would have the added benefit of aligning the comment period with the other expected large loads filings that will be filed with the Commission on November 16, which would allow stakeholders to take a holistic look at these critical proceedings, benefiting the respective records in these multiple proceedings.
II. CONCLUSION
WHEREFORE, EPSA respectfully requests that the Commission grant ISO-NE’s request to extend the comment period in this proceeding, so that comments would be due on December 7, 2026.
4 ISO New England, Inc. et al, Revisions Related to the Integration of Large Loads to the Transmission System, Docket No. ER27-484-000, (November 13, 2026), p. 93.
PDF page 3
3
Respectfully submitted,
ELECTRIC POWER SUPPLY ASSOCIATION
By:
_/s/ Nancy Bagot__________________
Nancy Bagot
Senior Vice President
Bill Zuretti
Director, Regulatory Affairs & Counsel
Electric Power Supply Association
1401 New York Ave, NW, Suite 950
Washington, DC 20005
(202) 628-8200
NancyB@epsa.org
Dated: November 13, 2026
PDF page 4
CERTIFICATE OF SERVICE
I hereby certify that I have this day served the foregoing document on each person designated on the official service list compiled by the Secretary of the Federal Energy Regulatory Commission in this proceeding.
Dated at Washington, DC, this 13th day of November, 2026.
/s/ Bill Zuretti
Bill Zuretti