The filing record

The June orders, the responses and the documents behind them.

794 archived originals · 718 PDFs · Download the inventory

Who said what: testimony, filings and reporting by issue · Coverage and missing originals

Inside PJM’s filings

Browse the record

2026 FERC reliability technical conference: integrating large loads

ATC large-load planning revisions (Attachment FF-ATCLLC)

CAISO and California transmission owners’ large-load tariff revisions

CAISO filings

CAISO show cause proceeding (E-10)

Congressional testimony

Duke Energy Carolinas network service agreement and large-load shortfall payments

Exelon complaint seeking a prompt PJM capacity auction

ISO-NE filings

ISO-NE show cause proceeding (E-11)

June 18 orders

MISO Large Load Addition Resource Study (LARS)

MISO filings

MISO interconnection reliability requirements for large loads

MISO large-load tariff revisions

MISO show cause proceeding (E-8)

MISO zero-injection generator interconnection agreement

NYISO and New York transmission owners’ large-load tariff revisions

NYISO filings

NYISO show cause proceeding (E-12)

PJM Large Load definition, Registry and Interim Resource Adequacy Service

PJM Reliability Backstop Procurement

PJM Transmission Owners’ large-load tariff revisions

PJM co-location compliance

PJM filings

PJM governance and stakeholder reform vote

PJM show cause proceeding (E-7)

PJM stakeholder record

PJM, NYISO, MISO, CAISO, ISO-NE filings

PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings

Rehearing of FERC's PJM Reliability Backstop Procurement order

SPP conditional large-load service credits (CHILLS)

SPP filings

SPP large-load tariff revisions

SPP show cause proceeding (E-9)

SPP, CAISO filings

Six large-load show-cause orders, one per RTO/ISO