ER26-3380-000 · 2026-08-11 · East Kentucky Power Cooperative

Comments of East Kentucky Power Cooperative re PJM Interconnection’s recent proposals to FERC for addressing capacity needs in the short and long terms

Text extracted from the eLibrary original (SHA-256 2b9c02ae6a4f01e2…). Download the original from the official source.

Read topic-matched comments in ER26-3380

Topics in the text: Cost allocation

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Pages 1 to 3

page range · Topic match: Cost allocation

The result is cost volatility and cost shifting for regulated states like Kentucky that have responsibly maintained reliable generating resources to match our needs.
Read this passage Filed comments: Cost allocation