ER27-535-000 · 2026-11-16 · Trans Bay Cable LLC

Appendix A - Trans Bay Revised Tariff CLEAN_2

Text extracted from the eLibrary original (SHA-256 c6b3f9b7d4894b6a…). Download the original from the official source.

Contents · 2 sections
  1. Attachment A - Cost Recovery Agreement p. 8
  2. ATTACHMENT A p. 50

Read the parent filing

Topics in the text: Registry access · Connecting load and generation · Reliability and curtailment

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text

APPENDIX A Clean Version of the Revised Sections of the Trans Bay Tariff Company: Trans Bay Cable LLC Program: FERC FPA Electric Tariff Tariff Title: Transmission Owner Tariff Proposed Effective Date: 2/16/2027 Tariff Record Description: Transmission Owner Tariff Tariff Record Title: Trans Bay…
Read this passage

TABLE OF CONTENTS

printed heading

Large Load Partial Interim Service and FILI Service Requests.. .................. 32 10.19.
Read this passage

Attachment A - Cost Recovery Agreement

printed heading · Topic match: Connecting load and generation

If the applicant fails to timely comply with such Interconnection requirements, such applicant shall pay the reasonable costs of revising the System Impact Studies for other applicants that have established a new queue position due to the applicant either withdrawing its Interconnection Application…
Read this passage

ATTACHMENT A

printed heading · Topic match: Registry access

ARTICLE 5: [RESERVED] ARTICLE 6: [RESERVED] ARTICLE 7: CONFIDENTIALITY 7.1 Confidentiality During the term of this Agreement and for a period of five (5) years after any termination or expiration of this Agreement, each Party shall hold in confidence and not disclose to any person any Confidential…