Order Instituting Proceeding Under Section 206 etc. re ISO New England Inc. et al
Text extracted from the eLibrary original (SHA-256 d3c4acc3cab0361d…). Download the original from the official source.
Contents · 17 sections
- I. Background 6.
- A. Growth of Large and Co-Located Loads and ANOPR 6.
- B. Recent Proceedings Addressing Large and Co-Located Loads 12.
- II. ISO-NE’s Existing Processes 20.
- A. Existing Tariff Processes 20.
- B. Recent Stakeholder Proceedings in ISO-NE 30.
- III. Discussion 32.
- A. Transmission Service to Eligible Customers on Behalf of Large Loads 38.
- B. Cost Shifting Risk Among Transmission Customers 64.
- C. Co-Location Arrangements and Load with Behind the Meter Generation 83.
- D. Extending New Transmission Services to Eligible Customers Taking Service on Behalf of Flexible Large Loads 101.
- E. Interconnection Customers Serving Electrically Proximate Large Load and Co-Located Load 104.
- F. Informational Report 118.
- IV. Briefing Questions 120.
- Background
- Discussion
- Conclusion
Topics in the text: Connecting load and generation · Cost allocation · Filing procedure
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text
195 FERC ¶ 61,215 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Laura V.Read this passage
I. Background 6.
printed heading
I.Read this passage
A. Growth of Large and Co-Located Loads and ANOPR 6.
printed heading
Growth of Large and Co-Located Loads and ANOPR 6.Read this passage
B. Recent Proceedings Addressing Large and Co-Located Loads 12.
printed heading
Recent Proceedings Addressing Large and Co-Located Loads 12. 1.Read this passage
II. ISO-NE’s Existing Processes 20.
printed heading
II.Read this passage
A. Existing Tariff Processes 20.
printed heading
A.Read this passage
B. Recent Stakeholder Proceedings in ISO-NE 30.
printed heading
B.Read this passage
III. Discussion 32.
printed heading
III.Read this passage
A. Transmission Service to Eligible Customers on Behalf of Large Loads 38.
printed heading
Transmission Service to Eligible Customers on Behalf of Large Loads 38. 1.Read this passage
B. Cost Shifting Risk Among Transmission Customers 64.
printed heading · Topic match: Cost allocation
Cost Shifting Risk Among Transmission Customers 64. 1.Read this passage
C. Co-Location Arrangements and Load with Behind the Meter Generation 83.
printed heading
Co-Location Arrangements and Load with Behind the Meter Generation 83. 1.Read this passage
D. Extending New Transmission Services to Eligible Customers Taking Service on Behalf of Flexible Large Loads 101.
printed heading
Extending New Transmission Services to Eligible Customers Taking Service on Behalf of Flexible Large Loads 101.Read this passage
E. Interconnection Customers Serving Electrically Proximate Large Load and Co-Located Load 104.
printed heading · Topic match: Connecting load and generation
Interconnection Customers Serving Electrically Proximate Large Load and Co-Located Load 104.Read this passage
F. Informational Report 118.
printed heading
F.Read this passage
IV. Briefing Questions 120.
printed heading · Topic match: Cost allocation
Over the past year, the Commission has taken action in numerous dockets[fn:2] to address issues related to (a) unprecedented increases in requests for transmission service to serve large loads[fn:3] and (b) growing interest in the co-location of loads with generating facilities (co-location…Read this passage
Background
printed heading · Topic match: Connecting load and generation
PJM Co-Location Proceedings On February 20, 2025, the Commission initiated a show cause proceeding against PJM and the PJM transmission owners regarding the lack of tariff provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to…Read this passage
Discussion
printed heading · Topic match: Connecting load and generation
Several commenters discuss the risk of cost shifting among transmission customers that could result from transmission service requests by Eligible Customers on behalf of large loads.[fn:181] Commenters also argue that retail-level large load tariffs do not protect wholesale transmission customers…Read this passage
Conclusion
printed heading · Topic match: Cost allocation
While this is a long journey, even so, we must continue to move at breakneck pace to win the AI race.Read this passage
Footnotes
Word notes · Topic match: Connecting load and generation
P 32 (explaining that SPP will grant HILLGA customers a new type of interconnection service, load limited resource interconnection service, which grants limited interconnection service solely to serve the associated HILL). [fn:61] Id.Read this passage