Motion for Leave to Answer and Limited Answer of FirstEnergy Service Company to the Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C.…
Text extracted from the eLibrary original (SHA-256 166116e587d028a9…). Download the original from the official source.
Contents · 2 sections
Read topic-matched comments in ER26-3380
Topics in the text: Reliability and curtailment
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, L.L.C. ) Docket No.Read this passage
I. Answer
printed heading · Topic match: Reliability and curtailment
FirstEnergy respectfully requests waiver of Rule 213(a)(2), 18 C.F.R. § 385.213(a)(2), to permit it to file this Limited Answer to the September 10 PJM Answer.Read this passage Filed comments: Reliability and curtailment
II. Conclusion
printed heading
Conclusion For the foregoing reasons and the reasons explained in the August 21 FirstEnergy Comments and Protest, FirstEnergy respectfully requests that the Commission grant the relief requested herein.Read this passage
CERTIFICATE OF SERVICE
printed heading
Dated at Washington, DC this 23rd day of September, 2026. /s/ Deiman Flores Deiman Flores Davis Wright Tremaine LLP 1301 K Street, NW Suite 500 East Washington, DC 20005 212.402.4037 deimanflores@dwt.comRead this passage