ER26-3380-000 · 2026-09-23 · FirstEnergy Service Company
Motion for Leave to Answer and Limited Answer of FirstEnergy Service Company to the Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C.…
PDF page 1
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
PJM Interconnection, L.L.C.
)
Docket No. ER26-3380-000
MOTION FOR LEAVE TO ANSWER AND LIMITED ANSWER OF
FIRSTENERGY SERVICE COMPANY
Pursuant to Rules 212 and 213 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission (“FERC” or the “Commission”),1 FirstEnergy Service Company
(“FirstEnergy”) respectfully files this Limited Answer in response to the answer to comments and protests submitted by PJM Interconnection, L.L.C. (“PJM”) on September 10, 2026 (the
“September 10 PJM Answer”), in this proceeding on PJM’s proposal to establish a Reliability Backstop Procurement (“RBP”) mechanism.2
I. Answer
Although the September 10 PJM Answer purports to respond to the points made in the
August 21 FirstEnergy Comments and Protest,3 PJM fails to advance facts or law that satisfy its burden of proof under section 205 of the Federal Power Act (the “FPA”) to demonstrate that the July 31 RBP Proposal is just and reasonable.4 As explained in the August 21 FirstEnergy
1 18 C.F.R. §§ 385.212, 385.213.2 PJM Reliability Backstop Procurement to Address Resource Adequacy Concerns Stemming from Large Loads, Docket No. ER26-3380-000 (the “July 31 RBP Proposal”). On August 20, 2026 FirstEnergy filed, as agent for its franchised public utility and transmission-owning public utility affiliates, a motion to intervene in this proceeding. On August 21, 2026, FirstEnergy filed comments and a protest regarding the July 31 RBP Proposal (the “August 21 FirstEnergy Comments and Protest”). FirstEnergy respectfully requests waiver of Rule 213(a)(2), 18 C.F.R. § 385.213(a)(2), to permit it to file this Limited Answer to the September 10 PJM Answer. Good cause for the waiver exists because this limited answer will aid the Commission in understanding the issues in the proceeding, inform the Commission in its decision-making process, and help to ensure a complete and accurate record in the case. See, e.g., PJM Interconnection, L.L.C., 187 FERC ¶ 61,173, at P 25 (2024); Constellation Mystic Power, LLC, 185 FERC ¶ 61,016, at P 14 (2023); ISO New Eng. Inc., 175 FERC ¶ 61,172, at P 15 (2021).3 See September 10 PJM Answer at 59, 63-67, 74-76, 79-82, 88, 89 n.271.4 See August 21 FirstEnergy Comments and Protest at 1-2.
PDF page 2
2
Comments and Protest, there are a number of ways in which PJM has not met its burden of proof.5 The September 10 PJM Answer does not repair those defects. Among other deficiencies, PJM’s answer fails to explain or address how its proposal could possibly be just and reasonable if it does not actually allocate RBP-related costs to the new data centers driving the need for such capacity, in accordance with the NEDC/PJM Governors’ Statement of Principles that underlies the RBP proposal.6
Accordingly, FirstEnergy reiterates that the Commission grant the relief requested in the August 21 FirstEnergy Comments and Protest: the Commission should reject the July 31 RBP Proposal, institute a proceeding under section 206 of the FPA, and establish settlement proceedings.7 Alternatively, even if the Commission were to accept the July 31 RBP Proposal for filing, such acceptance should be conditioned on PJM submitting a subsequent compliance filing that addresses the issues raised in the August 21 FirstEnergy Comments and Protest.
5 Id. at 2-22.6 September 10 PJM Answer at 63-65 (arguing that it is “fallacious” to suggest that a just and reasonable cost allocation must be targeted to the new data centers driving the need for the RBP).7 August 21 FirstEnergy Comments and Protest at 22.
PDF page 3
3
II. Conclusion
For the foregoing reasons and the reasons explained in the August 21 FirstEnergy Comments and Protest, FirstEnergy respectfully requests that the Commission grant the relief requested herein.
Respectfully submitted,
/s/ Michael Kunselman
Morgan E. Parke
Michael Kunselman
Vice President, Associate General Counsel
Bradley Miliauskas
FirstEnergy Service Company
Davis Wright Tremaine LLP
341 White Pond Drive
1301 K Street, NW
Akron, OH 44320
Suite 500 East
Tel: (330) 620-9585
Washington, DC 20005
mparke@firstenergycorp.com
Tel: (202) 973-4295
michaelkunselman@dwt.com
bradleymiliauskas@dwt.com
September 23, 2026
PDF page 4
CERTIFICATE OF SERVICE
I hereby certify that I have this day served the foregoing documents upon each person designated on the official service lists compiled by the Secretary in the above-captioned proceeding.
Dated at Washington, DC this 23rd day of September, 2026.
/s/ Deiman Flores
Deiman Flores
Davis Wright Tremaine LLP
1301 K Street, NW
Suite 500 East
Washington, DC 20005
212.402.4037
deimanflores@dwt.com