Responsive Brief of Industrial Customer Organizations and Amtrak
Text extracted from the eLibrary original (SHA-256 57aa503159d62ff0…). Download the original from the official source.
Contents · 20 sections
- I. EXECUTIVE SUMMARY
- II. BACKGROUND
- III. THE INDUSTRIALS/AMTRAK
- IV. ARGUMENTS
- B. For Co-Located Loads for which retail netting is not an option, Non-Firm CDS
- V. CONCLUSION & REQUEST FOR RELIEF
- II. BACKGROUND ON THE USE OF COGENERATION FACILITIES BY
- III. COMMERCIAL, INDUSTRIAL AND INSTITUTIONAL CUSTOMERS
- IV. FOR TRADITIONAL LARGE LOADS SERVED BY COGENERATION
- V. FIRM CONTRACT DEMAND TRANSMISSION SERVICE AND
- VI. PJM’S PROPOSAL WITH RESPECT TO ALLOWING EXISTING
- VII. PJM’S PROPOSED 50 MW AND SMALLER LIMITATION FOR
- I. INTRODUCTION
- II. BACKGROUND ON THE USE OF COGENERATION FACILITIES BY
- III. COMMERCIAL, INDUSTRIAL AND INSTITUTIONAL CUSTOMERS USING
- IV. FOR TRADITIONAL LARGE LOADS SERVED BY COGENERATION
- V. FIRM CONTRACT DEMAND TRANSMISSION SERVICE AND NON-FIRM
- VI. PJM’S PROPOSAL WITH RESPECT TO ALLOWING EXISTING CERTIFIED
- VII. PJM’S PROPOSED 50 MW AND SMALLER LIMITATION FOR NON-
- VIII. CONCLUSION
Read topic-matched comments in EL25-49
Topics in the text: Cost allocation · Reliability and curtailment · Connecting load and generation
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text · Topic match: Filing procedure
EL25-49-000, EL25-49-001, AD24- 11-000, EL25-20-000 (“Consolidated Dockets”) (Dec. 18, 2025) (“Order”). 2 Notice of Extension of Time, Docket Nos.Read this passage Filed comments: Filing procedure
I. EXECUTIVE SUMMARY
printed heading · Topic match: Reliability and curtailment
While specific eligibility for retail netting is under consideration in the BTMG Compliance Docket, no firm cost- based back-up service has been proposed in the instant proceeding. 3) The Commission should incorporate incentives for Co-Located Load to bring new generation, with appropriate…Read this passage Filed comments: Reliability and curtailment
II. BACKGROUND
printed heading · Topic match: Connecting load and generation
BACKGROUND On December 18, 2025, the Commission issued the Order, finding that the PJM Tariff is unjust and unreasonable due to the lack of specificity for the rates, terms, and conditions that apply to Co-Located Load and directing PJM to make several compliance and informational filings.Read this passage Filed comments: Connecting load and generation
III. THE INDUSTRIALS/AMTRAK
printed heading · Topic match: Reliability and curtailment
In contrast to typical computational and data center load, industrial customers: (a) produce a physical product on-site; (b) typically cannot shift load to other facilities; (c) often must continue to operate for safety and environmental compliance reasons; (d) frequently have generation and load…Read this passage Filed comments: Reliability and curtailment
IV. ARGUMENTS
printed heading · Topic match: Cost allocation
Under PURPA, QFs fall into two broad categories: “qualifying small power production facilities,” which can be sized up to 80 MW, and “qualifying cogeneration facilities,” which have no size limit.26 Cogeneration QFs must achieve certain efficiency standards and are highly efficient in their use of…Read this passage Filed comments: Cost allocation
B. For Co-Located Loads for which retail netting is not an option, Non-Firm CDS
printed heading · Topic match: Cost allocation
A durable solution must provide clear direction on cost allocation while respecting federal-state jurisdictional distinctions.Read this passage Filed comments: Cost allocation
V. CONCLUSION & REQUEST FOR RELIEF
printed heading
CONCLUSION & REQUEST FOR RELIEF The Industrials/Amtrak respectfully request that the Commission ensure: (1) retail customers with on-site generation have access to cost-based back-up service; (2) the new transmission services are designed to incentivize development of new generation and to avoid…Read this passage
CERTIFICATE OF SERVICE
printed heading
Dated this 25th day of March, 2026. /s/ Matthew L.Read this passage
Table of Contents
printed heading
Table of Contents I.Read this passage
II. BACKGROUND ON THE USE OF COGENERATION FACILITIES BY
printed heading
II.Read this passage
III. COMMERCIAL, INDUSTRIAL AND INSTITUTIONAL CUSTOMERS
printed heading
III.Read this passage
IV. FOR TRADITIONAL LARGE LOADS SERVED BY COGENERATION
printed heading
IV.Read this passage
V. FIRM CONTRACT DEMAND TRANSMISSION SERVICE AND
printed heading
V.Read this passage
VI. PJM’S PROPOSAL WITH RESPECT TO ALLOWING EXISTING
printed heading
VI.Read this passage
VII. PJM’S PROPOSED 50 MW AND SMALLER LIMITATION FOR
printed heading · Topic match: Reliability and curtailment
PJMICC PRA PJM Industrial Customer Coalition Planning Resource Auction PURPA Public Utility Regulatory Policies Act of 1978 RAA Reliability Assurance Agreement RAR Resource Adequacy Requirements SMR Small Modular Reactors Exhibit No.Read this passage Filed comments: Reliability and curtailment
I. INTRODUCTION
printed heading · Topic match: Cost allocation
For at least twenty-six (26) years, I have also participated in the Midcontinent Independent System Operator, Inc. (“MISO”) stakeholder process on behalf of several large end-use customer groups.1 This has included, but not been limited to, providing extensive feedback to MISO and other MISO…Read this passage Filed comments: Cost allocation
II. BACKGROUND ON THE USE OF COGENERATION FACILITIES BY
printed heading · Topic match: Cost allocation
This is because the thermal energy needs of the retail customer typically dictate how much electric power must be produced by the Cogeneration Facility.Read this passage Filed comments: Cost allocation
III. COMMERCIAL, INDUSTRIAL AND INSTITUTIONAL CUSTOMERS USING
printed heading · Topic match: Cost allocation
Due to these differences, from a cost causation perspective, very large computational load co-located behind the meter of generation facilities are more akin to wholesale customer load served by utility behind the meter generation21 than traditional large commercial, industrial, and institutional…Read this passage Filed comments: Cost allocation
IV. FOR TRADITIONAL LARGE LOADS SERVED BY COGENERATION
printed heading · Topic match: Cost allocation
FOR TRADITIONAL LARGE LOADS SERVED BY COGENERATION FACILITIES, PJM’S CURRENT RETAIL BEHIND THE METER GENERATION PROVISIONS ARE CONSISTENT WITH COST CAUSATION AND FERC’S OWN BACKUP AND MAINTENANCE POWER RULES FOR QUALIFYING FACILITIES 27.Read this passage Filed comments: Cost allocation
V. FIRM CONTRACT DEMAND TRANSMISSION SERVICE AND NON-FIRM
printed heading · Topic match: Connecting load and generation
EL25-49-000, PJM in its February 23, 2026 initial brief in that paper hearing (“PJM Paper Hearing Initial Brief”) in part proposed: The entire gross load of the Co-Located Load be covered by a combination of Firm Contract Demand Transmission Service and Non- Firm Contract Demand Transmission…Read this passage Filed comments: Connecting load and generation
VI. PJM’S PROPOSAL WITH RESPECT TO ALLOWING EXISTING CERTIFIED
printed heading · Topic match: Connecting load and generation
It is important to note that providing legacy retail behind-the-meter generation netting treatment for all Qualifying Facilities would not provide a “back door” for very large computational loads to bypass the Co-Located Load provisions of FERC’s December 18, 2025, Show Cause Order in Docket No.Read this passage Filed comments: Connecting load and generation
VII. PJM’S PROPOSED 50 MW AND SMALLER LIMITATION FOR NON-
printed heading
EL25-49-000, et al.48 PJM also notes that, given these retail behind the meter generation arrangements, like those for PURPA Qualifying Facilities, have been in place and netted against Network Loads within PJM without known operational issues to date, it proposes to allow such arrangements, which…Read this passage
VIII. CONCLUSION
printed heading · Topic match: Cost allocation
IA-1 Attachment 3 Page 3 of 3 ICC Docket Nos. 25-0677 & 25-0679 (Cons.) Commonwealth Edison Company’s Response to NRG Energy, Inc. (“NRG”) Information Requests NRG-ComEd 1.01-NRG-ComEd 1.20 Date Received: August 22, 2025 Date Served: August 29, 2025 REQUEST NO.Read this passage Filed comments: Cost allocation