Pre-filed Statement of Glen Thomas, President of PJM Power Providers Group, for the PJM Governance and Stakeholder Reforms Technical Conference
Text extracted from the eLibrary original (SHA-256 8e91602a562e0ff0…). Download the original from the official source.
Contents · 3 sections
Read topic-matched comments in AD26-7
Topics in the text: Connecting load and generation
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text
AD26-7-000, P3 urges FERC to anchor all discussions in a foundational premise: PJM’s primary mandate must remain the operation of robust, competitive wholesale markets that ensure reliability at the lowest reasonable cost.Read this passage
I. Core Principles for PJM Governance
printed heading · Topic match: Connecting load and generation
While the input of PJM members, state and others, is vital to its success, PJM’s Board must remain fiercely independent and focused on 1 Combined, P3 members own over 108,000 MWs of generation assets and produce enough power to supply over 63 million homes in the PJM region covering 13 states and…Read this passage
II. Responses to Specific Panel Areas
printed heading
At the end of the day, the desire for an open, transparent and inclusive stakeholder process must be balanced with the need for efficient resolution of pressing matters.Read this passage
III. Conclusion
printed heading
Conclusion The technical conference on July 23, 2026, should focus on practical, operational efficiency, not structural upheavals that inject political volatility into a market that requires long-term investment signals.Read this passage