AD26-7-000 · 2026-07-15 · PJM Power Providers Group
Pre-filed Statement of Glen Thomas, President of PJM Power Providers Group, for the PJM Governance and Stakeholder Reforms Technical Conference
PDF page 1
PRE-CONFERENCE COMMENTS OF THE PJM POWER PROVIDERS
GROUP (P3)
The PJM Power Providers Group (P3) appreciates the opportunity to submit these pre- conference comments in response to the Commission’s June 5, 2026, Supplemental Notice of Commission-Led Technical Conference. P3 is a non-profit organization dedicated to promoting properly designed and well-functioning markets in the PJM region.1 P3’s members own and operate diverse generation portfolios that are vital to maintaining reliability for the 65 million consumers within the PJM footprint.
As the Commission explores actionable structural and procedural reforms under Docket No. AD26-7-000, P3 urges FERC to anchor all discussions in a foundational premise: PJM’s primary mandate must remain the operation of robust, competitive wholesale markets that ensure reliability at the lowest reasonable cost. While the PJM footprint faces unprecedented operational, resource transitions, and load-growth challenges, governance reforms must not become a vehicle for compromising RTO independence or upending the stakeholder model that has historically delivered for the region.
P3 offers the following high-level principles and specific responses to the Commission’s questions to guide the upcoming technical conference.
I. Core Principles for PJM Governance
1. RTO Board Independence PJM sits at the crossroads of 13 states and the District of Columbia—jurisdictions with fundamentally divergent energy policies, resource portfolios, and political priorities. While the input of PJM members, state and others, is vital to its success, PJM’s Board must remain fiercely independent and focused on
1 Combined, P3 members own over 108,000 MWs of generation assets and produce enough power to supply over 63 million homes in the PJM region covering 13 states and the District of Columbia. For more information on P3, visit www.p3powergroup.com. The comments contained herein represent the position of P3 as an organization, but not necessarily the views of any particular member.
PDF page 2
its core mission of running an interstate grid and power market that are properly designed and well-functioning.
2. Principled FERC Oversight – Combining an independent RTO Board that acts in the best interests of the organization with regulatory oversight by an independent regulator who is similarly dedicated to effective oversight of the markets are the bedrock of any governance structure. If the PJM Board and FERC are fulfilling their roles properly, taking appropriate feedback, but ultimately making principled decisions in the best interest of the market, the RTO will run well and meet its core objectives.
3. Any Changes Should Not Undermine PJM’s Investibility Thesis – At the end of the day, PJM’s success hinges on its ability to attract private capital to its markets and any governance reforms should not undermine or weaken PJM’s aspiration to be a desirable destination for merchant capital.
4. Respect the FPA Section 205 Balance of Filing Rights -The division of Federal Power Act (FPA) Section 205 filing rights is a core feature of the PJM region. Suggestions to unilaterally broaden the PJM Board’s or any other stakeholder’s filing rights over matters traditionally reserved for Transmission Owners or the Members Committee risk destabilizing the careful balance that stives to incentivize capital investment and market participation. In addition, filing rights under section 205 are available only to entities providing jurisdictional services – wholesale suppliers of capacity, energy and ancillary services and transmission owners – and these entities cannot be forced to concede any rights under section 205 involuntarily. With so many pressing issues in PJM right now, PJM leadership and stakeholders should not be distracted by a conversation about 205 filing rights that will certainly be controversial and litigated.
5. Enhance Process Efficiency Without Diluting Sector Voice - Delays in proactively addressing significant market design issues (such as capacity market rules, reserve market pricing, and interconnection queue challenges) are often a symptom of
PDF page 3
fractured stakeholder consensus, not inherently a failure of the governance structure, which can result in over-reliance on fast-track processes that shortchange thoughtful deliberation and stakeholder impact. P3 supports process reforms to allow PJM and its stakeholders to proactively address these issues in a way that balances opportunities for thoughtful stakeholder feedback and collaboration with timely action. P3 suggests that these issues are best managed by PJM stakeholders who are familiar with the process and its challenges.
6. Resist Efforts to Change PJM’s Core Mission – PJM core mission is to reliably run an interstate grid while optimizing the value to consumers by dispatching the lowest costs resources to meet demand. PJM should not be diverted from this core mission to meet the political priorities of other parties – no matter what those priorities are.
II. Responses to Specific Panel Areas
Panel 1: PJM Governance Mechanics—Board Authority, States’ Role, Filing Rights, and Document Architecture
•
The Board’s Role and Unilateral Authority: The PJM Board possesses the necessary authority under the Tariff to act unilaterally when reliability or market design failures pose an imminent threat. However, unilateral Board action should remain an extraordinary tool reserved for emergency fixes or when the stakeholder process has utterly deadlocked on a federally mandated filing timeline. Expanding the Board's routine use of unilateral authority could easily erode investor confidence by introducing regulatory unpredictability. It also could lead to poorly formulated proposals to the Commission which will make the Commission’s job harder and increase the likelihood of court involvement.
•
The State Role (OPSI): P3 recognizes that the role of the states in the stakeholder process is critical to developing durable market reforms. Indeed, one would expect OPSI to be crucial as stakeholders seek to identify workable compromises. The Organization of PJM States, Inc. (OPSI) provides an effective foundation for state utility commissions to interface with PJM and its stakeholders. Moreover, through
PDF page 4
OPSI and other venues, states have unique opportunities for participation that no other stakeholders enjoy. That said, P3 is open to working with the states on enhancements to facilitate further productive engagement in PJM’s processes. Because the Board’s duty is to the regional transmission system and the wholesale market rules approved by this Commission, it is important that changes in states’ roles in PJM tariff development be undertaken with careful and thoughtful deliberation.
•
Document Architecture and Manuals: P3 is increasingly concerned about the shifting of impactful, market-altering rules out of the Open Access Transmission Tariff (OATT) and into PJM Manuals. Because Manual changes bypass FERC Section 205 review, this practice reduces transparency and limits stakeholder recourse. Actionable reform should require that any provisions substantially affecting market clearing, capacity accreditation, or seller obligations remain firmly within the Tariff or Operating Agreement. These are changes that PJM can easily address without a FERC mandate to do so.
Panel 2: PJM Stakeholder Process—Design, Transparency, and Decision-Making
•
Inclusiveness and Sector-Based Voting: PJM’s five-sector voting structure (Generation Owners, Transmission Owners, Other Suppliers, Electric Distributors, and End-Use Customers) satisfies the core principles of Order No. 719 by balancing diverse commercial interests. Generally, the voting structure provides sufficient information to the Board by which to make informed decisions that are in the best interest of the market – which should be the hallmark of any RTO governance structure. On matters that have broad stakeholder agreement, there is a path for those matters to be filed at FERC under Section 205 and stakeholders individually or collectively (and PJM) can always bring matters to FERC under Section 206.
•
Efficient Deliberations: P3 observes that from time to time the PJM stakeholder process does languish and lacks focus. Occasionally, the proliferation of low priority stakeholder efforts and PJM’s desire to hear from multiple viewpoints can distract from focus on critical issues that have more pressing timelines. At the end of the day, the desire for an open, transparent and inclusive stakeholder process
PDF page 5
must be balanced with the need for efficient resolution of pressing matters. P3 believes that this balance is best structured between PJM and its stakeholders and not mandated by the Commission.
III. Conclusion
The technical conference on July 23, 2026, should focus on practical, operational efficiency, not structural upheavals that inject political volatility into a market that requires long-term investment signals. P3 urges the Commission to focus actionable reforms on creating structured, fast-path timelines for critical issues while firmly upholding the independence of the PJM Board and the integrity of the competitive, sector-weighted stakeholder framework. Moreover, FERC’s role as the ultimate regulator of PJM cannot be understated. There is no substitute for inspired, excellent and principled regulation – which should be FERC’s goal and extends well beyond the July 23rd technical conference.