Errata to the 5/8/2025 Motion for Leave and Answer of Constellation Energy Generation, LLC
Text extracted from the eLibrary original (SHA-256 d18436d56d4cd9c4…). Download the original from the official source.
Read topic-matched comments in EL25-49
Topics in the text: Connecting load and generation · Reliability and curtailment
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text
Seth Lucia Assistant General Counsel Constellation Energy Generation, LLC 250 Massachusetts Avenue, NW Suite 760 Washington, DC 20001 Seth.Lucia@constellation.com May 9, 2025 Via eFiling Honorable Debbie-Anne A.Read this passage
CERTIFICATE OF SERVICE
printed heading · Topic match: Connecting load and generation
See Comments of Clean Air Task Force at 5-6 (filed Apr. 23, 2025) (asserting FERC jurisdiction under section 206 “[w]here, as here, the evidence demonstrates that the existing tariff provisions are inadequate, unjust, and unreasonable” “to properly plan for and 4 Second, another large group of…Read this passage Filed comments: Connecting load and generation
CONCLUSION
printed heading
CONCLUSION WHEREFORE, Constellation respectfully requests that the Commission grant leave and accept this answer and adopt its preliminary finding that the PJM Tariff is unjust and unreasonable and unduly discriminatory and preferential because it lacks clear provisions for the treatment of large…Read this passage
CERTIFICATE OF SERVICE
printed heading
CERTIFICATE OF SERVICE I hereby certify that I have on this 8th day of May, 2025, caused to be served a copy of the foregoing upon all parties on the service list in these proceedings in accordance with the requirements of Rule 2010 of the Commission’s Rules of Practice and Procedure, 18 C.F.R. §…Read this passage