Amended Comments of Rocky Mountain Institute re the Answers of PJM Interconnection, L.L.C. to the Order Instituting Proceeding under Section 206 of the…
Text extracted from the eLibrary original (SHA-256 d17e0283e864baf3…). Download the original from the official source.
Contents · 3 sections
Read topic-matched comments in EL25-49
Topics in the text: Connecting load and generation · Reliability and curtailment
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text
Basalt, CO / Boulder, CO / New York, NY / Oakland, CA / Washington, D.C. / Beijing, China http:///www.rmi.org / 303.567.8716 April 29, 2025 Honorable Debbie-Anne A.Read this passage
I. Introduction
printed heading
Introduction RMI thanks the Federal Energy Regulatory Commission (the “Commission”) for its examination of issues related to the co-location of large loads at generating facilities in PJM Interconnection L.L.C (“PJM”), as consolidated in Docket No.Read this passage
II. Comments
printed heading · Topic match: Connecting load and generation
The Commission must give PJM clear instructions to address these deficiencies. 3) PJM should require earlier standardized information sharing between itself, large load customers, and transmission owners (TOs) to improve forecasting accuracy and reduce planning uncertainty.Read this passage Filed comments: Connecting load and generation
III. Conclusion
printed heading
Conclusion RMI respectfully requests that the Commission accept the comments herein.Read this passage