Post-Technical Conference Comments of Google LLC to address FERC's 07/30/2026 Notice re PJM Governance and Stakeholder Reforms
Text extracted from the eLibrary original (SHA-256 1c35e68611367c5a…). Download the original from the official source.
Contents · 5 sections
Read topic-matched comments in AD26-7
Topics in the text: Cost allocation · Reliability and curtailment · Registry access
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION PJM Governance and Stakeholder Reforms ) Docket No.Read this passage
Introduction
printed heading · Topic match: Cost allocation
This public interest responsibility underpins Google's commitment to the Ratepayer Protection Pledge. 9) Should state representatives have at least one voting member on the Nominating Committee? x Comments: Google supports structured state participation in the Board selection process. 10) Should…Read this passage Filed comments: Cost allocation
B. Section 205 Filing Rights
printed heading · Topic match: Cost allocation
However, if "jump ball" rights are granted, they must be tightly bound to resource adequacy and cost allocation, with a requirement that the states reach a supermajority to ensure regional cohesion. 15) Should the Members Committee have “jump ball” filing rights over the portions of the tariff…Read this passage Filed comments: Cost allocation
C. Stakeholder Process
printed heading
Stakeholder Process Questions/Comments Yes No Neutral 16) Should the approval threshold in the Members Committee be lowered from two-thirds sector-weighted voting? x Comments: Lowering the voting threshold from 2/3 sector-weighted voting (as discussed by several states and panelists during the…Read this passage
D. State Participation
printed heading · Topic match: Cost allocation
State Participation Questions/Comments Yes No Neutral 18) In addition to OPSI, should there be a second state representative group consisting of governors’ representatives and/or state legislators’ representatives? x Comments: Google strongly supports the formal, tariff-recognized establishment of…Read this passage Filed comments: Cost allocation
Conclusion
printed heading
Conclusion Ensuring a reliable, affordable, and clean grid in PJM will require moving beyond the pursuit of absolute stakeholder consensus toward more decisive, transparent, and collaborative leadership.Read this passage