AD26-7-000 · 2026-08-24 · Google LLC

Post-Technical Conference Comments of Google LLC to address FERC's 07/30/2026 Notice re PJM Governance and Stakeholder Reforms

PDF page 1

UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION

PJM Governance and Stakeholder Reforms​ ​
)​
​
        Docket No. AD26-7-000

POST TECHNICAL CONFERENCE COMMENTS OF
GOOGLE LLC

I.​
Introduction

Google, LLC ("Google") appreciates the leadership of the Federal Energy Regulatory Commission (“FERC” or “Commission”) to address Governance and Stakeholder Reforms in PJM, and submits these post-technical conference comments in response to the Commission's July 30, 2026, Notice Requesting Post-Conference Comments.1  Brian D. George serves as Senior Lead, U.S. Energy Markets for Google, establishing and executing the company's energy strategy to ensure access to adequate power supply and infrastructure required to serve data center facilities across RTO and ISO regions, including PJM.  Mr. George participated as a panelist during Panel 2 of the Commission's July 23, 2026, Technical Conference in this docket. Although Google is not a PJM member and does not hold voting rights in PJM's stakeholder process, Google was deeply engaged in both of PJM's recent Critical Issue Fast Path ("CIFP") stakeholder processes: Large Load Additions ("CIFP-LLA") and the Reliability Backstop Procurement and Connect-and-Manage reforms ("CIFP-RBP/C&M"). Google participated in nearly every meeting and worked actively to form cross-sector coalitions, including one with four state governors (Pennsylvania, Maryland, New Jersey, and Virginia), and

1 See Notice Requesting Post-Conference Comment, Docket No. AD26-7-000 (Jul. 30, 2026). 1

PDF page 2

transmission owners to develop, refine, and advance multi-issue reform packages in the CIFP-LLA.

The timeliness of FERC’s technical conference was framed by Chairman Laura Swett's call to PJM to "right the ship" and Deputy Secretary of Energy James Danly's frank assessment that the market is "a mess.”2  This uncertainty is underscored by the recent capacity auctions, which have resulted in a critical 6,381 MW resource deficit for the 2028/29 Delivery Year—currently the largest deficit among all U.S. ISOs and RTOs.

Google's perspectives are informed by its significant investment in the region and the principles of the Ratepayer Protection Pledge (“Pledge”)—which Google and six other leading technology companies signed in March 2026.3  The Pledge reinforces the fundamental principle that the costs and risks of new generation and regional network expansions required to serve large loads should be appropriately borne by those loads themselves, and not passed on to other consumers.  To achieve this, Google continues to advocate for a workable "Bring Your Own New Capacity" ("BYONC") framework to incentivize large loads to bilaterally contract for and finance new clean generation, thereby alleviating PJM's severe supply deficit and protecting captive retail ratepayers.

II.​
Core Governance and Stakeholder Process Principles
3 Ratepayer Protection Pledge, The White House (Mar. 4, 2026),
https://www.whitehouse.gov/releases/2026/03/ratepayer-protection-pledge/ (“Ratepayer Protection Pledge”); President Trump Secures Historic Commitment to Keep Electricity Costs Down Amid Data Center Boom, The White House (Mar. 5, 2026),

https://www.whitehouse.gov/releases/2026/03/president-trump-secures-historic-commitment-to-keep-electricity-cost s-down-amid-data-center-boom/.

2 See Chairman Laura Swett’s Comments at PJM’s Annual Meeting in Baltimore, MD (May 12, 2026), https://www.ferc.gov/news-events/news/chairman-laura-swetts-comments-pjms-annual-meeting-baltimore-md-0; Commission-Led Technical Conference on PJM Governance and Stakeholder Reforms (Jul. 23, 2026), https://www.ferc.gov/news-events/events/PJM-Governance-Stakeholder-Reforms (“Technical Conference”). 2

PDF page 3

Based on Google's extensive participation, the pre-filed comments of other stakeholders, and technical conference discussions, three core structural principles should guide the Commission's evaluation of PJM governance reforms:

1.​ Valuing Stakeholder Consensus Alongside the Need for Decisive Action
PJM’s stakeholder process is an essential, highly valuable open forum for debate and collaboration. However, with more than 1,100 members representing naturally conflicting commercial interests, full consensus on foundational market and operational issues is simply not always attainable.

The recent CIFP-LLA process illustrates this reality: While none of the twelve stakeholder packages achieved the required two-thirds sector-weighted vote, they were not twelve completely divergent paths. In fact, most proposals were conceptually aligned around key themes—specifically load forecasting, demand response, and BYONG incentives. Where broad agreement falls short of formal voting thresholds, PJM Executive Staff and the Board of Managers must step in to synthesize these shared themes, establish clear directives, and advance necessary regulatory filings that reflect stakeholder priorities while moving the market forward. 2.​ Building on Stakeholder Input Through Deliberate Process Discipline

Encouraging PJM leadership to step forward when consensus is difficult to reach is not a call to bypass the stakeholder community through unilateral Section 205 filing rights. The collaborative nature of PJM’s membership is one of its greatest strengths; setting it aside risks creating new regulatory friction and unnecessary uncertainty before FERC.

The most effective path forward is to support and refine the stakeholder framework rather than replace it. PJM can achieve this by establishing clearer issue scoping upfront and keeping 3

PDF page 4

discussions anchored to reasonable timelines. When a stakeholder process concludes, the Board of Managers is best positioned to synthesize the valuable insights and common ground members have developed, translating shared ideas into timely, well-supported regulatory solutions. 3.​ Structured State Collaboration is Vital, But Must Avoid Gridlock

Compared with other RTOs and ISOs, PJM is an outlier in its limited institutional role for state regulators and policymakers. Google supports a more robust role for states, particularly the 13 governors and utility commissions within the footprint who are ultimately accountable for the retail rates customers pay and the siting of the infrastructure needed to maintain reliability. However, as noted by Commissioner Judy Chang and other conference participants, securing a single "states' view" is incredibly challenging and potentially unrealistic given the regional diversity across PJM's 13 states and the District of Columbia. Google supports a structure that would fund and empower states to coordinate their technical positions, bringing unified regional public-policy priorities directly into PJM's strategic planning and board selection processes without bogging down the day-to-day wholesale market operations.

III.​
Responses to Specific Comments and Questions

A.​ PJM Board Independence

Questions/Comments
Y
N
Neutral
1) Should Board members’ terms be extended to five or more years?
x

Comments: Google does not take a rigid position on term lengths, but notes that the observed conference consensus that longer terms (such as the 5-year term discussed by panelists) could help insulate Board members from short-term stakeholder pressures or concerns over annual renomination. Google encourages a review of other RTO/ISO Board member lengths and renomination terms to identify potential best practices that could be applicable to PJM.

2) Should there be a maximum number of years that a Board member may serve

x
4

PDF page 5

Questions/Comments
Y
N
Neutral
(e.g., 10 years)?

Comments: Google supports clear term limits if they enhance Board independence and prevent stagnation, provided they do not restrict PJM's ability to attract and retain qualified candidates with deep energy market expertise. Any restrictions should be carefully considered and backed up with evidence in their favor, including defining under which circumstances such restrictions should be triggered.

3) Should the Board member qualification rules be revised to provide a preference
for some Board members that reside in the PJM region?

x

Comments: While local familiarity with PJM's unique market and regulatory footprint is beneficial, establishing strict residency requirements should not artificially limit the pool of national energy experts eligible for Board service.

4) Should the conflict-of-interest rules be revised to reduce the cooling off period for Board members from two years to one year?

x

Comments: Reducing the cooling-off period to one year is a pragmatic reform. It expands the candidate pool to include recent industry professionals who deeply understand the complex, fast-evolving operational realities of modern grids and large loads without compromising core ethical independence.

5) Should restrictions on Board communications be relaxed to enable more
communication between the Board and stakeholders?
x

Comments: The current ex parte communication limits isolate the Board from stakeholders, preventing direct and productive dialogue. During the CIFP-LLA process, PJM’s positions and acceptable pathways forward were not consistently known to stakeholders, creating a disjointed process. Google agrees with conference feedback that Board members should have regular, structured, and transparent contact with states and stakeholders early in the policy development process to build alignment.

6) In order to increase transparency, should Board votes be made public or the
Board be required to explain its reasoning?
x

Comments: Google strongly supports requiring the Board to publicly defend its decision-making rationale, especially when it deviates from stakeholder or state consensus on high-stakes processes, such as the recently concluded CIFP-LLA process. Market participants and long-term energy investors make multi-billion dollar investment plans based on these proceedings and sudden, unexplained late-stage shifts in proposal directions (like those seen in connect-and-manage, now IRAS, and RBP in 2026) inject severe commercial uncertainty and disrupt contracting for new generation.

7) In order to increase transparency, should some Board meetings be open or
available to the public?
x

Comments: Increased transparency in any form is a benefit.
5

PDF page 6

Questions/Comments
Y
N
Neutral
8) Should PJM’s governing documents be revised to explicitly state that the
responsibility of PJM and its Board is to serve the public interest?
x

Comments: Google strongly supports codifying an explicit public interest mandate. PJM must legally balance reliability and market efficiency with public interest objectives. This is critical to ensure grid rules accommodate the integration of large loads and support state energy policies while protecting residential ratepayers from stranded asset risks or cost-shifting. This public interest responsibility underpins Google's commitment to the Ratepayer Protection Pledge.

9) Should state representatives have at least one voting member on the Nominating
Committee?
x

Comments: Google supports structured state participation in the Board selection process.
10) Should PJM adopt public performance metrics and tie management
compensation to their achievement?
x

Comments: Board and management accountability must be strengthened, and tying compensation to objective reliability and load-forecasting metrics is a proven practice in other peer RTOs.

B. Section 205 Filing Rights

Questions/Comments
Yes
No Neutral
11) Should the stakeholder process be advisory, i.e., stakeholder votes only inform
the Board?

x

Comments: Google agrees the Board must not be permanently gridlocked, but making the process purely advisory removes essential checks and balances. If the Board files a proposal without consensus, it should be treated as an extraordinary measure that requires a heightened, public written justification.

12) Should PJM have section 205 filing rights over the energy market and ancillary
services unencumbered by the requirement to obtain approval of two-thirds of
the Members Committee?

x

Comments: Google does not endorse unconditioning PJM's Section 205 filing rights. If any modifications to filing rights are made, they must be strictly conditional on a mandatory early state/stakeholder consultation window and a written Board demonstration of how the proposal protects retail customers and ensures commercial predictability.

13) Should PJM have section 205 filing rights over Regional Transmission
Expansion Planning (RTEP) unencumbered by the requirement to obtain
approval of two-thirds of the Members Committee?

x

6

PDF page 7

Questions/Comments
Yes
No Neutral

Comments:  Same as 12
14) Should the Organization of PJM States Inc (OPSI) have “jump ball” rights over
resource adequacy and transmission cost allocation filings when a supermajority
of OPSI agrees on an alternative proposal?

x

Comments: While Google supports expanding states' strategic input, we are cautious about expanding formal Section 205 filing, particularly to states as diverse as those that make up the PJM region. Providing unilateral filing rights risks creating parallel, conflicting regulatory paths. However, if "jump ball" rights are granted, they must be tightly bound to resource adequacy and cost allocation, with a requirement that the states reach a supermajority to ensure regional cohesion.

15) Should the Members Committee have “jump ball” filing rights over the portions
of the tariff where PJM has 205 filing rights when a supermajority of
stakeholders approves an alternative proposal?

x

Comments: Google does not advocate for "jump ball" rights for the Members Committee. To resolve the current gridlock, PJM and its independent Board must maintain clear executive accountability for filing market and transmission rules.

C. Stakeholder Process

Questions/Comments
Yes
No Neutral

16) Should the approval threshold in the Members Committee be lowered from
two-thirds sector-weighted voting?

x

Comments: Lowering the voting threshold from 2/3 sector-weighted voting (as discussed by several states and panelists during the technical conference) could reduce gridlock. However, the mathematical threshold itself is not the primary bottleneck. The core issue is the lack of early executive direction, scoping, and decision discipline from PJM leadership. If the stakeholder process is made advisory and the Board is granted conditional independent Section 205 filing rights, the 2/3 voting threshold becomes a useful metric of stakeholder consensus rather than a barrier to regulatory filing.

17) Should the voting rules barring affiliate votes, which apply to senior standing
committees, also apply to lower-level committees?
x

Comments: Google supports eliminating affiliate voting at lower-level committees and task forces. Under the current "status quo" rules, large market participants can leverage multiple registered affiliates to dominate lower-committee processes and "sector- block" proposals. Extending sector-weighted voting or Member-only voting to lower committees would prevent these coalitions from stifling innovative ideas and non-traditional proposals before they can even reach senior committees.

7

PDF page 8

D. State Participation

Questions/Comments
Yes
No Neutral
18) In addition to OPSI, should there be a second state representative group consisting of governors’ representatives and/or state legislators’ representatives? x

Comments: Google strongly supports the formal, tariff-recognized establishment of the PJM Governors' Collaborative. As Brian D. George noted in a pre-filed statement, Google successfully partnered with a bipartisan coalition of four state governors during the first CIFP-LLA process.

19) Should state representatives have a formal voting role in the stakeholder process (limited to certain topics, such as resource adequacy and regional transmission cost allocation) in addition to the consumer advocate votes?

x

Comments: Google takes no position on whether state representatives should have a formal voting role in the stakeholder process.

20) Should PJM be required to consult with OPSI prior to making a section 205 filing related to resource adequacy and transmission cost allocation?

x

Comments: Yes, although we recognize that PJM already engages extensively with OPSI today.

IV.​
Conclusion
Ensuring a reliable, affordable, and clean grid in PJM will require moving beyond the pursuit of absolute stakeholder consensus toward more decisive, transparent, and collaborative leadership. By instilling greater process discipline, engaging states and stakeholders earlier, and empowering the Board to provide clear and proactive direction, PJM can deliver the regulatory certainty needed to support the next generation of energy investment. Governance reform should focus on strengthening these mechanisms rather than shifting or fragmenting filing rights Respectfully submitted,

8

PDF page 9

/s/ Brian George
Brian George
Sr. Lead, US Energy Markets
Elizabeth Savage
Strategic Negotiator
Google LLC
655 New York Ave., NW
Washington, DC 20001
(202) 999-0990
briangeorge@google.com
eomsavage@google.com

Dated: August 24, 2026