Answer of Corporate Energy Buyers Association in Support of the Amended Motion for Abeyance filed on 08/03/2026 by Southwest Power Pool, Inc. et al
The Corporate Energy Buyers Association answers in support of the SPP Joint Movants' amended motion for a 95-day abeyance in EL26-68 and asks FERC to grant it on an expedited basis.
Asks FERC to: Grant the Joint Movants' amended motion for a 95-day abeyance in an expedited manner.
A buyer-side answer supporting the E-9 SPP abeyance motion, which moved the 60-day show cause response to November 20, 2026.
E-9 SPP: Show cause or propose tariff changes in 60 days (p. 5)
Key points
- CEBA says abeyance lets SPP and stakeholders work collaboratively instead of moving the debate to the FERC docket.
as opposed to a rushed proposal that would unnecessarily shift stakeholder debate to the Commission docket. PDF p. 1
- CEBA says the abeyance accommodates the Regional State Committee and SPP Board meetings.
reasonable accommodations necessary to convene the Regional State Committee and the SPP Board of Directors PDF p. 1
- CEBA says the 95 days would not materially slow reform and would improve commercial viability and legal durability.
extension would not materially impede the Commission's objectives for advancing reforms quickly yet offers significant benefits PDF p. 2
Read topic-matched comments in EL26-68
Topics in the text: Filing procedure
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text · Topic match: Filing procedure
For these reasons, CEBA respectfully requests that the Commission grant the motion in an expedited manner.Read this passage Filed comments: Filing procedure
CERTIFICATE OF SERVICE
printed heading
Dated at Washington, D.C., this 7th day of August 2026. /s/ John Miller___________________ John Miller Director, Transmission Policy CEBA 1501 M Street, N.W., Suite 900 Washington, D.C. 20005 (240) 630-2201 jmiller@ceba.orgRead this passage