Comments of Calibrant Energy requesting clarification re the PJM Interconnection, LLC’s proposed revisions to the Open Access Transmission Tariff and the…
Text extracted from the eLibrary original (SHA-256 bcd10e4fccba0a04…). Download the original from the official source.
Contents · 2 sections
Read topic-matched comments in ER26-3380
Topics in the text: Reliability and curtailment
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text · Topic match: Reliability and curtailment
Calibrant here seeks a limited clarification of PJM’s proposed tariff provisions only regarding the evidence that must be submitted to be eligible as Qualifying RBP Offset UCAP under proposed Tariff Attachment DD Section 18.2 (c), which is consistent with PJM’s position during the stakeholder…Read this passage Filed comments: Reliability and curtailment
I. REQUEST FOR CLARIFICATION
printed heading · Topic match: Reliability and curtailment
REQUEST FOR CLARIFICATION PJM’s Proposed Tariff Attachment DD Section 18.2 (c) sets forth the evidence that must be submitted during the RBP bid submission window in order for new capacity that will serve the region to be eligible as Qualifying RBP Offset UCAP MW.Read this passage Filed comments: Reliability and curtailment
II. CONCLUSION
printed heading
CONCLUSION For the foregoing reasons, Calibrant respectfully requests that PJM or the Commission clarify that behind-the-meter generation projects can provide evidence that they are eligible as Qualifying RBP Offset UCAP MW under Proposed Tariff Attachment DD Section 18.2 (c)(i), and that such…Read this passage
CERTIFICATE OF SERVICE
printed heading
Dated: August 21, 2026 /s/ Nathan Lobel Nathan Lobel Roselle LLP 300 New Jersey Ave.Read this passage