EL25-49-000 · 2026-02-23 · Indicated PJM Transmission Owners

Exhibit No. PTO-0002

Text extracted from the eLibrary original (SHA-256 75e7d3a9faa3f853…). Download the original from the official source.

Read the parent filing

Read topic-matched comments in EL25-49

Topics in the text: Retail and wholesale authority

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Pages 1 to 4

page range · Topic match: Retail and wholesale authority

RESUMES OF PETER BLAZUNAS, LANCE SCHAFER, AND HANHAN HAMMER PG. 1 PETER BLAZUNAS VICE PRESIDENT PROFESSIONAL HISTORY Concentric Energy Advisors, Inc.
Read this passage Filed comments: Retail and wholesale authority

Pages 5 to 8

page range · Topic match: Retail and wholesale authority

Resumes of Peter Blazunas, Lance Schafer, and Hanhan Hammer PG. 5 SPONSOR DATE CASE/APPLICANT DOCKET SUBJECT Rhode Island Energy 2024 Rhode Island Energy Docket No. 24-17-EL Rate Design and Cost Recovery (Residential Assistance Recovery Filing) Rhode Island Energy 2024 Rhode Island Energy Docket…
Read this passage Filed comments: Retail and wholesale authority

Pages 9 to 12

page range

RESUMES OF PETER BLAZUNAS, LANCE SCHAFER, AND HANHAN HAMMER PG. 9 SPONSOR DATE CASE/APPLICANT DOCKET NO.
Read this passage