EL25-49-000 · 2026-02-23 · Indicated PJM Transmission Owners

Initial Brief and Joint Responses of the Indicated PJM Transmission Owners to Paper Hearing Questions

Text extracted from the eLibrary original (SHA-256 3f57fef70271fbc5…). Download the original from the official source.

Contents · 3 sections
  1. I. INTRODUCTION p. 2
  2. II. RESPONSES TO PAPER HEARING QUESTIONS p. 6
  3. III. CONCLUSION p. 26

Read topic-matched comments in EL25-49

Topics in the text: Connecting load and generation · Cost allocation · Reliability and curtailment

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text · Topic match: Connecting load and generation

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, L.L.C., et al. ) Docket No.
Read this passage Filed comments: Connecting load and generation

I. INTRODUCTION

printed heading · Topic match: Connecting load and generation

First, the rates and terms for the new transmission services must ensure that Co-Located Load customers11 pay their appropriate share of transmission system costs, including those related to the benefits of being connected and synchronized with the extensive PJM Transmission System, which reliably…
Read this passage Filed comments: Connecting load and generation

II. RESPONSES TO PAPER HEARING QUESTIONS

printed heading · Topic match: Connecting load and generation

First, and most importantly, any penalties must be sufficient to meaningfully deter Co-Located Load customers from exceeding their contract demand and making unreserved use of the transmission system.
Read this passage Filed comments: Connecting load and generation

III. CONCLUSION

printed heading

CONCLUSION The PJM Transmission Owners appreciate the opportunity to submit their initial responses to the paper hearing questions posed by the Commission in the Order.