EL25-49-002 · 2026-01-20 · Eolian, L.P.Antora Energy LLC

Eolian, L.P. et al. submit Request for Rehearing of the 12/18/2025 Order

Text extracted from the eLibrary original (SHA-256 05b6a972d8afd803…). Download the original from the official source.

Contents · 3 sections
  1. I. BACKGROUND p. 4
  2. A. Energy storage resources are critical for meeting data center loads quickly p. 4
  3. B. Request for Clarification p. 5

Read topic-matched comments in EL25-49

Topics in the text: Connecting load and generation · Cost allocation

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text · Topic match: Connecting load and generation

Specifically, the undersigned parties ask the Commission to clarify that where the Order provides that a Co-Located load may “request only the minimum level of interconnection service it deems necessary to effectuate its Co-Location Arrangement,”2 that it means the Co-Located Load may nominate a…
Read this passage Filed comments: Connecting load and generation

I. BACKGROUND

printed heading

I.
Read this passage

A. Energy storage resources are critical for meeting data center loads quickly

printed heading · Topic match: Connecting load and generation

Energy storage resources are better positioned than any other resource to manage the total withdrawals from a Co-Located load quickly and reliably.
Read this passage Filed comments: Connecting load and generation

B. Request for Clarification

printed heading · Topic match: Connecting load and generation

With regard to “Interconnection Customers seeking to use new generating facilities to serve Co-Located Load,” the Commission requires PJM to clarify that it “shall consider requests for interconnection service below the full generating capability of the generating facility, so that an…
Read this passage Filed comments: Connecting load and generation

CERTIFICATE OF SERVICE

printed heading

Dated: January 20, 2026 Ariel Horowitz Head of Market Strategy Eolian, L.P.