ER26-3380-000 · 2026-09-08 · Constellation Energy Generation, LLC

Motion for Leave to Answer and Answer of Constellation Energy Generation, LLC to certain comments and protests re the PJM Reliability Backstop Procurement…

Text extracted from the eLibrary original (SHA-256 5c0f992eaa3b8eb1…). Download the original from the official source.

Contents · 5 sections
  1. I. BACKGROUND p. 1
  2. II. ANSWER p. 2
  3. A. Request for Additional Clarification on Resources Eligible to Supply p. 2
  4. B. Credit and Collateral Requirements of Load Serving Entities p. 3
  5. III. CONCLUSION p. 11

Read topic-matched comments in ER26-3380

Topics in the text: Credit and exit · Cost allocation · Reliability and curtailment

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text

1 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) PJM Interconnection, L.L.C. ) Docket No.
Read this passage

I. BACKGROUND

printed heading · Topic match: Reliability and curtailment

PJM Interconnection LLC, 98 FERC ¶ 61,208, at p. 61,756 (2002) (answer accepted to provide new factual and legal material to assist the Commission in decision-making process). 3 PJM Interconnection, L.L.C., Reliability Backstop Procurement to Address Resource Adequacy Concerns Stemming from Large…
Read this passage Filed comments: Reliability and curtailment

II. ANSWER

printed heading

II.
Read this passage

A. Request for Additional Clarification on Resources Eligible to Supply

printed heading

Request for Additional Clarification on Resources Eligible to Supply Qualifying RBP Offset UCAP MW Constellation maintains the arguments and requested relief set forth in its Limited Protest concerning the treatment of RBP Resources in subsequent RPM Auctions.5 The NRG Companies, the Independent…
Read this passage

B. Credit and Collateral Requirements of Load Serving Entities

printed heading · Topic match: Credit and exit

The record is not sufficiently developed, however, to prescribe a durable replacement methodology.21 The replacement must be conformed to the RBP settlement structure accepted by the Commission and supported by evidence addressing the relevant exposure horizon, stress assumptions, credit-quality…
Read this passage Filed comments: Credit and exit

III. CONCLUSION

printed heading

CONCLUSION In accordance with PJM’s willingness to accept changes under NRG Power Marketing,23 the Commission should (i) accept the RBP subject to the modifications Constellation discussed in its Limited Protest in this proceeding, with the additional clarification discussed above permitting Energy…
Read this passage

CERTIFICATE OF SERVICE

printed heading

Dated at Washington, D.C. this 8th day of September 2026. /s/ Alexandra K.