Comments of ACORE on PJM Interconnection, L.L.C.'s 08/13/2026 proposal to establish Interim Resource Adequacy Service and a large load registry
Text extracted from the eLibrary original (SHA-256 09c36cb556fc4208…). Download the original from the official source.
Read topic-matched comments in ER26-3515
Topics in the text: Connecting load and generation · Reliability and curtailment · Registry access
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text · Topic match: Connecting load and generation
Any reforms developed to address this need must incent and be aligned with a longer- term contracting paradigm rather than reliance on the short-term volatile pricing in PJM’s annual Reliability Pricing Model (RPM) capacity market.Read this passage Filed comments: Connecting load and generation
CERTIFICATE OF SERVICE
printed heading
Dated this 3rd day of September, 2026. /s/ Elise Caplan Elise CaplanRead this passage