ER26-3515-000 · 2026-09-15 · Industrial Energy Consumers of America

Comments of the Industrial Energy Consumers of America in response to PJM Interconnection, L.L.C.’s proposal to Establish Interim Resources Adequacy, et al

Text extracted from the eLibrary original (SHA-256 8e750ec84ff110e4…). Download the original from the official source.

Contents · 5 sections
  1. I. Existing large loads should be excluded from the Large Load Registry. The p. 1
  2. II. Ordinary load fluctuations should not subject existing customers to IRAS. p. 2
  3. III. Incremental expansions should trigger IRAS obligations only for the net new p. 2
  4. IV. IRAS participants should not receive compensation that shifts costs to other p. 2
  5. V. PJM’s “peak load” measurement in the New Large Load definition should p. 3

Read topic-matched comments in ER26-3515

Topics in the text: Reliability and curtailment · Registry access · Cost allocation

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text · Topic match: Registry access

ER26-3515-000 COMMENTS OF THE INDUSTRIAL ENERGY CONSUMERS OF AMERICA The Industrial Energy Consumers of America (IECA) respectfully submits these Comments in response to the Proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy Service and A Large Load Registry to Address…
Read this passage Filed comments: Registry access

I. Existing large loads should be excluded from the Large Load Registry. The

printed heading · Topic match: Registry access

If existing loads are included for informational purposes, they must be clearly exempted from all IRAS operational obligations — including curtailment, BYONC requirements, and RPM auction adjustments — and any collected data must be subject to robust confidentiality protections.
Read this passage Filed comments: Registry access

II. Ordinary load fluctuations should not subject existing customers to IRAS.

printed heading

“existing” Large Load must distinguish between genuine new load growth and normal operational variation at existing facilities.
Read this passage

III. Incremental expansions should trigger IRAS obligations only for the net new

printed heading

As a threshold matter, it must be noted that very little evidence has been presented that 50 MW is an appropriate bright-line trigger for the obligations set forth by PJM’s instant filing.
Read this passage

IV. IRAS participants should not receive compensation that shifts costs to other

printed heading · Topic match: Cost allocation

If any compensation is provided, it should be funded by the new large-load customer base itself; States must retain full discretion to set the rate at zero without risking a violation of the filed rate doctrine.
Read this passage Filed comments: Cost allocation

V. PJM’s “peak load” measurement in the New Large Load definition should

printed heading · Topic match: Reliability and curtailment

Load netted against on-site generation under BTMG should be measured in a similar manner for IRAS purposes, providing certainty to retail customers who have invested in resource adequacy through retail BTMG.
Read this passage Filed comments: Reliability and curtailment