Comments of RMI on the Answers of PJM Interconnection, L.L.C. to the Order Instituting Proceeding under Section 206 of the Federal Power Act and…
Text extracted from the eLibrary original (SHA-256 764707ea30fa1563…). Download the original from the official source.
Contents · 3 sections
Read topic-matched comments in EL25-49
Topics in the text: Connecting load and generation
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text
Basalt, CO / Boulder, CO / New York, NY / Oakland, CA / Washington, D.C. / Beijing, China http:///www.rmi.org / 303.567.8716 April 23, 2025 Honorable Debbie-Anne A.Read this passage
I. Introduction
printed heading
Introduction RMI thanks the Federal Energy Regulatory Commission (the “Commission”) for its examination of issues related to the co-location of large loads at generating facilities in PJM Interconnection L.L.C (“PJM”), as consolidated in Docket No.Read this passage
II. Comments
printed heading · Topic match: Connecting load and generation
The Commission must give PJM clear instructions to address these deficiencies.Read this passage Filed comments: Connecting load and generation
III. Conclusion
printed heading
Conclusion RMI respectfully requests that the Commission accept the comments herein.Read this passage