EL25-49-000 · 2025-03-24 · PJM Interconnection, L.L.C.

Exhibit A

Text extracted from the eLibrary original (SHA-256 4d31bbdebe5ec0f3…). Download the original from the official source.

Read the parent filing

Read topic-matched comments in EL25-49

Topics in the text: Connecting load and generation · Cost allocation · Reliability and curtailment

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Pages 1 to 3

page range · Topic match: Connecting load and generation

PJM Preference Yes - Highest Reliability Yes - Highest Reliability Not for Large Loads Load Status Network Network Network Generation Capacity Status Yes Yes No PJM obligation to serve Yes Yes Yes Load System Used and Charged NITS (Full load during coincident peak); Energy; Capacity (Full load…
Read this passage Filed comments: Connecting load and generation