PJM Identified Options – Exhibit A
Existing Option 1
Existing Option 2
Existing Option 3
*note: each option is subject to state laws
that may specifically define and limit when
and how load in a jurisdiction can be
served by a supplier other than a
franchised public utility
Load with a separate Point of Interconnection (POI) that is Network Load
(Existing NITS rules)
Co-located load that is at the same Point of
Interconnection (POI) but separately metered that is Network Load
(Existing NITS rules)
Existing Behind The Meter Generation (BTMG) where the load is the customer
Description
This option is where the load is network load and generation is a capacity resource and they are not electrically co-located. The load and generation may be physically located at the same location but they are electrically connected to the grid separately.
This option is where the load is network load and generation is a capacity resource and they are metered separately This option reflects PJM's existing BTMG rules where the load is primary customer and nets with BTMG.
Reliability consideration: Existing Non-Retail BTMG is annually capped because it does not carry reserves equal to the installed reserve margin (net is zero during coincident peak).
Large load behind generation was not intended.
PJM Preference
Yes - Highest Reliability
Yes - Highest Reliability
Not for Large Loads
Load Status
Network
Network
Network
Generation Capacity Status
Yes
Yes
No
PJM obligation to serve
Yes
Yes
Yes
Load System Used and Charged NITS (Full load during coincident peak); Energy; Capacity (Full load during coincident peak)
NITS (Full load during coincident peak); Energy; Capacity (Full load during coincident peak)
NITS (Net withdrawal during coincident peak); Energy (Net withdrawal); Capacity (Net withdrawal during coincident peak) Ancillary Services Used
Reactive, Black Start, Regulation, Sync, Non Sync, Day- ahead Scheduling Reserves
Reactive, Black Start, Regulation, Sync, Non Sync, Day- ahead Scheduling Reserves
Reactive, Black Start, Regulation, Sync, Non Sync, Day- ahead Scheduling Reserves
Ancillary Services Charged
Reactive, Black Start, Regulation, Sync, Non Sync, Day- ahead Scheduling Reserves (based on entire load) Reactive, Black Start, Regulation, Sync, Non Sync, Day- ahead Scheduling Reserves (based on entire load) Reactive, Black Start, Regulation, Sync, Non Sync, Day- ahead Scheduling Reserves (Net withdrawal)
Generation Revenue
• Capacity (based on full CIRs)
• Energy and Ancillary Services (based on entire gen output)
• Capacity (based on full CIRs)
• Energy and Ancillary Services (based on entire gen output) • Capacity (For portion of CIRs retained)
• Energy and Ancillary Services (net injection only) Studies
• TO Load Integration study
•PJM Do No Harm study
•RTEP process inclusive of Load Forecast
• TO Load Integration study
•PJM Do No Harm study
•RTEP process inclusive of Load Forecast
•Necessary Study
• TO Load Integration study
•PJM Do No Harm study
•RTEP process inclusive of Load Forecast
•Necessary Study
Included in Load Forecast
(RTEP)
Yes
Yes
Only if Net Withdrawal >0 during coincident peak Included in RPM Reliability
Requirement
Yes
Yes
Only if Net Withdrawal >0 during coincident peak Cost Allocation for
Interconnection Upgrades
• Supplemental projects pursuant to local TO methodology
• RTEP upgrades pursuant to RTEP cost allocation
• No modification to generation.
• Supplemental projects pursuant to local TO methodology
• RTEP upgrades pursuant ot RTEP cost allocation
• Generator for the changes to its facility to accommodate the load
• Supplemental projects pursuant to local TO methodology
• RTEP upgrades pursuant ot RTEP cost allocation
• Generator for the changes to its facility to accommodate the load
System Protection
Requirements
N/A
N/A
N/A
Demand Response Eligibility
Yes
Yes
Yes if net positive load
Tariff Modifications
No
No
No
PDF page 3
PJM Identified Options –
Exhibit A
New Option 4
New Option 5
New Option 6
New Option 7
New Option 8
*note: each option is subject to state laws that may specifically define and limit when and how load in a
jurisdiction can be served by a supplier other than a franchised public utility Co-located load with connection to grid with protections to avoid
delivery of system energy to serve the load
Co-located load with connection to grid with protections to avoid
delivery of system energy to serve the load or receive back-up service from PJM with permission
Co-located load that elects to be
Network Load and bring own
generation
BYOG
Co-located load that takes
Interruptible Service
(Load willing to curtail in advance of Emergency Procedures)
Co-located Load that elects to be Network Load and that participates as Demand Response
Description
This option is when the load is located behind the generation and there are protection mechanisms in place to
prevent delivery of energy from the grid to serve the load in the event the generation is offline.
This option is when the load is located behind the generation and there is protection mechanisms in place to
prevent delivery of energy from the grid to serve the load in the event the generation is offline. It also allows for back-up service from the PJM system with permission.
This option provides an opportunity for to bring your own generation with the incentive for faster interconnection when the load is Network Load
This option provides an opportunity for large load to integrate as a non-capacity backed load where it avoids capacity costs if willing to curtail to support reliability in advance of emergency conditions.
This existing option provides an
opportunity for the load to be Network Load and participate as a Demand
Response resource. Options to operate back-up generation provides a
mechanism to serve the co-located load when asked to curtail for DR. This option assume the co-located load and
generation share the same POI.
Additional review of DR rules and
opportunities for relaxation of federal and state emission restrictions provide more incentives.
PJM Preference
Less preferred
Less preferred
Yes - maintains Resource Adequacy
Yes - maintains Resource Adequacy
Yes - maintains Resource Adequacy
Load Status
Not unless designated in a manner
consistent with state law
Not unless designated in a manner
consistent with state law
Network
Network (advance curtailment)
Network
Generation Capacity Status
Only for portion of Generation > Load Only for portion of Generation > Load Yes
Yes
Yes
PJM obligation to serve
Not unless designated in a manner
consistent with state law
Not unless designated in a manner
consistent with state law
Yes
Yes but less priority
Yes
Load System Used and Charged
If not designated Network Load,
assuming no withdrawal of energy during coincident peak then no traditional NITS charges. However, network is still used to support co-location and delivery of ancillary services and should be part of a new rate design.
If not designated Network Load,
assuming no withdrawal of energy during coincident peak then no traditional NITS charges. However, network is still used to support co-location and delivery of ancillary services and should be part of a new rate design
NITS (Full load during coincident peak); Energy; Capacity (Full load during coincident peak)
NITS (Full load during coincident peak); Energy, Capacity (only for portion that is not non-capacity backed)
NITS (Full load during coincident peak); Energy; Capacity (Full load during coincident peak)
Ancillary Services Used
Reactive, Black Start, Regulation, Sync, Non Sync, Day-ahead Scheduling
Reserves
Reactive, Black Start, Regulation, Sync, Non Sync, Day-ahead Scheduling
Reserves
Reactive, Black Start, Regulation, Sync, Non Sync, Day-ahead Scheduling
Reserves
Reactive, Black Start, Regulation, Sync, Non Sync, Day-ahead Scheduling
Reserves
Reactive, Black Start, Regulation, Sync, Non Sync, Day-ahead Scheduling
Reserves
Ancillary Services Charged
Reactive, Black Start, Regulation, Sync, Non Sync, Day-ahead Scheduling
Reserves (based on entire load)
Reactive, Black Start, Regulation, Sync, Non Sync, Day-ahead Scheduling
Reserves (based on entire load)
Reactive, Black Start, Regulation, Sync, Non Sync, Day-ahead Scheduling
Reserves (based on entire load)
Reactive, Black Start, Regulation, Sync, Non Sync, Day-ahead Scheduling
Reserves (based on entire load)
Reactive, Black Start, Regulation, Sync, Non Sync, Day-ahead Scheduling
Reserves (based on entire load)
Generation Revenue
• Capacity (For portion of CIRs retained)
• Energy and Ancillary Services if injecting onto the PJM Grid
• Capacity (For portion of CIRs retained)
• Energy and Ancillary Services if injecting onto the PJM Grid
• Capacity (based on full CIRs)
• Energy and Ancillary Services (based on entire gen output)
• Capacity (based on full CIRs)
• Energy and Ancillary Services (based on entire gen output)
• Demand Response Revenue
• Capacity (based on full CIRs)
• Energy and Ancillary Services (based on entire gen output)
Studies
PJM Necessary Study, reduced
generator CIRs studied in RTEP
PJM Necessary Study, reduced
generator CIRs studied in RTEP
• TO Load Integration study
•PJM Do No Harm study
•RTEP process inclusive of Load
Forecast
•Generator Interconnection Study
• TO Load Integration study
•PJM Do No Harm study
•RTEP process inclusive of Load
Forecast
•Necessary Study
• TO Load Integration study
•PJM Do No Harm study
•RTEP process inclusive of Load
Forecast
•Necessary Study
Included in Load Forecast (RTEP)
No for load; only retained CIRs are included in RTEP
• Load - Only if Net Withdrawal >0 during coincident peak.
• Only CIRs retained included in RTEP. Yes
Yes
Yes
Included in RPM Reliability
Requirement
No for load; only retained CIRs are included in RTEP
• Load - Only if Net Withdrawal >0 during coincident peak
• Only CIRs retained included in RPM Yes
• No for non-capacity backed load
• CIRs included in RPM
Yes
Cost Allocation for
Interconnection Upgrades
Generator for the changes to its facility to accommodate the load.
Generator also responsible for any system upgrades to serve the load. Generator for the changes to its facility to accommodate the load.
Generator also responsible for any system upgrades to serve the load.
• Supplemental projects pursuant to local TO methodology
• RTEP upgrades pursuant to RTEP cost allocation
• Generator for the generator
interconnection
• Supplemental projects pursuant to local TO methodology
• RTEP upgrades pursuant ot RTEP cost allocation
• Generator for the changes to its facility to accommodate the load
• Supplemental projects pursuant to local TO methodology
• RTEP upgrades pursuant ot RTEP cost allocation
• Generator for the changes to its facility to accommodate the load
System Protection Requirements
Yes
Yes and back-up unit required to take forced outage
N/A
N/A
N/A
Demand Response Eligibility
No
No
Yes
No
Yes
Tariff Modifications
Yes
Yes
Maybe
Yes
Maybe