ER26-3515-000 · 2026-09-04 · Equinix Inc.

Motion of Equinix Inc. for Leave to Protest, Seek Clarification on and Comment Out-of-Time on the Proposal of PJM Interconnection, L.L.C. to Establish…

Text extracted from the eLibrary original (SHA-256 fa099ab22ae31a8d…). Download the original from the official source.

Read topic-matched comments in ER26-3515

Topics in the text: Registry access · Reliability and curtailment

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Pages 1 to 2

page range · Topic match: Registry access

However, as detailed in the attached, it later that day received notice from FERC Online that FERC watermarks were on the document as 1 PJM Interconnection, L.L.C., “Proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy Service and a Large Load Registry to Address System…
Read this passage Filed comments: Registry access