Motion of Equinix Inc. for Leave to Protest, Seek Clarification on and Comment Out-of-Time on the Proposal of PJM Interconnection, L.L.C. to Establish…
PDF page 1
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
PJM Interconnection, L.L.C.
)
Docket No. ER26-3515
MOTION FOR LEAVE TO PROTEST,
SEEK CLARIFICATION ON AND COMMENT OUT-OF-TIME ON
THE PROPOSAL OF PJM INTERCONNECTION, L.L.C. TO
ESTABLISH INTERIM RESOURCE ADEQUACY SERVICE AND A
LARGE LOAD REGISTRY TO ADDRESS SYSTEM RELIABILITY
Pursuant to Rules 211 and 212 of the Rules of Practice and Procedure of Federal Energy Regulatory Commission (“FERC” or the “Commission”), in an abundance of caution, and after completing the instructions for refiling provided by the FERC Online team, Equinix Inc. (“Equinix”) is submitting this Motion for Leave to Protest, Seek Clarification on and Comment Out-Of-Time to the filing by PJM Interconnection, L.L.C. (“PJM”) entitled “Proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy Service and a Large Load Registry to Address System Reliability” (the “IRAS Filing”), which PJM submitted on August 13, 2026 in the above-captioned docket.1
On August 13, FERC publicly noticed the PJM filing and established September 3 as the deadline for interventions and the submittal of comments and protests. Equinix filed a timely doc-less motion to intervene in this proceeding on Aug. 21, 2026. At 4:20 pm on Sept. 3, 2026, prior to the 5:00 p.m. deadline, Equinix submitted what it believed to be its comments, a request for clarification, and a protest of the PJM proposal. However, as detailed in the attached, it later that day received notice from FERC Online that FERC watermarks were on the document as
1 PJM Interconnection, L.L.C., “Proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy Service and a Large Load Registry to Address System Reliability,” Docket No. ER26-3515-000, Transmittal Letter (August 13, 2026).
PDF page 2
2
filed, and that the document should be refiled. After some investigation, Equinix realized the wrong document (a copy of PJM’s IRAS Filing, rather than its reponse to that filing) had inadvertently been uploaded. 2 In accordance with the instructions provided by the FERCOnline team in its email, the corrected filing, accompanied by a cover letter explaining what had occurred, was submitted at 10:40 pm on September 3. That cover letter and its attachments, including the correct document (last saved at 4:13 pm on Sept. 3) were accepted for filing earlier today, as is shown in the attached.
Out of an abundance of caution, Equinix files this Motion in the event its September 3 filing is deemed to have been submitted out of time. In that event, we believe this Motion should be granted as party’s interests were adversely affected by this inadvertent error, given the timing of the refiling, and as the steps required by the FERC Online team were followed and completed on the same date as the original submission. We respectfully request that this Motion is granted, and that the Commission consider Equinix’s Protest, Request for Clarification and Comments.
Respectfully submitted,
/s/ Arthur Haubenstock
Arthur Haubenstock
Sr. Counsel, Global Regulatory
Equinix Inc.
700 “K” Street, N.W., Suite 600
Washington DC, 20001
(202) 322-9073
ahaubenstock@equinix.com
2 PJM Interconnection, L.L.C., Docket No. ER26-3515-000, Combined Notice of Filings, (Aug. 13, 2026) (establishing a comment date of Sept. 3, 2026).