ER26-3515-000 · 2026-09-03 · Old Dominion Electric Cooperative

Comments of Old Dominion Electric Cooperative re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service

Text extracted from the eLibrary original (SHA-256 8bf33f8788442ac5…). Download the original from the official source.

Contents · 6 sections
  1. I. INTRODUCTION p. 1
  2. II. COMMENTS p. 3
  3. A. PJM’s proposed Large Load Registry requires LSEs to provide information they p. 3
  4. B. PJM should revise its IRAS load reduction framework. p. 7
  5. C. PJM should provide additional clarifications regarding its proposed IRAS. p. 8
  6. III. CONCLUSION p. 9

Read topic-matched comments in ER26-3515

Topics in the text: Registry access · Reliability and curtailment

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text

1 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, L.L.C. ) Docket No.
Read this passage

I. INTRODUCTION

printed heading · Topic match: Registry access

Finally, PJM proposes, beginning with the 2029/20230 Delivery Year, to exclude certain New Large Loads from the Variable 1 PJM Transmittal Letter at 22. 2 Id. at 3. 3 Id. at 3-4. 4 Id. at 3; 36-37. 2 Resource Requirement (“VRR”) Curve in PJM’s Reliability Pricing Model (“RPM”) capacity market.5 PJM…
Read this passage Filed comments: Registry access

II. COMMENTS

printed heading

II.
Read this passage

A. PJM’s proposed Large Load Registry requires LSEs to provide information they

printed heading · Topic match: Registry access

PJM proposes to establish a Large Load Registry that will be used to facilitate implementation of IRAS, among other purposes.9 The Large Load Registry is a key component of PJM’s IRAS proposal, since the Large Load Registry will be used by PJM “to determine the quantity of New Large Loads by…
Read this passage Filed comments: Registry access

B. PJM should revise its IRAS load reduction framework.

printed heading · Topic match: Reliability and curtailment

PJM proposes to require Electric Distributors to execute PJM’s directives to reduce load during Interim Resource Adequacy Service Actions.25 PJM’s IRAS does not consider how the load reductions will need to be carried out.26 Electric Distributors may not have the necessary equipment on site with…
Read this passage Filed comments: Reliability and curtailment

C. PJM should provide additional clarifications regarding its proposed IRAS.

printed heading · Topic match: Reliability and curtailment

PJM proposes to define Large Load as follows: end-use customer(s) load that has a cumulative peak load of 50 megawatts or greater at a single electrical site behind one or more points of interconnection, where for configurations involving multiple affiliated load facilities or multiple points of…
Read this passage Filed comments: Reliability and curtailment

III. CONCLUSION

printed heading · Topic match: Registry access

Clair Thompson Coburn LLP 1909 K Street, N.W., Suite 600 Washington, D.C. 20006-1167 (202) 585-6900 (202) 585-6969 (fax) aclair@thompsoncoburn.com Attorney for Old Dominion Electric Cooperative Dated: September 3, 2026