Motion for Abeyance of PJM Interconnection, L.L.C. (ER26-3380-000 and EL26-108-000), holding the backstop paper hearing pending a new section 205 filing
PJM asks FERC to hold the paper hearing on its Reliability Backstop Procurement rules in abeyance while it prepares a new section 205 filing on cost allocation, Transmission Owner exit and LSE collateral.
Asks FERC to: Hold the paper hearing proceedings and any additional briefing in ER26-3380 and EL26-108 in abeyance pending PJM's new section 205 filing.
Schedule motion in PJM's backstop procurement dockets, which run beside E-7 and concern how PJM secures generation for new large loads, the subject of the E-7 adequacy report.
E-7 PJM: 30-day report on serving large loads with adequate generation (p. 8)
Key points
- PJM requests abeyance of the paper hearing pending a new section 205 filing responding to the September 29 Order.
hold the paper hearing proceedings, including any additional briefings, in this docket in abeyance pending resolution of PJM’s forthcoming filing PDF p. 1
- The September 29 Order accepted the backstop rules but suspended them five months to review cost allocation, Transmission Owner exit rules and LSE collateral.
suspended those rules for five months to allow time for further briefing through a paper hearing process to further review three discrete areas of the RBP: cost allocation, Transmission Owner exit rules, and LSE collateral requirements. PDF p. 1
- PJM plans to file the new section 205 proposal by October 29, 2026.
a new FPA section 205 filing that addresses, inter alia, cost allocation issues, Transmission Owner exit responsibilities, and LSE collateral requirements as they relate to RBP by October 29, 2026. PDF p. 2
Read topic-matched comments in ER26-3380
Topics in the text: Filing procedure · Credit and exit · Cost allocation
What the document says
PDF p. 1
PJM asks FERC to hold the paper hearing while it files a new section 205 proposal.
respectfully requests that the Commission hold the paper hearing proceedings, including any additional briefings, in this docket in abeyance pending resolution of PJM’s forthcoming filing PDF p. 1Filed comments: Filing procedure
PDF p. 2
PJM asks FERC to hold the paper hearing while it files a new section 205 proposal.
PJM plans to submit a new FPA section 205 filing that addresses, inter alia, cost allocation issues, Transmission Owner exit responsibilities, and LSE collateral requirements as they relate to RBP by October 29, 2026. PDF p. 2Filed comments: Cost allocation
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text · Topic match: Filing procedure
Pursuant to Rule 212 of the Federal Energy Regulatory Commission’s (“Commission”) Rules of Practice and Procedure,1 PJM Interconnection, L.L.C. (“PJM”) respectfully requests that the Commission hold the paper hearing proceedings, including any additional briefings, in this docket in abeyance…Read this passage Filed comments: Filing procedure
CERTIFICATE OF SERVICE
printed heading
CERTIFICATE OF SERVICE I hereby certify that I have on this 12th day of October served a copy of the foregoing upon all parties on the service list in these proceedings in accordance with the requirements of Rule 2010 of the Commission’s Rules of Practice and Procedure, 18 C.F.R. § 385.2010. /s/…Read this passage