ER26-3380-000 · 2026-08-21 · The Retail Energy Supply Association

Motion to Intervene and Protest of the Retail Energy Supply Association re PJM Interconnection, LLC's proposed revisions to the Open Access Transmission Tariff

Text extracted from the eLibrary original (SHA-256 354bbae6e30592f1…). Download the original from the official source.

Contents · 9 sections
  1. I. MOTION TO INTERVENE p. 2
  2. A. Correspondence and Communications p. 2
  3. B. RESA p. 2
  4. C. Motion to Intervene p. 3
  5. II. GENERAL COMMENTS p. 3
  6. III. PROTEST p. 5
  7. A. The Commission should Deny PJM’s Default Allocation Proposal and Require p. 5
  8. B. If the Commission Accepts PJM’s Default Allocation Proposal, PJM Should be p. 7
  9. C. The Commission Should Require Certain Commitments and Advance p. 8

Read topic-matched comments in ER26-3380

Topics in the text: Cost allocation · Credit and exit · Reliability and curtailment

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text · Topic match: Cost allocation

ER26-3380-000 MOTION TO INTERVENE AND PROTEST OF THE RETAIL ENERGY SUPPLY ASSOCIATION Pursuant to Rules 211 and 214 of the Federal Energy Regulatory Commission’s (“Commission’s”) Rules of Practice and Procedure, 18 C.F.R. §§ 385.211 and 385.214, the Retail Energy Supply Association (“RESA”)1 hereby…
Read this passage Filed comments: Cost allocation

I. MOTION TO INTERVENE

printed heading

I.
Read this passage

A. Correspondence and Communications

printed heading

Correspondence and Communications Correspondence and communications regarding this matter should be addressed to the following person(s), and the same should also be designated for service on the Commission’s official list for this proceeding: Elizabeth W.
Read this passage

B. RESA

printed heading

RESA RESA is a non-profit trade association of independent corporations that are involved in the competitive supply of electricity and natural gas to end-use consumers.
Read this passage

C. Motion to Intervene

printed heading

Motion to Intervene On July 31, 2026, PJM made a filing to modify the RAA provisions of its Tariff to impose an RBP on a one-time basis to acquire additional capacity due to shortages for 2027/2028 and 2028/2029 Reliability Pricing Model Auctions.
Read this passage

II. GENERAL COMMENTS

printed heading · Topic match: Cost allocation

GENERAL COMMENTS RESA asks that the Commission take note of the need for market certainty and stability and the importance of granular cost allocations consistent with cost causation principles.2 In light of today’s ever increasing capacity prices, rate shock caused by mis-allocated costs will…
Read this passage Filed comments: Cost allocation

III. PROTEST

printed heading

III.
Read this passage

A. The Commission should Deny PJM’s Default Allocation Proposal and Require

printed heading · Topic match: Cost allocation

For these reasons, RESA respectfully requests the Commission reject PJM’s default zonal cost allocation proposal and require PJM to establish an LSE sub-account associated with the Large Load in the PJM system where the costs can be directly assigned.
Read this passage Filed comments: Cost allocation

B. If the Commission Accepts PJM’s Default Allocation Proposal, PJM Should be

printed heading · Topic match: Cost allocation

Accordingly, RESA respectfully requests that the Commission facilitate discussions among and between the states, RERRAs, Electric Distributors and interested Market Participants to assist in implementing the RBP Proposal and RBO.
Read this passage Filed comments: Cost allocation

C. The Commission Should Require Certain Commitments and Advance

printed heading · Topic match: Cost allocation

Thus, RESA asks that the Commission require PJM to publish Reliability Backstop Obligation determinations and cost allocations sufficiently in advance of those solicitations for suppliers to reflect them in their offers.
Read this passage Filed comments: Cost allocation

CERTIFICATE OF SERVICE

printed heading

Dated in Washington, DC this 21st day of August 2026.
Read this passage