ER27-518-000 · 2026-11-16 · LS Power Grid New York Corporation INew York Independent System Operator, Inc.

Exhibit No. GNY-202 to Arzola Testimony

Text extracted from the eLibrary original (SHA-256 ad868f4c4c0add75…). Download the original from the official source.

Read the parent filing

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Pages 1 to 4

page range

Amount 1 GROSS REVENUE REQUIREMENT (page 3, line 79) 12 months $ - REVENUE CREDITS Total Allocator 2 Total Revenue Credits Attachment 1, line 6 - TP 1.0000 - 3 Net Revenue Requirement (line 1 minus line 2) - 4 True-up Adjustment (Attachment 5, line 3, col.
Read this passage

Pages 5 to 8

page range

If the utility is taxed in more than one state, it must attach a work paper showing the name of each state and how the blended or composite SIT was computed.
Read this passage

Pages 9 to 12

page range

Attachment 2 - Cost Support LS Power Grid New York Corporation I Plant in Service Worksheet (Note 2) 1 Calculation of Transmission Plant In Service Source (Less ARO, see Note 1) Year Balance 2 December p206.58.b - - 3 January company records - - 4 February company records - - 5 March company…
Read this passage

Pages 13 to 16

page range

Project names entered on Attachment 1a, Column 2 and Lines 14-23, and on Attachment 5, Lines 14-23, Column B, must match the names entered here.
Read this passage

Pages 17 to 20

page range

The total of Column (q) must equal the amount shown on Appendix A, Line 3. (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) Line Description Net Investment (Note A) Line 41 66 - - 0.00% - - - - - - - - - 66a - - 0.00% - - - - - - - - - 66b - - 0.00% - - - - - - - - - 66c - -…
Read this passage

Pages 21 to 24

page range

Then Monthly Interest Rate shall be equal to the interest rate set forth below on line 13 and be applied to the amount in Column E for a period of 24 months 4.
Read this passage

Pages 25 to 28

page range

76 Account 282 - Accumulated Deferred Income Taxes 77 Beginning Balance - 78 Less: Portion not related to transmission - 79 Less: Portion not reflected in rate base - 80 Subtotal: Portion reflected in rate base Line 77 - line 78 - line 79 - 81 Less: Portion subject to proration Line 95 Col.
Read this passage

Pages 29 to 32

page range

LS Power Grid New York Corporation I Attachment 6c - Accumulated Deferred Income Taxes (ADIT) Proration and Averaging Worksheet Actual Annual Transmission Revenue Requirement (True-up Adjustment) For the 12 months ended 12/31/____ Line No.
Read this passage

Pages 33 to 36

page range

LS Power Grid New York Corporation I Attachment 7 - Depreciation and Amortization Rates For the 12 months ended 12/31/____ Line Account Number FERC Account Rate (Annual)Percent TRANSMISSION PLANT (Note A) 1 350.2 Land Rights 1.43% 2 352 Structures and Improvements 1.60% 3 353 Station Equipment…
Read this passage