EL25-49-000 · 2025-12-08 · Exelon Corporation, AMP Transmission and 8 others

Answer of Indicated PJM Interconnection, L.L.C. Transmission Owners to the 11/21/2025 Motion for Expedited Action filed by Constellation Energy Generation, LLC

Text extracted from the eLibrary original (SHA-256 758ba0eb715e62a0…). Download the original from the official source.

Contents · 7 sections
  1. I. BACKGROUND p. 2
  2. II. ANSWER p. 3
  3. A. Constellation’s Desire for a PJM-Specific Outcome Is Inappropriate p. 3
  4. B. Constellation Would Have the Commission Improperly and Prematurely p. 5
  5. C. Constellation’s Preferred Outcome Raises Significant Affordability and p. 7
  6. D. Nothing Has Changed: The Standard Under Federal Power Act Section p. 11
  7. III. Conclusion p. 14

Read topic-matched comments in EL25-49

Topics in the text: Connecting load and generation · Reliability and curtailment · Cost allocation

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text

EL25-20-000 (consolidated) ANSWER OF THE INDICATED PJM TRANSMISSION OWNERS TO THE MOTION FOR EXPEDITED ACTION OF CONSTELLATION ENERGY GENERATION, LLC Pursuant to Rule 2131 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission (“FERC” or “Commission”), the Indicated PJM…
Read this passage

I. BACKGROUND

printed heading · Topic match: Connecting load and generation

Constellation’s Motion asks that FERC quickly move forward and rule on co-located load issues in PJM, rather than waiting until it has considered and ruled in the aforementioned rulemaking proceeding.10
Read this passage Filed comments: Connecting load and generation

II. ANSWER

printed heading

II.
Read this passage

A. Constellation’s Desire for a PJM-Specific Outcome Is Inappropriate

printed heading

Constellation’s Desire for a PJM-Specific Outcome Is Inappropriate Where the Commission Is Evaluating These Issues at a National Level in the Pending ANOPR Proceeding.
Read this passage

B. Constellation Would Have the Commission Improperly and Prematurely

printed heading · Topic match: Connecting load and generation

Under FPA section 201(b)(1), FERC has jurisdiction over “the transmission of electric energy in interstate commerce and . . . the sale of electric energy at wholesale in interstate commerce.”17 Except as otherwise provided for under the FPA, carved out from FERC’s jurisdiction are “facilities used…
Read this passage Filed comments: Connecting load and generation

C. Constellation’s Preferred Outcome Raises Significant Affordability and

printed heading · Topic match: Reliability and curtailment

Powers (filed Dec. 12, 2024). 8 increased transmission and energy costs for all customers.25 The Market Report asserts that proposals to let data centers remove existing capacity from the market and dedicate it to themselves would create cost shifts and reliability risks until new generation is…
Read this passage Filed comments: Reliability and curtailment

D. Nothing Has Changed: The Standard Under Federal Power Act Section

printed heading · Topic match: Connecting load and generation

The real issue here is cost allocation and the attempt by some to shift to other customers the embedded costs of the transmission system.
Read this passage Filed comments: Connecting load and generation

III. Conclusion

printed heading

Constellation wants to avoid paying for Network Service and asks for quick action to establish a new form of service in PJM to accommodate its desires while the Commission simultaneously considers related national policy direction and solutions.
Read this passage

CERTIFICATE OF SERVICE

printed heading

Dated this 8th day of December, 2025. /s/Alejandro Bautista Alejandro Bautista Assistant General Counsel Exelon Corporation 2301 Market Street Philadelphia, PA 19101 Telephone: 267-533-0120 Email: Alejandro.Bautista@exeloncorp.com