ER26-3515-000 · 2026-09-28 · Corporate Energy Buyers Association

Motion for Leave to Answer and Answer of Corporate Energy Buyers Association to PJM Interconnection, L.L.C.'s 09/23/2026 Answer re the Proposal to Establish…

Text extracted from the eLibrary original (SHA-256 c48aa82fbb975ba8…). Download the original from the official source.

Contents · 7 sections
  1. I. MOTION FOR LEAVE TO ANSWER p. 1
  2. II. ANSWER p. 2
  3. A. PJM conflates reducing the capacity need with providing a Capacity p. 3
  4. B. PJM’s reliance on real-time dispatchability misses the point p. 4
  5. C. PJM’s disparate treatment of customer-sponsored PSAs is unjustified and p. 5
  6. D. Customer-sponsored PSAs and new Capacity Resources are complementary p. 7
  7. III. CONCLUSION p. 7

Read topic-matched comments in ER26-3515

Topics in the text: Reliability and curtailment

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, L.L.C. ) Docket No.
Read this passage

I. MOTION FOR LEAVE TO ANSWER

printed heading · Topic match: Reliability and curtailment

As discussed below, PJM’s arguments do not address an issue that the Commission must help resolve in order to ensure that large load customers can invest with confidence in a full range of solutions to the resource adequacy challenges confronting the PJM region.
Read this passage Filed comments: Reliability and curtailment

II. ANSWER

printed heading · Topic match: Reliability and curtailment

PJM characterizes CEBA and other intervenors as challenging the “omission of Peak Shaving Adjustment MW from [Bring Your Own New Capacity (BYONC)] arrangements” and ultimately concludes that Peak Shaving Adjustments (PSAs) “cannot and should not qualify as BYONC MW capable of reducing [Interim…
Read this passage Filed comments: Reliability and curtailment

A. PJM conflates reducing the capacity need with providing a Capacity

printed heading · Topic match: Reliability and curtailment

PJM conflates reducing the capacity need with providing a Capacity Resource while failing to reconcile its position with its treatment of PSAs under the RBP proposal PJM conflates two distinct ways of addressing a resource adequacy need: adding capacity to meet incremental demand and reducing the…
Read this passage Filed comments: Reliability and curtailment

B. PJM’s reliance on real-time dispatchability misses the point

printed heading · Topic match: Reliability and curtailment

PJM’s reliance on real-time dispatchability misses the point PJM’s observation that PSA MW are not “real-time dispatchable” is irrelevant.10 As PJM itself explains, “[t]he impetus for IRAS is to incent New Large Loads to bring new capacity to meet their resource adequacy needs.”11 If an…
Read this passage Filed comments: Reliability and curtailment

C. PJM’s disparate treatment of customer-sponsored PSAs is unjustified and

printed heading · Topic match: Reliability and curtailment

Yet PJM has established BYONC gating criteria to ensure that Demand Resources and DER Capacity Aggregation Resources provide “new and lasting capacity contributions to the capacity shortfall.”14 Although the criteria may differ, CEBA asks only that customer-sponsored PSAs have a similar opportunity…
Read this passage Filed comments: Reliability and curtailment

D. Customer-sponsored PSAs and new Capacity Resources are complementary

printed heading · Topic match: Reliability and curtailment

Customer-sponsored PSAs and new Capacity Resources are complementary pieces to the resource adequacy puzzle To reiterate, CEBA is not asking the Commission to transform PSAs into Capacity Resources or to require PJM to count PSA MW as BYONC.
Read this passage Filed comments: Reliability and curtailment

III. CONCLUSION

printed heading

CONCLUSION For the foregoing reasons, CEBA respectfully asks that the Commission accept this answer in the record and find that PJM’s IRAS proposal is unjust, unreasonable, and unduly preferential insofar as it provides no mechanism to recognize the reduction in PJM’s capacity 16 PJM Filing, Attach.
Read this passage

CERTIFICATE OF SERVICE

printed heading

Dated at Washington, D.C., this 28th day of September 2026. /s/ John Miller___________________ John Miller Director, Transmission Policy CEBA 1501 M Street, N.W., Suite 900 Washington, D.C. 20005 (240) 630-2201 jmiller@ceba.org